PK0-005認証試験の問題集解答を提供しています [2023年11月]
更新されたPK0-005試験練習テスト問題
Comptia PK0-005認定試験は、プロジェクトマネージャーがスキルと知識を向上させ、プロジェクト管理の専門知識を実証するための優れた方法です。この認定は、プロジェクトのスケジューリング、予算編成、リスク管理、利害関係者管理など、幅広いトピックをカバーしています。また、プロジェクトのコミュニケーション、プロジェクトの品質、プロジェクト変更管理もカバーしています。 CompTIA PK0-005認定試験に合格することにより、プロジェクトマネージャーは、プロジェクトをうまく管理するために必要なスキルと知識があることを雇用主や同僚に示すことができます。
質問 # 28
Which of the following software programs would be BEST to use lo store information related to business transactions?
- A. Content management system
- B. Record management system
- C. Customer relationship management
- D. Enterprise resource planning
正解:C
解説:
Customer relationship management (CRM) software would be the best to use to store information related to business transactions. CRM software is a type of software that helps businesses manage their interactions and relationships with current and potential customers. CRM software can store and organize information such as customer contact details, purchase history, preferences, feedback, complaints, etc. CRM software can help businesses improve customer service, satisfaction, loyalty, retention, and revenue1
質問 # 29
Due to multiple changes, the sign-off for the project scope baseline is delayed. The project sponsor has restricted the budget for this project. Which of the following should the project manager MOST likely do to move forward?
- A. Adjust the scope to stay within the cost.
- B. Communicate with the affected stakeholders.
- C. Set a new cost using a lightweight estimation method.
- D. Initiate a formal change request to modify the cost
正解:B
解説:
The project manager should communicate with the affected stakeholders first after realizing that the sign-off for the project scope baseline is delayed due to multiple changes and that the budget for this project is restricted by the project sponsor. The affected stakeholders are those who have an interest or influence on the project and may be impacted by any changes or delays. Communicating with them can help to explain the situation, assess the impact, seek feedback, and manage expectations.
質問 # 30
A financial manager reports that several employees' allocations from the past month appear to be 200% even though they are only assigned to a particular project. Which of the following could MOST likely be the cause of this issue?
- A. A project manager did not remove the system access.
- B. A project manager did not release the resources
- C. A project manager did not provide the project sign-off.
- D. A project manager assigned the wrong resources.
正解:B
解説:
A project manager did not release the resources. A project manager not releasing the resources could most likely be the cause of this issue where several employees' allocations from the past month appear to be 200% even though they are only assigned to a particular project. Releasing resources is a process of freeing up or reallocating any human or material resources that were used for a project after its completion or closure. Releasing resources can help to update the resource availability and utilization records and avoid any conflicts or errors in resource allocation or reporting.
質問 # 31
A key stakeholder recommends to a senior developer that a new feature be added. The new feature is not part of the current requirement documentation. Which of the following is MOST likely happening?
- A. Scope creep
- B. Project change
- C. Decision-making
- D. Collecting requirements
正解:A
解説:
Explanation
Scope creep is most likely happening when a key stakeholder recommends to a senior developer that a new feature be added that is not part of the current requirement documentation. Scope creep is a term that refers to the uncontrolled expansion or change of a project's scope beyond its original boundaries or objectives. Scope creep can happen due to various reasons, such as changing customer demands, unclear or incomplete requirements, poor communication, lack of change control, or stakeholder interference. Scope creep can have negative impacts on a project, such as delays, cost overruns, quality issues, or reduced customer satisfaction12
質問 # 32
Due to budgetary and time constraints, a PM scheduled a meeting with all stakeholders during the planning phase to review the requirements and come to an agreement on the minimum viable product that would be acceptable. Which of the following would be used to document this input?
- A. Project transition plan
- B. Project communication plan
- C. Project change management plan
- D. Project management plan
正解:D
解説:
The project manager should use the project management plan to document the input from the stakeholders on the minimum viable product that would be acceptable for the project. The project management plan is a document that describes how the project will be executed, monitored, controlled, and closed. It usually includes information such as scope statement, work breakdown structure (WBS), schedule baseline, cost baseline, quality plan, risk plan, communication plan, stakeholder plan, and change management plan. The project management plan can help to define and communicate the project requirements, deliverables, assumptions, constraints, and expectations to all stakeholders involved in the project.
The project management plan would be used to document the input obtained from stakeholders during the meeting to review the requirements and agree on the minimum viable product. The project management plan is a comprehensive document that outlines the approach, scope, schedule, budget, quality, resources, and communication for a project. The document is updated throughout the project lifecycle and serves as a guide for project execution, monitoring, and control. References: CompTIA Project+ Study Guide, Chapter 3: Project Integration Management, Objective 3.3: Identify the components of the project management plan.
質問 # 33
As a result of an approved change, the project manager updates the project plan with the newest project end date. Which of the following change control processes should the project manager complete NEXT?
- A. Conduct an impact assessment.
- B. Communicate the change deployment.
- C. Implement the change.
- D. Document the request in the change control log.
正解:B
解説:
The project manager should communicate the change deployment next after updating the project plan with the newest project end date as a result of an approved change. Communicating the change deployment involves informing all relevant parties about when and how the change will be implemented and what are the expected outcomes and benefits. Communicating the change deployment can help to ensure alignment, readiness, and support for the change and avoid any confusion or resistance.
質問 # 34
Which of the following activities would a project manager perform during the closing phase? (Select THREE).
- A. Stakeholder analysis
- B. Lessons learned
- C. Risk analysis
- D. Removing access
- E. Removing resources
- F. Statement of work sign-off
- G. Acquiring resources
正解:B、D、E
解説:
Lessons learned, removing resources, and removing access are activities that a project manager would perform during the closing phase of a project. Lessons learned is a process of collecting and documenting the knowledge and experience gained from a project for future reference and improvement. Removing resources is a process of releasing or reallocating any human or material resources that were used for the project. Removing access is a process of revoking any permissions or privileges that were granted to the project team members or stakeholders for accessing any systems or data related to the project. These activities can help to finalize and close a project successfully and ensure that all deliverables are transferred, all documentation is approved and archived, all contracts are closed, and all stakeholders are satisfied.
質問 # 35
Which of the following BEST identifies the intent and purpose of a project closeout report?
- A. To provide documentation of lessons learned
- B. To release resources and terminate all access rights
- C. To validate that a project has been successfully completed
- D. To document variances from the initial project baseline
正解:C
解説:
To validate that a project has been successfully completed. The intent and purpose of a project closeout report is to validate that a project has been successfully completed and to summarize the goals, objectives, and outcomes of the project, as well as the lessons learned and the feedback from stakeholders. A project closeout report is a document that is submitted at the end of a project to officially conclude it and release the resources and contracts involved. It is useful for evaluating the project's success and improving the performance of future projects12
質問 # 36
A project manager was not part of a contract negotiation. The project manager is concerned that stakeholders will expect the project to achieve deliverables requested in the RFP Which of the followingdocuments should the project manager produce FIRST to start communication about the boundaries of the project?
- A. Detailed scope statement
- B. Work breakdown structure
- C. Project charter
- D. Milestone chart
正解:C
解説:
Explanation
The project manager should produce a project charter first to start communication about the boundaries of the project. A project charter is a document that formally authorizes a project and defines its high-level scope, objectives, assumptions, constraints, stakeholders, roles and responsibilities, and key deliverables. A project charter can help to communicate the project vision and expectations to all stakeholders and provide a basis for future project decisions23
質問 # 37
Defects associated with project deliverables have been reported. The project team needs to find the cause of the defects. Which of the following tools should the project team use to find the cause?
- A. Kanban board
- B. Pareto chart
- C. Decision tree
- D. Ishikawa diagram
正解:D
解説:
An Ishikawa diagram is a tool that the project team should use to find the cause of the defects associated with project deliverables. An Ishikawa diagram, also known as a fishbone diagram or a cause-and-effect diagram, is a graphical tool that shows the possible causes of a problem or effect using a fishbone-like structure. An Ishikawa diagram can help to identify and analyze the root causes of defects or issues and find solutions to prevent or eliminate them.
質問 # 38
Which of the following criteria would favor using the agile methodology to manage an upcoming project?
- A. Medium risk
- B. Lack of resources
- C. Multiple undefined tasks
- D. Strong projectized organization
正解:C
解説:
Explanation
Multiple undefined tasks would favor using the agile methodology to manage an upcoming project. Agile methodology is a project management framework that breaks projects down into several dynamic phases, commonly known as sprints. Agile methodology is an iterative and adaptive approach that allows teams to respond to changing requirements and customer feedback quickly and effectively. Agile methodology is suitable for projects that have multiple undefined tasks, as it enables teams to prioritize and deliver the most valuable features first, and refine and improve them over time based on user input and testing12
質問 # 39
Which of the following is a test that is done on an existing system to ensure the previous functionality still works after a change has been made?
- A. Regression testing
- B. Unit testing
- C. User acceptance testing
- D. Smoke testing
正解:A
解説:
Regression testing is a type of testing that is done on an existing system to ensure that the previous functionality still works after a change has been made. Regression testing is a process of retesting or verifying that a software system or application still performs as expected after it has been modified or updated with new features, bug fixes, patches, etc. Regression testing can help to detect any errors or defects that may have been introduced by the change and ensure that no functionality has been broken or degraded.
質問 # 40
During a gate review meeting, the deliverable was rejected by the customer.
INSTRUCTIONS
Review the dashboard.
* Part 1: Drag and drop each task, placing them in the correct order based on the project change control process.
* Part 2: Select the proper document(s) to be updated.
If at any time you would like to bring back the initial state of the simulation, please click the Reset All button.
Part 1:
Part 2:
正解:
解説:
See the Explanation for the solution.
Explanation
Part 1:
Change Control Process:
* Consult the RACI matrix.
* Define new requirements and record changes.
* Assess the schedule, risk, and cost.
* Perform a demonstration.
* Obtain a sign off.
* Update and test the deliverable.
* Make an announcement on the company portal.
The change control process is a sequence of steps that helps to manage and document any changes or modifications to a project scope, schedule, cost, quality, or resources. The change control process typically involves the following steps:
* Consult the RACI matrix. A RACI matrix is a tool that defines and clarifies the roles and responsibilities of each team member for each task or activity in a project. RACI stands for responsible, accountable, consulted, and informed. Consulting the RACI matrix can help to identify who needs to be involved or informed about the change request and how to communicate with them.
* Define new requirements and record changes. The new requirements and changes are the details of what needs to be modified or added to the project deliverables or objectives based on the customer feedback or request. Defining and recording the new requirements and changes can help to communicate and justify the need and rationale for the change and its implications on the project scope and quality.
* Assess the schedule, risk, and cost. The schedule, risk, and cost are the aspects of the project that may be affected by the change request. Assessing the schedule, risk, and cost can help to determine the impact and feasibility of the change and identify any possible alternatives or corrective actions to minimize or avoid its negative effects.
* Perform a demonstration. A demonstration is a presentation or show of how the modified or updated deliverable works or meets the customer expectations or requirements. Performing a demonstration can help to validate and verify that the change request has been implemented correctly and effectively and to obtain feedback or approval from the customer or stakeholders.
* Obtain a sign off. A sign off is a formal acceptance and approval of the change request and its deliverables from the customer or stakeholders. Obtaining a sign off can help to confirm that the change request has been completed successfully and satisfactorily and to close the change control process.
* Update and test the deliverable. The deliverable is the product or service that is produced or provided by the project. Updating and testing the deliverable can help to ensure that it meets the quality standards and criteria and that it works as expected after implementing the change request.
* Make an announcement on the company portal. The company portal is a platform or channel that allows internal communication and collaboration among employees within an organization. Making an announcement on the company portal can help to inform and update other team members or departments about the change request and its outcomes and to share any lessons learned or best practices from the change control process.
Part2:
* Risk register: A risk register is a document that identifies, analyzes, and records the potential risks or
* uncertainties that may affect a project. Updating the risk register can help to capture any new or modified risks that may arise from the change request and to plan and implement appropriate risk responses.
* Schedule:A schedule is a document that shows the planned start and end dates, durations, dependencies, and progress of each task or activity in a project. Updating the schedule can help to reflect any changes or adjustments to the project timeline or milestones that may result from the change request and to monitor and control the project performance and delivery.
* Statement of work:A statement of work (SOW) is a document that defines the scope, deliverables, schedule, and terms and conditions of a project or contract. Updating the SOW can help to document any changes or additions to the project scope or deliverables that may be requested or agreed upon by the customer or stakeholders and to ensure alignment and agreement on what needs to be done and how it will be done.
* Change log:A change log is a document that tracks and records any changes or modifications that are made to the project scope, schedule, cost, quality, or resources during a project. Updating the change log can help to document the change request, approval, implementation, and impact of each change and ensure traceability and transparency.
質問 # 41
When creating a project schedule, a project manager adds activities with zero duration. Which of the following describes these types of activities?
- A. Resources
- B. Work breakdown structures
- C. Milestones
- D. Critical paths
正解:C
解説:
Milestones are activities with zero duration that are added to a project schedule by a project manager. Milestones are significant events or achievements in a project that mark the completion of a phase, deliverable, or task. Milestones can help to track and measure the progress and performance of a project and communicate it to stakeholders.
質問 # 42
During a brainstorming meeting, a project manager identifies multiple techniques that will help the project team ensure confidence and alignment with the project scope and goals. Which of the following plans is the project manager creating?
- A. Procurement
- B. Communication
- C. Risk
- D. Quality assurance
正解:D
解説:
Explanation
The project manager is creating a quality assurance plan when identifying multiple techniques that will help the project team ensure confidence and alignment with the project scope and goals during a brainstorming meeting. A quality assurance plan is a plan that defines and documents the standards, criteria, methods, activities, and tools for ensuring and verifying that the quality requirements and expectations of a project are met. A quality assurance plan can help to improve the quality of the project processes and deliverables and prevent or reduce defects or errors.
質問 # 43
Which of the following BEST describes how an organization should coordinate management of multiple related projects?
- A. Use different frameworks
- B. Consult the CCB.
- C. Establish a program.
- D. Apply the SDLC process.
正解:C
解説:
Explanation
The BEST way to coordinate management of multiple related projects is to establish a program. A program is a group of related projects that are managed together to achieve specific strategic business objectives.
References: CompTIA Project+ Study Guide Section 2.2.1
The organization should establish a program to coordinate management of multiple related projects. A program is a group of related projects, subprograms, and program activities that are managed in a coordinated way to obtain benefits and control not available from managing themindividually. A program can help to align multiple projects with strategic goals, optimize resources and risks, and deliver value to stakeholders.
質問 # 44
Which of the following BEST describes how an organization should coordinate management of multiple related projects?
- A. Use different frameworks
- B. Consult the CCB.
- C. Establish a program.
- D. Apply the SDLC process.
正解:C
解説:
The BEST way to coordinate management of multiple related projects is to establish a program. A program is a group of related projects that are managed together to achieve specific strategic business objectives. References: CompTIA Project+ Study Guide Section 2.2.1 The organization should establish a program to coordinate management of multiple related projects. A program is a group of related projects, subprograms, and program activities that are managed in a coordinated way to obtain benefits and control not available from managing them individually. A program can help to align multiple projects with strategic goals, optimize resources and risks, and deliver value to stakeholders.
質問 # 45
During a quality analysis review, the causes of several issues have been highlighted. Which of the following should the project manager use to identify the MOST important causes?
- A. Ishikawa diagram
- B. Scatter diagram
- C. Pareto chart
- D. Decision tree
正解:C
解説:
Explanation
The Pareto chart should be used to identify the most important causes of issues during a quality analysis review. The Pareto chart is a graphical representation of the frequency and impact of different causes, helping to identify the most common and impactful causes. References: CompTIA Project+ Study Guide Section 3.3.3
質問 # 46
A PM has identified all the resources involved in a project. The next step is to identify which resources are responsible for which tasks. Which of the following should be used to document this information?
- A. RFI
- B. SOW
- C. WBS
- D. RACI
正解:D
解説:
The RACI (Responsible, Accountable, Consulted, Informed) matrix is used to document which resources are responsible for which tasks. The RACI matrix is a tool that helps to clarify roles and responsibilities on a project. It assigns a level of responsibility to each resource involved in the project. References: CompTIA Project+ Study Guide Section 3.4.
The project manager should use a RACI matrix to document which resources are responsible for which tasks. A RACI matrix is a type of responsibility assignment matrix (RAM) that plots the roles and responsibilities of resources on a project team. RACI stands for Responsible, Accountable, Consulted, and Informed. A RACI matrix can help to clarify who does what on a project, avoid confusion and duplication of work, and improve communication and collaboration among team members.
質問 # 47
Which of the following is a quality assurance tool?
- A. Assessing employee efficiency
- B. Assessing skill gaps
- C. Defining project goals
- D. Identifying the root cause analysis
正解:D
解説:
Identifying the root cause analysis. Identifying the root cause analysis is a quality assurance tool that can help to find and eliminate the underlying causes of quality problems or defects. Root cause analysis is a systematic process of asking why a problem occurred and tracing it back to its source. Root cause analysis can help to prevent recurrence of the same or similar problems, improve quality performance, and reduce costs and risks12
質問 # 48
A hurricane delays the shipment of critical equipment for a project. Which of the following is BEST to use to document the effects of this delay?
- A. Gantt chart
- B. Change control log
- C. Milestone chart
- D. Issue log
正解:B
解説:
The project manager should use a change control log to document the effects of the hurricane delay on the project. A change control log is a tool that records and tracks any changes that occur during the project lifecycle. It usually includes information such as change ID, description, impact, status, approval, and resolution. A change control log can help to monitor and manage the changes that affect the project scope, schedule, cost, quality, or resources and ensure that they are aligned with the project objectives and stakeholder expectations.
質問 # 49
Which of the following items must be protected as Pll? (Select TWO).
- A. Job title
- B. Date of birth
- C. Home address
- D. Work phone number
- E. Time zone
- F. Blood type
正解:B、C
解説:
Explanation
Home address and date of birth must be protected as personally identifiable information (PII). PII is any information that can be used to identify, contact, or locate an individual person, either alone or in combination with other sources. PII can include information such as name, email address, phone number, social security number, passport number, driver's license number, bank account number, credit card number, biometric data, medical records, etc. PII must be protected from unauthorized access, use, disclosure, modification, or destruction to prevent identity theft, fraud, or other malicious activities that may harm the individual's privacy or security.
質問 # 50
A project sponsor asked the PM to provide a summary of the current financial status. The PM uses the following burn up chart for the analysis:
Based on the chart, which of the following is the current status of the project?
- A. Behind schedule and over budget
- B. Ahead of schedule and under budget
- C. Behind schedule and under budget
- D. Ahead of schedule and over budget
正解:A
解説:
Explanation
The project manager can use the burn up chart to analyze the current status of the project based on its scope (value delivered), budget (cost), and schedule (time). A burn up chart is a graphical tool that shows how much work has been completed (burned up) versus how much work remains (scope) over time. It also shows how much budget has been spent (burned up) versus how much budget remains (budget) over time. A burn up chart can help to monitor and control the project progress and performance and identify any variances or deviations from the plan. The chart given shows that both scope and budget lines are above their respective target lines at any given time point. This means that less work has been completed than planned (scope variance) and more money has been spent than planned (budget variance) at any given time point. Therefore, the project is behind schedule and over budget.
質問 # 51
A project manager realizes that a project will not be completed on time due to resource constraints. Which of the following actions should the project manager take NEXT?
- A. Transfer the risk by hiring a new vendor who was successful on a previous project.
- B. Set up an escalation meeting with the sponsor.
- C. Trigger the contingency plan and communicate with the stakeholders.
- D. Work with the functional managers to create a work-around.
- E. Submit a change request to the change control board.
正解:E
解説:
Explanation
Submit a change request to the change control board. The project manager should submit a change request to the change control board (CCB) if they realize that the project will not be completed on time due to resource constraints. A change request is a formal proposal to modify any aspect of the project, such as scope, schedule, cost, quality, or resources. A change request must be submitted to the CCB, which is a group of stakeholders who are authorized to review and approve changes. Submitting a change request can help to document the impact of the resource constraints on the project and seek approval for any corrective actions or preventive actions12
質問 # 52
......
Comptia PK0-005試験では、プロジェクトの開始、計画、実行、監視、制御、プロジェクトの閉鎖など、プロジェクト管理の基礎をカバーしています。この試験では、プロジェクトのコミュニケーション、リスク管理、およびプロジェクトの制約もカバーしています。また、専門家は、プロジェクトの利害関係者、チーム管理、プロジェクトのドキュメントについても学びます。
Comptia PK0-005(Comptia Project+認定)認定試験は、プロジェクトマネージャーの知識とスキルを検証するグローバルに認められた認定です。この認定は、プロジェクトの計画、実行、監視、管理、閉鎖など、プロジェクトを最初から最後まで管理する候補者の能力をテストするように設計されています。認定試験では、プロジェクトの範囲、スケジュール、予算、リソース、コミュニケーション、リスク、品質管理など、幅広いトピックをカバーしています。