質問 # 34
Which of the following methods best identifies maintenance problems caused by maintenance or operating work processes?
- A. Weibull Analysis
- B. Root Cause Failure Analysis
- C. Pareto Analysis
- D. Bottleneck Analysis
正解:B
質問 # 35
Which of the following cannot be considered on-condition technique?
- A. Infrared inspection of an electrical bus bar every year.
- B. Measurements of tire tread depth with a coin every month.
- C. Replacements of car air filter every 12000miles
- D. Gear box oil analysis every 6 months.
正解:C
質問 # 36
Work done to restore the function of an asset after failure or when failure is imminent.
- A. Corrective Work
- B. Corrective Maintenance Hours Formula
- C. Rework
- D. Quality Rate
正解:A
質問 # 37
The maintenance function should be viewed in value added terms and should be associated with profit and the optimization of maintenance costs. When developing the maintenance budget, it is important to:
- A. Increase last year's budget by approximately 9.5% to 12% and be prepared to reduce the budgeted amount after management reviews the budget.
- B. Determine, through benchmarking, the percentage of money spent on maintenance compared to the Replacement Asset Value of equipment.
- C. Base the budget on the individual needs of each specific equipment item annually.
- D. Review the budget from the previous year and increase the budget for the upcoming year based on the effects of inflation.
正解:C
質問 # 38
defined as the percentage of time that the process is actually operating (uptime) compared to when it is scheduled to operate
- A. Maintenance Training Cost
- B. Lagging Indicator
- C. Availability
- D. Maintenance Unit Cost
正解:C
質問 # 39
Design Phase
- A. The inventory turnover ratio for MRO store should be:
- B. The biggest benefit of failure modes and effects analysis occurs during:
- C. The best method of measuring the reliability of an asset is by?
- D. The 6th S in 6S (also called 5S plus) stands for safety. (T/F)
正解:B
質問 # 40
The metric is the value of maintenance, repair and operating materials (MRO) and spare parts stocked on site to support maintenance, divided by the Replacement Asset Value (RAV) of the assets being maintained at the plant, expressed as a percentage
- A. Stocked MRO Inventory Value As a Percent of Replacement Value (RAV)
- B. Stocked MRO Inventory Value As a Percent of Replacement Value (RAV) Formula
- C. Ratio of Replacement Asset Value (RAV) to Craft-Wage Headcount Formula
- D. Maintenance Training Return on Investment (ROI)
正解:B
質問 # 41
Inwhich of the following circumstances might it be appropriate to conduct a Failure Modes and Effects Analysis?
- A. Corporate downsizing has reduced the staff of the Maintenance Department to two Reliability Technicians and two foremen for each craft (trade). These foremen will now manage contracted maintenance crews for all plant (facility) maintenance activities.
- B. A custom-made production machine, critical to meeting production requirements, has failed for a third time in six months. The Maintenance Department has carefully inspected the machine after each failure, and each failure has been attributed to a loss of lubrication to the machine's bearings.
- C. The Maintenance Department has assumed responsibility for maintenance of the equipment in a small production line acquired after buyout of a smaller competitor. The competitor uses equipment that is different from the company's existing equipment.
- D. The Production Department has added a third production shift to meet increased sales. The new shift will be staffed mostly of new employees whose training consists of two weeks working with the day shift. Adding the third shift also increases equipment operating hours by 50%.
正解:C
質問 # 42
The amount of time an asset is idle or waiting to run. It is the sum of the times when there is no demand, feedstock or raw material and other administrative idle time (e.g. not scheduled for production).
- A. mean metrics
- B. Inherent Availability
- C. Idle Time
- D. Corrective Maintenance Hours
正解:C
質問 # 43
What is the first method that should be considered for controlling noise exposure?
- A. reduction of noise transmitted
- B. reduction of noise at its source
- C. develop noise transmission standards in equipment specifications
- D. personal protective equipment
正解:C
質問 # 44
the ratio of the benefit to the cost of training maintenance employees
- A. Maintenance Action
- B. Maintenance Training Hours Formula
- C. Maintenance training ROI
- D. Maintenance Unit Cost Formula
正解:C
質問 # 45
Which inventory system requires regular physical inventory counts?
- A. Both periodic and perpetual
- B. Neither periodic nor perpetual
- C. Periodic
- D. Perpetual
正解:A
解説:
Both the periodic and the perpetual inventory systems require regular physical inventory counts. In the periodic inventory system, the physical count occurs at the end of the accounting period. It is necessary for the calculation of cost of goods sold and the matching of physical count to inventory balance. The perpetual inventory system requires a physical count to identify inaccuracies in the perpetual records.
Employee theft and shoplifting can result in inventory inaccuracies.
質問 # 46
the percentage of total maintenance cost that is used to restore equipment to a functional state after a failure or when failure is imminent
- A. TOTAL MAINTENANCE TRAINING COST
- B. INTERNAL MAINTENANCE EMPLOYEES
- C. Condition Based Maintenance Cost
- D. Corrective Maintenance Cost
正解:D
質問 # 47
A large manufacturing company installed some asset monitoring device large motors that were deemed critical equipment. The monitoring devices engineering with vibration data, acoustic data, as well as operational performance data. What asset management strategy has the company selected for the
- A. PM (Preventive Maintenance/OBM Operator Based Maintenance)
- B. OBM (Operational Based Maintenance/CM (Corrective Maintenance)
- C. CBM (Condition Based Maintenance/CM (Corrective Maintenance)
- D. CBM (Conditioned Based Maintenance)/PDM (Predictive Maintenance)
正解:D
質問 # 48
defined as the cost that would be incurred, in today's dollars, to replace the facility and equipment in its current configuration.
- A. Equipment Availability Formula
- B. Mean Time Between Failures (MTBF)
- C. Replacement Asset Value (RAV)
- D. Maintenance Training Hours
正解:C
質問 # 49
Total Available Time - (Idle Time + Downtime)
- A. Equipment Availability Formula
- B. Ratio of Replacement Asset Value (RAV) to Craft-Wage Headcount Formula
- C. Uptime Formula
- D. Maintenance Unit Cost Formula
正解:C
質問 # 50
Which technique would a manager use to determine the possible effects of an alteration in cash flows on a project's net present value?
- A. Sensitivity analysis
- B. Scenario analysis
- C. ROI analysis
- D. Risk analysis
正解:A
解説:
A manager would use sensitivity analysis to determine the possible effects of an alteration in cash flows on a project's net present value. Sensitivity analysis determines the effects of changes in a dependent variable on an independent variable. ROI analysis determines the likely return on an investment or a series of investments. Risk analysis focuses on the possibilities of success or failure for various options.
Scenario analysis focuses on the possible values for a portfolio after a certain amount of time.
質問 # 51
Which method of costing inventory most closely approximates the current cost of inventory as listed on the balance sheet?
- A. Last-in, first-out
- B. Weighted-average
- C. Specific identification
- D. First-in, first-out
正解:D
解説:
The first-in, first-out (FIFO) method of costing inventory most closely approximates the current cost of inventory as listed on the balance sheet. This is because the FIFO inventory cost flow method inventory includes all of the units purchased most recently and, therefore, those whose cost will be most closely aligned with the costs expressed on the balance sheet. Conversely, there is no guarantee that the specific identification would include the most recent items, and the weighted-average method would take into account both current and older costs. The last-in, first-out method would represent the oldest inventory costs.
質問 # 52
A set of interrelated or interacting elements. In the context of
dependability, a system will have the following: a defined purpose expressed in terms of required functions, stated conditions of operation and defined boundaries. → Systems Covered by Criticality Analysis formula
- A. True
- B. False
正解:B
質問 # 53
Aa = MTBM / (MTBM + MDTM) Where MTBM = Mean Time Between Maintenance And MDTM = Mean Downtime for Maintenance
- A. Achieved Availability Formula
- B. Inherent Availability Formula
- C. Corrective Maintenance Hours
- D. Achieved Availability
正解:A
質問 # 54
Total Maintenance Cost per RAV (%) = [Total Maintenance Cost ($) ×
100] ÷ Replacement Asset Value ($) → Total Maintenance Cost As a Percent of Replacement Asset Value (RAV)
- A. True
- B. False
正解:B
質問 # 55
What is a good indicator of individual job performance?
- A. Annual number of customer complaints
- B. Performance compared to individual goals
- C. Attendance and safety performance
- D. Experience and length of company service
正解:B
質問 # 56
......