質問 # 37
Which three are valid password complexity criteria while setting up password policies? (Choose three.)

  • A. Very Complex: At least 6 characters, 1 uppercase, 1 number, and 1 special character
  • B. Very Complex: At least 8 characters, 1 uppercase, 1 number, and 2 special characters
  • C. Complex: At least 8 characters, 1 uppercase, and 1 number
  • D. Simple: At least 8 characters and 1 number
  • E. Very Complex: At least 8 characters, 1 uppercase, 1 number, and 1 special character

正解:B、C、E


質問 # 38
Using Oracle Time and Labor, your client wants to put in a validation process that allows only a certain number of maximum hours an employee can charge in a day, and a minimum of hours he or she can report in a week.
What feature would you use to meet this requirement? (Choose the best answer.)

  • A. project time validation rules
  • B. time audit rules
  • C. time entry rules
  • D. time calculation rules

正解:C


質問 # 39
Which two statements are true about the borrowed and lent cross charge method? (Choose two.)

  • A. Internal Invoice is not generated with this method.
  • B. This method creates accounting entries that move an amount equal to the transfer price between the provider and receiver organizations
  • C. This method allows you to process cross charge transactions across legal entities.
  • D. You must set up a contract business unit to use this method.

正解:A、D


質問 # 40
Your customer wants to automatically allocate unassigned asset lines and common costs across multiple assets based on the construction-in-process cost of each asset. Identify the asset allocation method that you must use as the default method while configuring project types to meet this requirement. (Choose the best answer.)

  • A. Standard Unit Cost
  • B. Actual Unit
  • C. Estimated Cost
  • D. Current Cost
  • E. Spread Evenly

正解:D

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-foundation-configuration-manage-project-types.html#OAPFM220111 Topic - Asset Cost Allocation Methods: Explained The asset cost allocation method determines how indirect or common costs incurred on a project are allocated to multiple assets.
You can specify an asset cost allocation method to enable Oracle Fusion Project Costing to automatically allocate unassigned asset lines and common costs across multiple assets. Unassigned asset lines typically occur when more than one asset is assigned to an asset grouping level.
Projects and project templates inherit a default asset cost allocation method from the associated project type. You can override the default at the project level. If you use capital events to allocate costs, then you can also override the asset cost allocation method at the event level.
The following table describes the available asset cost allocation methods.
Method
Basis of Cost Allocation
Actual Units
Number of units defined for each asset
Current Cost
Construction-in-process (CIP) cost of each asset
Estimated Cost
Estimated cost of each asset
Standard Unit Cost
Combination of the standard unit cost and the number of units defined for each asset Spread Evenly Equal allocation of cost to each asset


質問 # 41
You are set up as a Follower in Manage Tasks. Which two abilities can you accomplish? (Choose two.)

  • A. Receive email notifications about changes that team members make to a task.
  • B. Enter progress for tasks.
  • C. View task details and the task activity stream.
  • D. Edit task details.

正解:A、C

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapem/execute-project-tasks-and-deliverables.html#OAPEM1122082 Followers are persons who aren't working on the task but have an interest in reviewing the task progress. Only the resources and other followers can add followers to a task. If a resource assigns the task to another team member, the application automatically changes the original resource to a follower.
What's the difference between my tasks and tasks that I follow?
You can edit task details and enter progress for your tasks on the Manage Tasks page. If a task has multiple resources, only the primary resource can edit the task.
When you follow a task, you can view the task details and see the task activity stream. You receive e-mail notifications of changes that team members make to the task.
If a resource reassigns the task to another team member, then the previous resource automatically becomes a follower.


質問 # 42
Identify three purposes for which the project resource search index is used. (Choose three.)

  • A. Display resource details
  • B. Calculate Resources Availability Scores
  • C. Filter counts while you search for resources
  • D. Calculate Resource Qualification Scores
  • E. Provide absence details for resources

正解:A、D、E


質問 # 43
You cannot generate invoices for a project expenditure item. After running the Generate Invoices program for a billable expenditure item and active contract, the process completes successfully but without any billing, and does not provide any error logs.
The program's processing summary is as follows:
Billing Event Errors 0
Ineligible Contracts 0
Successfully Billing Events Created 0
Ineligible Contract Lines 0
Billing Transaction Exception Errors 0
Ineligible Bill Plans 0
Billing Transaction Exception Warnings 0
Ineligible Associated Projects 0
Successful Billing Transactions 0
Ineligible Expenditure Items 0
Draft Invoice Exception Errors 0
Ineligible Events 0
Draft Invoice Exception Warnings 0
Successful Draft Invoices 0
What was the invoice method classification set to that caused this behavior? (Choose the best answer.)

  • A. Amount Based
  • B. Rate Based
  • C. As Incurred
  • D. Percent Complete

正解:A

解説:
Reference https://docs.oracle.com/cd/E51367_01/projectop_gs/OAPJB/F1087458AN139C2.htm Topic - Invoice and Revenue Rates: How They Are Determined Oracle Fusion Project Billing uses bill rates, burdening, and transfer price schedules to derive standard bill rates, multipliers, markups, and bases for calculating potential revenue when the revenue method classification on a revenue plan is as billed, as incurred, or rate based. Similarly, bill rates derive invoice amounts when the invoice method classification on a bill plan is rate based.


質問 # 44
Which three tools are available for accessing REST APIs?

  • A. Web Browser
  • B. cURL
  • C. Programming Language
  • D. Oracle Transactional Business Intelligence

正解:A、B、C

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/18b/fapap/Use_cURL.html REST API = REpresentational State Transfer (REST) Application Programing Interface (API)


質問 # 45
Which component provides a human workflow service that handles all interactions with users or groups in business processes?

  • A. Security Console
  • B. BPM Worklist
  • C. SOA Suite
  • D. Subledger Accounting

正解:C


質問 # 46
Identify three correct statements about project types. (Choose three.)

  • A. Project type can be used as a source in subledger accounting.
  • B. Project type can be enabled for both billing and capitalization.
  • C. Summarization options can be specified at project type.
  • D. Project type can be associated with multiple project units.
  • E. Classifications can be assigned at project type.

正解:A、B、E


質問 # 47
A project administrator is trying to assign a team member for a project but cannot find the person in the team member list on the Project Definition page. What is the reason for this problem? (Choose the best answer.)

  • A. The employee is not assigned with a supervisor.
  • B. Project roles are not assigned in the project.
  • C. The employee is not assigned to the project-owning organization.
  • D. The employee is not assigned to a department.

正解:D

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-foundation-configuration-define-project-resource-breakdown-structures.html#OAPFM180158_2 Why can't I find persons in the list of resources when I enter team members, planning resources, or person rate schedules?
You can't find persons in the list of resources when you enter team members, planning resources, or person rate schedules in the following situations:
The administrator didn't assign a department while creating users. Persons must have an active assignment and be assigned to a department in Oracle Fusion Human Capital Management before they can be added as team members or entered as resources on the planning resource breakdown structure or person rate schedule.
The resource isn't active in Oracle Fusion Human Capital Management because the current date is before the effective date of the resource. If you want to include persons who will start in the future, select the Include people with future-dated effective start dates option when you search for the person.
Persons assigned as project managers aren't active as of the project start date.
The assignment of the person is terminated, and an appropriate value isn't set for the number of days to display people with terminated assignments. You can set the profile value appropriately at the site profile level using the Specify Number of Days to Display People with Terminated Assignments task in the Setup and Maintenance work area.


質問 # 48
Your customer wants additional project information for detailed account balance maintenance, reconciliation, and reporting. Identify the configuration in subledger accounting that can be set up to fulfill this requirement. (Choose the best answer.)

  • A. Journal Rules
  • B. Accounting Method
  • C. Accounting Rule
  • D. Supporting References
  • E. Mapping Sets

正解:D

解説:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPFM/OAPFM1125357.htm#OAPFM1125357 Assignment of Supporting References Supporting references may be used to capture transaction values on journal entry lines. A supporting reference can be used on a journal entry rule set only if it's assigned a source from the event class of the journal entry rule set.
Creating Supporting References: Explained
Supporting references are used to store additional source information about a subledger journal entry at the line level.
Supporting references with balances establish subledger balances for a particular source and account for a particular combination of supporting references plus the account combination.
For example:
If a journal line contains a supporting reference that includes two sources, Customer Type and Customer Name.
Balances are created for the account combination, plus customer name and customer type.
Examples of how you may want to use supporting reference balances are to:
Facilitate reconciliation back to the subledgers and source systems by tagging journal entries with transaction and reference attributes.
Create balances by dimensions not captured in the chart of accounts.
Reporting using dimensions not captured in the chart of accounts.
Enrich Oracle Fusion Business Intelligence Applications reporting on subledger journals.
Profit and loss balances by dimensions not captured in the chart of accounts Define supporting references to hold additional supporting information for detailed account balance maintenance or reconciliation and reporting requirements.


質問 # 49
Your organization has been using project class categories and codes for reporting purposes and is set up at the project level. You recently defined a new project type, Capital-Contract, and created new class categories named Build, Operate, and Transfer (BOT) and Build, Transfer, and Maintain (BTM), with class codes of Yes/No. But on creation of a project, you are unable to associate these class categories and codes.
Identify two setups that are mandatory for these class categories and codes to be displayed. (Choose two.)

  • A. Class categories should be assigned to business unit.
  • B. Class codes should be associated with a related set code.
  • C. Class codes should be assigned to project unit.
  • D. Class categories should be assigned to project type.

正解:B、D

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-foundation-configuration-manage-project-types.html#OAPFM360164 Topic - Associating Project Types and Class Categories: Examples Project classifications group your projects according to categories and codes that you define. When you associate project classifications with project types, the classification is available for selection on projects with that project type.
Use any of the following methods to associate class categories with project types:
Add a classification to the project type definition
For each classification that you associate with the project type, you can enable the Assign to All Projects option to automatically add the classification to the project definition for all new projects with the project type. When this option is enabled, all projects with this project type must be assigned a class code for the class category.
Add a project type to the class category definition
Enable the Assign to all Project Types option on the class category definition


質問 # 50
Which two are the workflows in Project Financial Management? (Choose two.)

  • A. Asset Line Generation
  • B. Project Status Change
  • C. Capital Interest Calculation
  • D. Burden Cost Recalculation
  • E. Expenditure Item Adjustment

正解:B、C


質問 # 51
Which three are project gate statuses? (Choose three.)

  • A. Open
  • B. Approve
  • C. Draft
  • D. In Review
  • E. Closed

正解:A、B、E


質問 # 52
Your customer wants a team member who is assigned to a project to be able to create and submit a forecast, but not to be able to approve the forecast. What is the default project role that you should assign to the person in the project to meet this requirement? (Choose the best answer.)

  • A. Project Administrator
  • B. Project Accountant
  • C. Project Manager
  • D. Project Application Administrator

正解:A

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjm/project-administrator-job-role.html#Project_Administrator_privileges Project Manager has duty role 'Project Forecast Approval Duty' assigned but Project Administrator has duty role 'Project Forecast Inquiry Duty' - no approval authority Both roles have duty role 'Project Forecast Management Duty' which enables them to Allow creation, submission, update, and deletion of working versions of project forecasts. (Cloud _Roles_Duties.xlsx)


質問 # 53
Shift is one of the key elements in defining project and resource calendars.
Which two additional key elements are required to define the project and resource calendars? (Choose two.)

  • A. Expenditure Type
  • B. Accounting Calendar
  • C. Workday Patterns
  • D. Schedule Exceptions
  • E. Time off

正解:A、D


質問 # 54
You have defined two expenditure types, but they are not available for selection when you enter an expenditure batch. Identify the reason for this problem. (Choose the best answer.)

  • A. The two expenditure types are not assigned to the reference data set that is assigned to the project-owning organization in which the transaction is performed.
  • B. The two expenditure types are not assigned to the reference data set that is assigned to the project unit in which the transaction is performed.
  • C. The two expenditure types are not assigned to the reference data set that is assigned to the project expenditure organization in which the transaction is performed.
  • D. The two expenditure types are not assigned to the reference data set that is assigned to the business unit in which the transaction is performed.

正解:B

解説:
Ref: Implementing-Project-Financial-Management-and-Grants-Management.pdf (19A Part # F11256-01) Chapter 3 - Define Project Organizations Topic - Set Assignments and Project Data - How They Work Together (Page 29) Business Unit as Set Determinant Business units enable you to control and report on financial transactions, usually for specific geographical entities within the enterprise. For project management purposes, assign the Project Accounting business function to the business unit.
Business unit is a set determinant for the project-related reference data objects described in the following table.
Ref Data Object
Entities
Project Accounting Definition
Project Types
Project Rates
Project rate schedules
Project Unit as Set Determinant
Use project units to enforce consistent project management practices across your enterprise. Project unit is a set determinant for the reference data objects described in the following table.
Ref Data Object
Entities
Project Definition
Class codes, financial plan types, project plan types and project roles Project Transaction Types Expenditure types and work types You can only select class codes, plan types, roles, expenditure types and work types that are assigned to the same set as the project unit. To enable expenditure types and work types for use on projects owned by a project unit, assign the set associated with the Project Transaction Types reference data object to those entities


質問 # 55
Your client uses Resource Breakdown Structures (RBS) and Resource Mapping to associate amounts to resources. After making some changes to the resources at project level, forecasts are regenerated. After reviewing the cost amounts associated with the resources, you suspect that the cost association does not match your client's expectations. Identify two valid rules based on which cost association works. (Choose two.)

  • A. If one branch contains a user-defined resource type, precedence is given to the branch that contains a user-defined resource type.
  • B. If there is only one level in RBS to which the transaction maps, the cost amounts are mapped to that level.
  • C. If a transaction maps to more than one level, Oracle PPM Cloud sums the precedence numbers for all resource type in the branch and gives precedence to the resource element in the branch with the highest sum.
  • D. If the sum of precedence numbers is the same for more than one branch, precedence is given to the branch with the lowest number at the lowest level.

正解:B、D

解説:
Reference https://docs.oracle.com/cd/E37583_01/doc.1116/e22598/F458900AN13D82.htm How Resource Mapping Is Calculated You can track the cost impact of every resource that has been assigned to a project task and use the resource breakdown structure to view the breakdown of these costs. Oracle Fusion Projects associates the costs of the resources used for tasks with branches and levels in the resource breakdown structure. The process for determining the correct association is managed by rules of precedence.
Oracle Fusion Projects uses the following rules to associate cost amounts with resources:
Select the lowest level in the resource breakdown structure to which a transaction can map.
If there is only one level to which the transaction maps, the cost amounts are mapped to that level.
If the transaction maps to more than one level, Oracle Fusion Projects sums the precedence numbers for all resource types in the branch and gives precedence to the resource element in the branch with the lowest sum.
If more than one branch has the lowest precedence number at the lower level, the application uses the precedence number of the next level up.
If the sum of precedence numbers is the same for more than one branch, precedence is given to the branch with the lowest number at the lowest level.
If one branch contains a user-defined resource type, precedence is given to the branch that does not contain a user-defined resource type.
Note Oracle Fusion Projects gives more precedence to a lower precedence number. For example, a resource element with a precedence number of 1 is given precedence over a resource element with a precedence number of 10.


質問 # 56
Select two correct statements about project classifications on a template. (Choose two.)

  • A. When a project is created from a template, the required project classifications must be entered.
  • B. Project class category in a project classification must be associated with a Set Code.
  • C. Set Code is not required for a project class category in a project classification.
  • D. Project Classification is a mandatory field on a project template.

正解:A、C


質問 # 57
You are implementing Project Portfolio Management for a global professional services organization. In their Consulting Services line of business, it is common to use resources from different business units based on the skills required. Therefore, cross-charge transactions happen between business units within the same legal entity. Transfer price calculations need to be based on raw costs, with no further adjustments to transfer price.
Identify two setups that can drive this borrowed and lent agreement. (Choose two.)

  • A. Transfer price basis must be Burdened Cost, and calculation method must be Burden Rate Schedule.
  • B. A document entry such as straight time must be enabled for cross-charge transactions.
  • C. Transfer price basis must be Raw Cost and calculation method must be Rate Schedule.
  • D. Transfer price basis must be Raw Cost and calculation method must be Basis Only.

正解:B、D

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-billing-configuration-define-transfer-pricing.html#OAPFM3094619


質問 # 58
As you go through the first-quarter close for your customer, you notice that the burden amounts calculated do not seem to be right. Based on the calculations, you notice that the amounts calculated are not considering the burden schedule override at a task level, which was done during the second month of the quarter. Identify the reason for this problem. (Choose the best answer.)

  • A. Only new expenditure items charged to the task use the new burden schedule; expenditure items processed earlier cannot be reprocessed.
  • B. You can enable automatic reprocessing of expenditure items processed before the burden schedule change.
  • C. All expenditure items charged to the task use the new burden schedule.
  • D. Only new expenditure items charged to the task use the new burden schedule; expenditure items processed earlier can be manually marked for reprocessing.

正解:D

解説:
Reference https://docs.oracle.com/cloud/r13_update17b/projectcs_gs/OAPJC/OAPJC1071490.htm#OAPJC1071482


質問 # 59
Which five steps are required for the File-Based Data Import Integration option?

  • A. Download an Excel template.
  • B. Install an Excel add-in.
  • C. Run Process to transfer data to interface tables.
  • D. Import data into various applications.
  • E. Upload the file to the server.
  • F. Populate the spreadsheet with data and generate a CSV file.

正解:A、B、C、E、F

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oefpp/overview.html#External_Data_Integration_Services_for_Oracle_Cloud_Overview


質問 # 60
Your customer has a requirement to allow adjustment and reversals for transactions imported from an external expense entry system.
Which section on the Manage Project Transaction Sources page will allow you to enable these options?

  • A. Transaction Entries
  • B. Documents
  • C. Transaction Source
  • D. Document Entries

正解:C


質問 # 61
You have closed the project accounting period with a warning, but you are unable to close the accounting period due to an error.
Identify two reasons for this problem. (Choose two.)

  • A. The corresponding Oracle Payables Cloud accounting period has not been closed.
  • B. Pending burden summarization items have not been processed.
  • C. Unaccounted transactions are not imported.
  • D. Transactions entered in an integrated Oracle Cloud Application are accounted, but not yet transferred and imported into Oracle Project Portfolio Management Cloud.
  • E. Unaccounted transactions have not been swept to the next period.

正解:D、E

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapjb/record-accounting-for-project-billing.html#OAPJB340382 Topic - Accounting Period and Project Accounting Period Closing: How Validation Works


質問 # 62
......

Oracle 1z0-1057-22リアルな2023年最新の知能問題集模擬試験問題集:https://jp.fast2test.com/1z0-1057-22-premium-file.html

Oracle 1z0-1057-22リアルな問題と100%カバーリアルな試験問題:https://drive.google.com/open?id=1LWtjl3Evxtr5m3J3MLQ5jr0vDeun6ufX


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어