質問 # 47
The primary purpose of operation's involvement in the maintenance program is to:
- A. Improve plant (facility) housekeeping and decrease contractors.
- B. Reduce maintenance workforce staffing and maintenance costs.
- C. Increase the skill levels of operations.
- D. Increase stakeholder contributions to asset maintenance.
正解:D
質問 # 48
the percentage of total maintenance labor hours used to restore equipment to a functional state after a failure or when failure is imminent
- A. Corrective Maintenance Hours
- B. Condition Based Maintenance Cost
- C. TOTAL MAINTENANCE TRAINING COST
- D. Preventive Maintenance Cost Formula
正解:A
質問 # 49
corrective work done on previously maintained equipment that has prematurely failed due to maintenance, operations or material problems
- A. Rework
- B. mean metrics
- C. Rework Formula
- D. Idle Time
正解:A
質問 # 50
What is the relationship between leading indicator metrics and lagging indicator metrics in the field of Maintenance and Reliability?
Options
- A. Leading indicators are measures thatreflect accomplishment of goalswhile lagging indicators are measures of what must be done to improve results.
- B. Leading indicators are low level measures that reflect accomplishment of goals, while lagging indicators are measures of what must be done to improve results.
- C. Lagging indicators are measures that reflect accomplishment of goals, while leading indicators are measures of what must be done to improve results.
- D. Leading indicators are used by management, while lagging indicators are used by personnel on the shop floor.
正解:A
質問 # 51
A reliability block diagram is used in the analysis of plant machinery:
- A. OEE (OverallEquipment Effectiveness).
- B. downtime.
- C. availability.
- D. productivity.
正解:B
質問 # 52
Inwhich of the following circumstances might it be appropriate to conduct a Failure Modes and Effects Analysis?
- A. A custom-made production machine, critical to meeting production requirements, has failed for a third time in six months. The Maintenance Department has carefully inspected the machine after each failure, and each failure has been attributed to a loss of lubrication to the machine's bearings.
- B. The Maintenance Department has assumed responsibility for maintenance of the equipment in a small production line acquired after buyout of a smaller competitor. The competitor uses equipment that is different from the company's existing equipment.
- C. The Production Department has added a third production shift to meet increased sales. The new shift will be staffed mostly of new employees whose training consists of two weeks working with the day shift. Adding the third shift also increases equipment operating hours by 50%.
- D. Corporate downsizing has reduced the staff of the Maintenance Department to two Reliability Technicians and two foremen for each craft (trade). These foremen will now manage contracted maintenance crews for all plant (facility) maintenance activities.
正解:B
質問 # 53
How do you avoid the pitfall of the Maintenance and Reliability Program appearing to have littlevalue to the organization?
- A. Claim the success of the company is directly related to the Maintenance and Reliability program
- B. Use a systematic approach to ensure business goals drive the effort
- C. Implement all available predictive technology techniques
- D. Establish a comprehensive communication program including e-mail web page, and newsletter
正解:B
質問 # 54
Which of the following reduces the revenues of a manufacturer the most?
- A. Income taxes
- B. Selling and administrative expenses
- C. Cost of goods sold
- D. Cost of goods manufactured
正解:C
解説:
The cost of goods sold reduces the revenues of a manufacturer the most. The cost of goods sold is comprised of the costs of materials, labor, and overhead. The cost of goods sold may be determined by subtracting the ending finished goods inventory from the total goods available for sale, which itself is determined by adding the cost of goods manufactured to the beginning finished goods inventory. The cost of goods sold is then subtracted from sales to yield the gross margin. Selling and administrative expenses are subtracted from the gross margin to yield operating income. Net income is determined by subtracting interest expense, income tax expense, and other expenses and losses from operating income.
質問 # 55
Which one of the followingwork order characteristics addthe most value to the business?
- A. Correct charge codes used
- B. Closed in a timely manner
- C. Work completed is well-documented
- D. Proper authorization
正解:C
質問 # 56
The amount of time an asset is idle or waiting to run. It is the sum of the times when there is no demand, feedstock or raw material and other administrative idle time (e.g. not scheduled for production).
- A. mean metrics
- B. Inherent Availability
- C. Corrective Maintenance Hours
- D. Idle Time
正解:D
質問 # 57
Which of the following is the best definition of a work-team?
- A. The team defines direction and conducts peer performance assessments.
- B. The team defines mission and direction Supervision and the team are responsible for accomplishing the goals.
- C. Supervision defines mission, direction, and assesses performance. The team is largely self-governing and is responsible for accomplishing goals.
- D. Supervision provides all work direction and holds the team accountable for results.
正解:C
質問 # 58
In lean Manufacturing environment which formula most accurately defines profit?
- A. Profit = (price-cost) X volume
- B. Profit = (Price-Cost)/Volume
- C. Profit = Price - Cost
- D. (Price-Cost-Waste)/Volume
正解:D
質問 # 59
For maximum effectiveness maintenance tasks should be allocated to:
- A. Operations and/or maintenance depending on availability.
- B. Multiskilled maintenance technicians performing all maintenance tasks.
- C. Operations performing minor maintenance and multiskilled technicians performing complex maintenance tasks.
- D. A contracted maintenance person to handle all aspects of maintenance.
正解:C
質問 # 60
Vibration monitoring can detect all but which one of the following?
- A. Uniform Impeller Wear
- B. Misalignment
- C. Worn coupling
- D. Soft foot
正解:A
質問 # 61
% = [Condition Based Maintenance Cost ($) ÷ Total Maintenance Cost ($)] × 100
- A. Condition Based Maintenance Cost Formula
- B. Maintenance Training Return on Investment (ROI)
- C. Mean Time Between Maintenance (MTBM) Formula
- D. Equipment Availability Formula
正解:A
質問 # 62
......
検証済みのCMRP問題集と解答で一年間無料最速更新:https://jp.fast2test.com/CMRP-premium-file.html
最新のSMRP CMRP認定の練習テスト問題:https://drive.google.com/open?id=15xn9HcFl8xiS2Rxg1cjvWNipu8txnqlr