C1000-132試験問題集を提供していますIBM問題 [Q19-Q41]

Share

C1000-132試験問題集を提供していますIBM問題

C1000-132認定ガイドPDFはリアル試験問題で100%カバー率


IBM Maximo Manage v8.0 Implementationの認定を取得するためにIBM C1000-132試験に合格することは、アセット管理の専門知識とIBMのエンタープライズ・アセット管理ソフトウェアを実装および構成する能力を示す貴重な資格です。この認定は、アセット管理の産業における新しいキャリア機会を開拓し、高い給与を得る可能性があります。

 

質問 # 19
What is a core application in Maximo Manage?

  • A. Maintenance Version Control
  • B. Permit to Work
  • C. Customer Billing
  • D. Graphical Scheduling

正解:B

解説:
The Permit to Work application is a core application in IBM Maximo Manage v8.0. This application allows users to manage work permits, ensure compliance with safety regulations, and ensure that work is authorized before it is started. Other core applications in Maximo Manage include Work Order Tracking, Asset Management, and Inventory Management.


質問 # 20
In what Maximo Manage application are the specifications of an asset for calibration entered?

  • A. Classifications
  • B. Data Sheet Template
  • C. Improvements
  • D. Asset

正解:B

解説:
In IBM Maximo Manage, the specifications of an asset for calibration are entered in the Data Sheet Template application.


質問 # 21
Which statement is true regarding Master Preventative Maintenance (PM) records?

  • A. Associated PM records can be created for a Master PM which does not have an item
  • B. Associated PM records can only be created for a rotating item's asset.
  • C. Associated PM records are temporary and expire after 90 days.
  • D. Associated PM records can only be created for a rotating item's location.

正解:A

解説:
Regarding Master Preventative Maintenance (PM) records in IBM Maximo Manage, associated PM records can be created for a Master PM which does not have an item.


質問 # 22
In which application can a Contract property default be set for a specific contract type, for example Is early termination allowed by the Customer?

  • A. System Properties
  • B. Database Configuration
  • C. Organizations
  • D. Contract Administration

正解:D

解説:
The Contract Administration application is used to set contract property defaults for specific contract types. For example, you can set whether early termination is allowed by the customer for a specific contract type.


質問 # 23
A user wishes to perform the same work tasks on several assets simultaneously. How can this be configured?

  • A. A Route should be created with each stop being one Asset and the Job Plan associated with the Route record.
  • B. A Work Order Hierarchy should be created against the same Job Plan used for all stops.
  • C. The Assets should be specified on the Multiple Assets, Locations and CIs table on the Work Order.
  • D. A Master Job Plan should be created with Tasks for each Asset.

正解:A

解説:
To perform the same work tasks on several assets simultaneously, a route can be created in the Routes application. A route is a series of work orders that are generated in a specific sequence to maintain a group of assets. Each stop in the route can be associated with a specific asset, and the job plan can be assigned to the route record, which means the same job plan tasks can be performed on each asset.


質問 # 24
Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?

  • A. Action Limit -
  • B. Measurement Limit
  • C. Meter Limit
  • D. Warning Limit

正解:A

解説:
In IBM Maximo Manage, the Action Limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type.


質問 # 25
A company wishes to configure Flow Control for Work Orders. In which application can they change the Start Status and Complete Status that will be used?

  • A. Job Plans
  • B. Organizations
  • C. System Properties
  • D. Work Order Tracking

正解:B

解説:
The Organizations application is used to configure Flow Control for Work Orders. In this application, you can change the Start Status and Complete Status that will be used.


質問 # 26
In the Inventory Usage application when the type is TRANSFER, if a user changes the status to COMPLETE what type of transaction record is created?

  • A. Transaction Type TRANSFER in MATRECTRANS table
  • B. Transaction Type ISSUE in MATUSETRANS table
  • C. Transaction Type RETURN in MATUSETRANS table
  • D. Transaction Type SHIPTRANSFER in MATRECTRANS table

正解:D

解説:
In the Inventory Usage application when the type is TRANSFER, if a user changes the status to COMPLETE a transaction record of type SHIPTRANSFER is created in the MATRECTRANS table.


質問 # 27
On a Work Order with no GL Account specified, which GL Account will take precedence?

  • A. Work Order Control Account
  • B. Location
  • C. Job Plan
  • D. Asset

正解:A


質問 # 28
What is a licensing method used to obtain the Maximo Asset Suite?

  • A. User credits license
  • B. Feature based license
  • C. Cloud based license
  • D. Monthly license

正解:C

解説:
One licensing method used to obtain the Maximo Asset Suite is a Cloud based license.


質問 # 29
When a Service Level Agreement is applied to a WORKORDER object, what Commitment Type will be missing from the lookup?

  • A. DOWNTIME
  • B. AVAILABILITY
  • C. CONTACT
  • D. DELIVERY

正解:D

解説:
When a Service Level Agreement (SLA) is applied to a WORKORDER object in IBM Maximo Manage v8.0 implementation, the Commitment Type that will be missing from the lookup is DELIVERY. The other possible Commitment Types in Maximo Manage are DOWNTIME, AVAILABILITY, and CONTACT.


質問 # 30
To what type of objects can a Service Level Agreement be applied?

  • A. only the objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items
  • B. only the objects based on the Work Order or Ticket Classes
  • C. only the Main Object that are Internal
  • D. any Main Object

正解:A

解説:
A Service Level Agreement can be applied only to objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items.


質問 # 31
What is the result of selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions?

  • A. Only valid GL accounts can be used.
  • B. Any GL component can be used.
  • C. Validates transactions occurred during an active financial period.
  • D. Any valid GL component can be used.

正解:A

解説:
When selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions in IBM Maximo Manage, only valid GL accounts can be used.


質問 # 32
Which statement is true regarding Work Assets in the Safety Plans application?

  • A. A Work Asset is either an Asset, Asset Type, or a Location. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.
  • B. A Work Asset is either a Location or an Asset. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.
  • C. A Work Asset is either a Location or an Asset. A user needs to specify at least one of these for each record.
  • D. A Work Asset is either a Rotating Item, a Location, or an Asset. A user needs to specify at least one of these for each record.

正解:C

解説:
In the Safety Plans application, a Work Asset is either a location or an asset that requires the safety plan. Each safety plan record must have at least one work asset specified, and the work asset can be a location or an asset.


質問 # 33
In the Receiving application, what are the three statuses that show the overall receipt status of the purchase order?

  • A. NONE
  • B. RETURNED
  • C. WINSP
  • D. COMPLETE
  • E. PARTIAL
  • F. VOID

正解:A、D、E

解説:
In the Receiving application in IBM Maximo Manage, the three statuses that show the overall receipt status of the purchase order are COMPLETE, PARTIAL and NONE.


質問 # 34
When working with Purchase Requests, which statement is correct?

  • A. All Purchase Requests must be approved by an authorized person.
  • B. Purchase Request Description is mandatory in the header section.
  • C. One Purchase Request can contain both Item and Material type lines
  • D. Purchase Request must have a vendor specified.

正解:C

解説:
When working with Purchase Requests in IBM Maximo Manage, one Purchase Request can contain both Item and Material type lines.


質問 # 35
Which two domain types can have a specified error message?

  • A. TABLE
  • B. CROSSOVER
  • C. NUMERIC
  • D. SYNONYM
  • E. ALN

正解:A、E

解説:
In IBM Maximo Manage, the two domain types that can have a specified error message are TABLE and ALN.


質問 # 36
Apart from Standard and Average, what other three costing methods can be used in the Inventory application?

  • A. LILO
  • B. FILO
  • C. Weighted Average
  • D. Asset
  • E. LIFO
  • F. FIFO

正解:C、E、F

解説:
Apart from Standard and Average costing methods in IBM Maximo Manage's Inventory application, three other costing methods that can be used are FIFO (First In First Out), LIFO (Last In First Out) and Weighted Average.


質問 # 37
In the Purchase Requisitions application and with default settings, what status does the Purchase Requisition change to when all of its lines have been copied to a Purchase Order or a Contract?

  • A. APPR
  • B. COMPLETE
  • C. CLOSE
  • D. INPRG

正解:B

解説:
In the Purchase Requisitions application with default settings in IBM Maximo Manage, when all lines of a Purchase Requisition have been copied to a Purchase Order or a Contract, the status of the Purchase Requisition changes to COMPLETE.


質問 # 38
What is the purpose of the Admin mode?

  • A. change System Properties without needing to shut down the Maximo server
  • B. perform administrative functions
  • C. apply changes in Application Designer
  • D. perform Database Configuration without needing to shut down the Maximo server

正解:D

解説:
The purpose of Admin mode in IBM Maximo Manage is to allow users to perform Database Configuration without needing to shut down the Maximo server.


質問 # 39
Select all that apply
What is the appropriate order of phases in order to create a workflow process?

正解:

解説:

1 - Create the process
2 - Validate the process
3 - Enable the process


質問 # 40
In which two places can Service Request Categories be created for use in the Service Request Work Center?

  • A. Classifications Application
  • B. Business Analysis Work Cen
  • C. Service Desk Application
  • D. Administration Work Center
  • E. Service Catalog Application

正解:D、E

解説:
In IBM Maximo Manage, Service Request Categories can be created for use in the Service Request Work Center in two places - the Administration Work Center and the Service Catalog Application.


質問 # 41
......

合格させるC1000-132試験にはリアル問題解答:https://jp.fast2test.com/C1000-132-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어