
IBM C1000-132認定ガイドPDFは100%カバー率でリアル試験問題
合格させるC1000-132試験にはリアル問題解答
IBM C1000-132認定試験は、IBM Maximo Manage V8.0の実装でスキルと知識を検証したい専門家にとって不可欠なステップです。これは、個人が自分のキャリアを前進させ、ソフトウェアの実装と構成に関する専門知識を実証するのに役立つ貴重な認証です。
質問 # 22
What combination of information on a Work Order is used to create a histogram in the Graphical Scheduling application?
- A. Labor and Crew Hours
- B. Craft Quantity and Hours
- C. Craft/Skill Level Quantity and Hours
- D. Crew Work Group Quantity and Hours
正解:A
解説:
In the Graphical Scheduling application, a histogram can be created based on the combination of Labor and Crew Hours. This histogram provides a visual representation of the distribution of labor and crew hours across different work orders and helps in identifying areas where the workload is high or low.
質問 # 23
What are three available associations in the Hazards application?
- A. Material Safety Data Sheets (MSDS)
- B. Tag Outs
- C. Precautions
- D. Safety Plans
- E. Lock Outs
- F. Hazardous Materials
正解:A、C、F
解説:
The Hazards application in IBM Maximo Manage v8.0 allows users to associate Material Safety Data Sheets (MSDS), Hazardous Materials, and Precautions with a particular hazard. These associations help in managing safety information related to hazards and in ensuring compliance with safety regulations.
質問 # 24
If additional attributes are added to the Work View, how can they be automatically updated from changes made to a corresponding Ticket and Work Order fields?
- A. by modifying the existing Object Launch Point automation script UpdateWV
- B. by modifying the existing Crossover Domains TKT2WV or W02WV
- C. by adding a Crossover Domain to TICKETID or WONUM
- D. by updating the existing Cron Task UpdateWorkView that has two instances TKT2WV and W02WV that use the Crossover Domains of the same name
正解:B
解説:
In IBM Maximo Manage v8.0 implementation, if you add additional attributes to the Work View and want them to be automatically updated from changes made to corresponding Ticket and Work Order fields, you can modify the existing Crossover Domains TKT2WV or W02WV. Crossover Domains define a mapping between fields on two different objects, allowing data to be synchronized between them.
質問 # 25
In the Meters application what are the three meter types?
- A. FEATURES
- B. CHARACTERISTIC
- C. GAUGE
- D. CALIBRATION
- E. CONSTANT
- F. CONTINUOUS
正解:B、C、F
解説:
In the Meters application, the three meter types are GAUGE, CHARACTERISTIC, and CONTINUOUS. GAUGE meters measure a discrete value or range of values, such as the oil pressure in an engine. CHARACTERISTIC meters measure a specific attribute of an asset, such as the temperature of an engine. CONTINUOUS meters track usage or consumption over time, such as the number of hours an asset has been in operation.
質問 # 26
Which statement is true regarding Master Preventative Maintenance (PM) records?
- A. Associated PM records can only be created for a rotating item's asset.
- B. Associated PM records are temporary and expire after 90 days.
- C. Associated PM records can only be created for a rotating item's location.
- D. Associated PM records can be created for a Master PM which does not have an item
正解:D
解説:
Regarding Master Preventative Maintenance (PM) records in IBM Maximo Manage, associated PM records can be created for a Master PM which does not have an item.
質問 # 27
In which three applications can Asset Depreciation be configured?
- A. Locations
- B. Assets
- C. Asset Templates
- D. Tools
- E. Chart of Accounts
- F. Item Master
正解:A、B、C
解説:
Asset Depreciation can be configured in three applications in IBM Maximo Manage v8.0 according to IBM's documentation. These applications are:
Asset Templates
Assets
Locations
質問 # 28
How many failure reports can be created for the same Work Order?
- A. unlimited failure reports for each work order, but none for a task
- B. one failure report for the work order and only one for each task of the work order
- C. unlimited failure reports for either a work order or any of its tasks
- D. just one failure report
正解:B
解説:
In IBM Maximo Manage, you can create one failure report for a Work Order and only one for each task of the Work Order.
質問 # 29
In the Budget Monitoring application, where are the budget amounts entered?
- A. Budget Line
- B. Focal Point
- C. Budget Rules
- D. Budget Record
正解:A
解説:
the budget amounts in the Budget Monitoring application are entered at the Budget Line level. A Budget Line represents a specific account or category within a budget and allows for detailed tracking and analysis of budget data.
質問 # 30
In the Assets application a used engine needs to be replaced with a rebuilt engine, how might the rebuilt engine inherit the depreciation schedule from the used engine?
- A. Use the action Copy Depreciation Schedules.
- B. Use the action Split Depreciation Schedules.
- C. Use the action Swap Depreciation Schedules.
- D. Use the action Exchange Depreciation Schedules.
正解:A
解説:
To replace a used engine with a rebuilt engine in the Assets application in IBM Maximo Manage v8.0 implementation and inherit the depreciation schedule from the used engine, you can use the "Copy Depreciation Schedules" action. This action allows you to copy the depreciation schedules from the old asset to the new asset, including the depreciation terms and any calculation information.
質問 # 31
Which two records can be included as a contract line item on a Lease/Rental Contract?
- A. Tool
- B. Asset
- C. Non-Rotating Asset
- D. Non-Rotating item
- E. Rotating item
正解:B、E
解説:
In IBM Maximo Manage, two records that can be included as a contract line item on a Lease/Rental Contract are a Rotating item and an Asset.
質問 # 32
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with which setting?
- A. Separate
- B. Autonomous
- C. Discreet
- D. Independent
正解:D
解説:
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with the "Independent" setting. When a security group has the "Independent" setting, its authorization privileges are applied separately from any other security group that the user belongs to.
質問 # 33
How is the Lock Out / Tag Outs application structured?
- A. Specify a Tag Out on the Location or Asset and define the Lock Out Operations.
- B. Specify a Lock Out on an Asset with a Locking Device and define the Tag Out Operations.
- C. Specify a Lock Out on the Location or Asset and define the Tag Out Operations.
- D. Define the isolation procedures on a set of related assets and specify a sequence.
正解:C
解説:
In IBM Maximo Manage v8.0 implementation, the Lock Out / Tag Out application is structured such that you specify a Lock Out on the Location or Asset and define the Tag Out operations. This application is used to manage the procedures and controls put in place to protect personnel from injury due to unintended or inadvertent equipment or system operation.
質問 # 34
How can a Master Preventive Maintenance record be associated with multiple non-rotating assets?
- A. Use the Move/Modify Assets action.
- B. Use the Apply Down Hierarchy action on the Master Preventive Maintenance record.
- C. Add the Assets to the Multiple Assets table on the Master Preventive Maintenance record.
- D. Use an Asset Template.
正解:C
解説:
To associate a Master Preventive Maintenance record with multiple non-rotating assets, we can add the assets to the Multiple Assets table on the Master Preventive Maintenance record. This allows us to associate the preventive maintenance schedule with multiple assets, ensuring that the maintenance activities are performed on each of the associated assets as scheduled.
質問 # 35
To what type of objects can a Service Level Agreement be applied?
- A. any Main Object
- B. only the Main Object that are Internal
- C. only the objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items
- D. only the objects based on the Work Order or Ticket Classes
正解:C
解説:
A Service Level Agreement can be applied only to objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items.
質問 # 36
On a Work Order with no GL Account specified, which GL Account will take precedence?
- A. Location
- B. Job Plan
- C. Asset
- D. Work Order Control Account
正解:D
質問 # 37
The loT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to which two data sources?
- A. IBM Watson loT Platform
- B. Maximo Safety
- C. Maximo Monitor
- D. Maximo Spatial
- E. Maximo Assist
正解:A、C
解説:
IoT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to C. IBM Watson IoT Platform and E. Maximo Monitor data sources. The IoT Connector in the Administration Work Center can be used to configure a connection to an IoT platform such as IBM Watson IoT Platform and IBM Maximo Asset Monitor1.
質問 # 38
In the Receiving application, what are the three statuses that show the overall receipt status of the purchase order?
- A. VOID
- B. PARTIAL
- C. WINSP
- D. RETURNED
- E. NONE
- F. COMPLETE
正解:B、E、F
解説:
In the Receiving application in IBM Maximo Manage, the three statuses that show the overall receipt status of the purchase order are COMPLETE, PARTIAL and NONE.
質問 # 39
Which two automation script launch points can be triggered directly by a workflow?
- A. Attribute - '
- B. Object
- C. Custom Condition
- D. Integration
- E. Action
正解:C、E
解説:
two automation script launch points that can be triggered directly by a workflow are B. Custom Condition and D. Action. An action launch point associates a script with an action and executes when the specified action occurs1. A custom condition launch point associates a script with a condition and executes when the specified condition is evaluated2.
質問 # 40
Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?
- A. Warning Limit
- B. Measurement Limit
- C. Action Limit -
- D. Meter Limit
正解:C
解説:
In IBM Maximo Manage, the Action Limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type.
質問 # 41
In the Work Order Tracking application, a Work Order is generated from a Preventive Maintenance (PM) record. How is the target finish date calculated?
- A. the PM target finish date
- B. the Job Plan start date + the Job Plan duration
- C. the Job Plan finish date
- D. the Work Order target start date + the Job Plan duration
正解:D
解説:
In the Work Order Tracking application, when a Work Order is generated from a Preventive Maintenance (PM) record, the target finish date is calculated as the Work Order target start date + the Job Plan duration.
質問 # 42
Which Maximo Application Suite add-on enables managing certificates for assets and training requirements for personnel?
- A. Service Provider
- B. Maximo HR Manager
- C. Asset Configuration Manager
- D. Health, Safety and Environment (HSE)
正解:D
解説:
The Health, Safety and Environment (HSE) add-on in the IBM Maximo Application Suite enables managing certificates for assets and training requirements for personnel. This add-on provides functionality for managing health and safety risks, including compliance with regulations, management of environmental incidents, and tracking of personnel certifications and training.
質問 # 43
Calendars can be associated with which three record types?
- A. Locations
- B. Person
- C. Assets
- D. Job Plan
- E. Items
- F. Contracts
正解:A、B、C
質問 # 44
In which application can a Contract property default be set for a specific contract type, for example Is early termination allowed by the Customer?
- A. Contract Administration
- B. System Properties
- C. Organizations
- D. Database Configuration
正解:A
解説:
The Contract Administration application is used to set contract property defaults for specific contract types. For example, you can set whether early termination is allowed by the customer for a specific contract type.
質問 # 45
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with which setting?
- A. Separate
- B. Autonomous
- C. Discreet
- D. Independent
正解:D
解説:
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with the "Independent" setting. When a security group has the "Independent" setting, its authorization privileges are applied separately from any other security group that the user belongs to.
質問 # 46
When viewing a Storeroom in the Manage Inventory Work Center, what are three record sets (tabs) that can be viewed?
- A. Reconcile
- B. Year to Date Figures
- C. Vendors
- D. Balances
- E. Counts
- F. Child Storerooms
正解:D、E、F
解説:
In IBM Maximo Manage v8.0 implementation, when viewing a Storeroom in the Manage Inventory Work Center, the three record sets (tabs) that can be viewed are Child Storerooms, Counts, and Balances. These record sets provide different views of the inventory and allow users to manage and track inventory levels and movements.
質問 # 47
......
100%無料C1000-132日常練習試験には66問があります:https://jp.fast2test.com/C1000-132-premium-file.html