2026年最新のCMRP問題集の無料PDFゲットせよ!最近更新された問題 [Q46-Q69]

Share

2026年最新のCMRP問題集の無料PDFゲットせよ!最近更新された問題

CMRP認定試験問題集には192練習テスト問題

質問 # 46
With regard toquality of goods and serviceswhich of the following is true in all economies?

  • A. When demand exceeds supply (seller's market), sellers are forced to increase quality standards.
  • B. A surplus of goods (buyer's market) results in a relaxing of quality standards.
  • C. When a surplus of goods exists (buyer's market), buyers force sales prices up.
  • D. A shortage of goods (seller's market) results in a relaxation of quality standards.

正解:D


質問 # 47
Which of the following are leading tools or techniques to identify Maintenance and Reliability process improvements?
1. Total Productive Maintenance
2. Reliability Centered Maintenance
3. Historical analysis of spending patterns
4. Process benchmarking with industry leaders

  • A. 1, 2, 4
  • B. 1, 2, 3
  • C. 1, 3, 4
  • D. 2, 3, 4

正解:A


質問 # 48
metric for measuring how well a process is operating by evaluating the three major process components: availability, performance efficiency (rate/speed) and quality. The process can be a single piece of equipment, a manufacturing cell, a production line or a plant

  • A. mean metrics
  • B. Overall Equipment Effectiveness (OEE) equation
  • C. Mean Time Between Maintenance (MTBM) Formula
  • D. Overall Equipment Effectiveness (OEE) definition

正解:D


質問 # 49
The metric is the number of hours of formal training that maintenance personnel receive annually. It is expressed as hours per employee

  • A. Preventive Maintenance Cost
  • B. Maintenance Training Hours
  • C. Performance Efficiency
  • D. Maintenance Unit Cost Formula

正解:B


質問 # 50
What is the most common reason for adopting a Total Quality Management system?

  • A. To improve customer satisfaction
  • B. To decrease delivery time
  • C. To reduce delivery expenses
  • D. To increase employee buy-in

正解:A

解説:
The most common reason for adopting a Total Quality Management system is to improve customer satisfaction. Total Quality Management systems are designed to anticipate and meet the expectations of customers. It may be that the implementation of a Total Quality Management system will diminish delivery time and expense, but these are not the primary goals of implementation. Similarly, increased employee buy-in is necessary for the implementation of a TQM system, and may indeed be one of the positive byproducts of such implementation, but it is not the reason for implementing TQM.


質問 # 51
Utilization Time % × Availability % × Performance Efficiency % × Quality Rate
% → Total Effective Equipment Performance (TEEP)

  • A. True
  • B. False

正解:B


質問 # 52
The most effective method of performance evaluation is:

  • A. A behaviorally anchored rating scale process.
  • B. A continuous feedback process.
  • C. A field review process.
  • D. A forced ranking process.

正解:A


質問 # 53
What is the preferred method of obtaining failure information from operator rounds when the consequences of failure are severe and there is reason to doubt whether the tasks will be done without a formal reminder?

  • A. Maintenance checks incorporated into standard operating procedures
  • B. Train the operators in such a way that the inspections become second nature
  • C. Formal written or electronic checklist performed on a regular schedule
  • D. Displaying the inspection schedule in a prominent location

正解:C


質問 # 54
An employee fells to use his safety goggles on the job and. as a result, incurs an eye irritation from fumes.
This incident is an example of a(n):

  • A. Unrecognized hazard
  • B. Unsafe act
  • C. Unsafe condition
  • D. Willful safety violation

正解:B


質問 # 55
This metric is the ratio of the benefit to the cost of training internal maintenance employees.

  • A. Maintenance cost will decrease as reliability increases. (T/F)
  • B. Condition Based Maintenance Cost
  • C. Maintenance Training ROI Formula
  • D. Maintenance Training Return on Investment (ROI)

正解:D


質問 # 56
How do freight costs affect the inventory of a retailer?

  • A. Freight costs increase inventory.
  • B. Freight costs do not affect inventory.
  • C. Freight costs may increase or decrease inventory.
  • D. Freight costs decrease inventory.

正解:A

解説:
Freight costs are inventoriable, because they are directly incurred during the process of bringing a product to the condition and location in which it can be sold. Therefore, freight-in costs increase inventory value.


質問 # 57
The number of units produced during a designated time period. → Availability Formula

  • A. True
  • B. False

正解:B


質問 # 58
The metric is the amount of money spent annually maintaining assets, divided by the Replacement Asset Value (RAV) of the assets being maintained, expressed as a percentage

  • A. Total Maintenance Cost As a Percent of Replacement Asset Value (RAV) Formula
  • B. Total Maintenance Cost As a Percent of Replacement Asset Value (RAV)
  • C. Maintenance Training Hours
  • D. TOTAL MAINTENANCE TRAINING COST

正解:B


質問 # 59
Preventive Maintenance is defined as: Maintenance tasks, including inspection, service and or replacement, conducted at regular, scheduled intervals of calendar or operating time established to avoid failure based on average statistical anticipated lifetime. There are cautions regarding the application of PM: No more than "A" percent of total failures are time based, wear out, in nature. .... thus. PM is an ineffective avoidance action for about *'B" percent of probable failures.
Options

  • A. A = 80; B = 20
  • B. A = 20; B = 80
  • C. A = 40; B = 60
  • D. A = 60; B = 40

正解:A


質問 # 60
Which of the following is not a typical element of a performance agreement between maintenance and operations?

  • A. Agreed upon staffing levels
  • B. Call-out procedures and guidelines
  • C. Repair response time targets
  • D. Machine availability targets

正解:D


質問 # 61
What is a standard methodology to reduce or increase the frequency of a PM inspection?

  • A. American Society of Mechanical Engineers (ASME)
  • B. Risk Based Inspection (RBI)
  • C. American Petroleum Institute (API)
  • D. American National Standards Institute (ANSI)

正解:B


質問 # 62
Process measures are leading indicators that offer an indication of task performance with a lead time to manage for successful results. All of the following are examples of leading indicators except:

  • A. % rework.
  • B. Asset Availability.
  • C. % planned maintenance.
  • D. planner to craft workers ratio.

正解:B


質問 # 63
(%) = [Preventive Maintenance Cost ($) ÷ Total Maintenance Cost ($)] ×
100 → Corrective Maintenance Hours Formula

  • A. True
  • B. False

正解:B


質問 # 64
What is defined as "the supervision of a process designed to alter and improve the function of a business"?

  • A. Strategic Planning
  • B. Change Management
  • C. Commitment Management
  • D. Incremental Management

正解:B


質問 # 65
A Company produced 80.000 tons of "Good Product" last year, and the Sales department has projected a 5% increase in sales during the coming year. Production Statistics:
1.The production line operates 24 hours per day. seven days per week, except for the downtime listed below.
2.The production line downtime for maintenance averaged 108 hours per month during the past year.
3.The production line was shut down three times during the year due to power interruptions, for a total of 18 hours of downtime.
4.The production operators' union has threatened a strike that may last as long as three weeks if it occurs.
5.The production rate is expected to stay the same as last year's production rate.
6.Power interruption downtime is expected to stay the same as last year.
Based on the Production Statistics shown, what is the required production line availability to meet the sales projected for next year?

  • A. 86.50%
  • B. 89.50%
  • C. 88.50%
  • D. 93.50%

正解:B


質問 # 66
measure of the variables inherent in the design that affect availability. In the calculation of downtime, it usually includes only active repair time. It does not include preventive maintenance time and administrative or logistic delays, but does include corrective maintenance downtime → Maintenance Action

  • A. True
  • B. False

正解:B


質問 # 67
The 'Karl Fischer Method' measures:

  • A. The conductivity in micro-ohms, of a sample of cooling tower water.
  • B. The viscosity of an oil sample based on its flow rate through a calibrated orifice.
  • C. The count in parts per million (ppm), of coliform bacteria in a sample of cooling tower water.
  • D. The amount of water in a sample of oil, in ppm.

正解:D


質問 # 68
the sum of all costs for formal training that is directed at improving job skills for maintenance employees

  • A. TOTAL MAINTENANCE TRAINING COST
  • B. Total Maintenance Cost As a Percent of Replacement Asset Value (RAV)
  • C. Corrective Maintenance Cost
  • D. Maintenance Training Hours

正解:A


質問 # 69
......

最新CMRP試験問題集には高得点で一発合格:https://jp.fast2test.com/CMRP-premium-file.html

SMRP CMRP実際の問題とブレーン問題集:https://drive.google.com/open?id=15xn9HcFl8xiS2Rxg1cjvWNipu8txnqlr


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어