質問 33
Your customer wants to perform billing based on the Percent Spent invoice method. Identify two setups that are required in project contracts for calculating invoice amounts as per their requirement. (Choose two.)

  • A. expenditure items
  • B. invoice method
  • C. billing events
  • D. billing controls
  • E. bill plan

正解: D,E

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjb/create-customer-contract.html#OAPJB70183 Bill Plan - Create a bill plan within a contract that uses the invoice method you require. Assign the bill plan to one or more contract lines. A set of instructions on a contract that define how to invoice a customer. Multiple contract lines on a contract can use the same or different bill plans. Invoice Method is used in creating Bill Plan - not a separate setup.
Billing Controls - Contract feature that controls the types of transactions, dates, and amounts a customer may be invoiced for and revenue can be recognized for a contract or contract line. Define billing controls at the contract or contract line level.
Topic - Creating a Contract for Percent Spent Invoice and Revenue Methods: Worked Example This example describes a scenario where transactions for a contract line need to be invoiced and the revenue recognized using the percent spent method.
What are the revenue and invoice method classifications? Percent Spent What is the billing extension calculation level for the contract line and project association? Project level Summary of the Tasks Create a contract, create the percent spent contract lines, create the bill plan, create the revenue plan.
Prerequisites
Create a project.
Create the project plan for percent spent revenue. Specify the plan type on the percent spent billing extension.
Create an approved cost budget.
Create cost and burden rates.
Enter labor and expense transactions for the project.
Collect costs for the transactions.
Configuration Steps
Creating the Contract
Creating the Percent Spent Contract Lines
Creating the Bill Plan - A set of instructions on a contract that define how to invoice a customer. Multiple contract lines on a contract can use the same or different bill plans.
Creating the Revenue Plan - Common set of instructions for recognizing revenue within a contract. Multiple contract lines on a contract can use the same or different revenue plans.
Invoice method classifications determine how transactions are invoiced. The invoice method determines how invoice amounts are derived.
Enter an invoice method on a bill plan, which you create for a contract and assign to contract lines to provide a set of instructions for creating an invoice.
Create billing controls for a contract or contract line to define the valid transaction dates, billing resources, and amount limits for transactions associated with the contract.
Generate invoices to calculate the invoice amounts for a contract.
The following figure illustrates the components of a project and a contract that determine invoice amounts, and the relationships between the components.

 

質問 34
You are implementing Project Portfolio Management (PPM) for a professional services firm. The firm rents multiple buildings for its operations. At the end of each month, they review the rent expense for the month and want to allocate the rental cost to all the projects and tasks that are executed by associates in each of the buildings. The source amounts must be proportionally allocated to the tasks based on the raw costs of the tasks from the previous month. Considering that all these costs are in General Ledger, what three allocation setups should you complete in PPM? (Choose three.)

  • A. Define allocation basis by using Actual Amounts with a period-to-date amount class.
  • B. Define allocation basis by using Actual Amounts with a project-to-date amount class.
  • C. Allocate rental costs once each accounting period by using the "spread evenly" allocation method.
  • D. Allocate rental costs once each accounting period by using the "full" allocation method.
  • E. Allocate to all eligible tasks and prorate the allocation by the total actual raw cost accrued for each task during the previous accounting period.

正解: A,D,E

 

質問 35
Which data format is supported by SOAP Web services to establish communication between web services consumers and web services providers?

  • A. JSON
  • B. XLSX
  • C. XML
  • D. CSV

正解: D

 

質問 36
Stigma consulting has been hired by a client to implement Project Management Cloud. Which role should they assign to a user for using the rapid implementation feature to set up the Project Financial Management offering by populating and uploading a Microsoft Excel workbook?

  • A. Project Integration Specialist
  • B. Project Application Administrator
  • C. Project Executive
  • D. Project Administrator

正解: D

 

質問 37
As part of maintaining (importing new employees that were added last week) project enterprise labor resources in your organization, you submit the Maintain Project Enterprise Labor Resources process to create and update resources based on changes In HCM. You define maintenance conditions on the Manage Project Enterprise Labor Resource page to process both employees and contingent workers.
Which three are parameters that are based on which the system identifies the new resources?

  • A. Organization
  • B. Jobs
  • C. Business Unit
  • D. Department
  • E. Project Unit

正解: A,B,C

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/fapfm/implementing-project-execution-management-applications.html#FAPFM1718570 Topic - Manage Maintenance Conditions for Project Enterprise Labor Resource

 

質問 38
Your administrator creates maintenance conditions on the Maintain Project Enterprise Labor Resources page. An HCM person is included in a condition with a process order value of 1 and, additionally, there are three other conditions, all with a process order value of 10. Identify two correct statements about the Maintain Project Enterprise Labor Resources process as it relates to process order values. (Choose two.)

  • A. For the three conditions that have the same process order value of 10, the records are processed in ascending alphabetic order based on the condition name.
  • B. The process creates a resource by using the condition with a process order value of 1 but does not create more than one resource for the same person even if subsequent conditions apply to the person.
  • C. The process creates a resource by using the conditions with a process order value of 10 but does not create more than one resource for the same person even if subsequent conditions apply to the person.
  • D. For the three conditions that have the same process order value of 10, the records are processed in ascending numeric order based on the condition name.

正解: A,B

解説:
Reference:
Topic - FAQs for Define Project Enterprise Labor Resources
What's the processing order of project enterprise labor resource maintenance conditions?
Records are processed by the Maintain Project Enterprise Labor Resources process in ascending order based on the process order value that you specify on the Create Condition page. For example, assume that an HCM person is included in a condition with a process order value of 1. If a resource doesn't already exist for that person, then the process creates a resource for the condition with the process order value of 1. The process doesn't create more than one resource for the same person even if subsequent conditions apply to the person.
If multiple conditions have the same process order value, then records are processed in ascending alphabetic order based on the condition name.

 

質問 39
Which three are true of what you can do in the Project Requirements work area?

  • A. Create an execution project.
  • B. Create project tasks for backlog items.
  • C. Organize backlog items by requirements.
  • D. Create an implementation project.
  • E. Manage your list of backlog items.

正解: B,C,E

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapem/manage-project-requirements.html#OAPEM874365 Project Requirements: Explained Requirements enable you to capture your business needs. If you manage projects using the Agile development methodology, you start by identifying the high-level requirements and decomposing them further to manage the completion of work on the requirement.
You use the Project Requirements work area to:
Organize backlog items by requirements
Manage your list of backlog items
Create project tasks for backlog items

 

質問 40
You create a project schedule with a Shifts element. Identify two more elements that can be part of a project schedule. (Choose two.)

  • A. Expenditure Type
  • B. Time Off
  • C. Workday Patterns
  • D. Exceptions
  • E. Accounting Calendar

正解: C,D

解説:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/FAPFM/FAPFM1192914.htm Topic - Creating Calendars for Projects and Resources: Procedure Project Schedules are used as a base for project and resource calendars in Project Execution Management applications. The smallest scheduling unit is a day. For example, you can define the number of hours in a day but, you can't schedule work for a specific time of the day.
The following are the elements of a schedule:
Shifts
Workday patterns
Exceptions

 

質問 41
Your organization performs revenue recognition based on the Labor and Non-labor Burden schedule types. Identify the setup required to enable this kind of revenue recognition. (Choose the best answer.)

  • A. Create a revenue method classification with a revenue method of Percent Complete.
  • B. Create a revenue method with a revenue method classification of Amount Based.
  • C. Create a revenue method classification with a revenue method of Percent Spent.
  • D. Create a revenue method with a revenue method classification of Rate Based.

正解: D

 

質問 42
Which three tools are available for accessing REST APIs?

  • A. Oracle Transactional Business Intelligence
  • B. Programming Language
  • C. Web Browser
  • D. cURL

正解: B,C,D

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/18b/fapap/Use_cURL.html REST API = REpresentational State Transfer (REST) Application Programing Interface (API)

 

質問 43
Which two statements are true about a project in "Draft" status? (Choose two.)

  • A. Team members cannot see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
  • B. Project managers can view draft projects on the Project Manager Dashboard and use the projects for requirements planning.
  • C. Project managers can neither view draft projects on the Project Manager Dashboard nor use the projects for requirements planning.
  • D. Team members can see the tasks from draft projects on the Team Member Dashboard or in the My Work area.

正解: A,B

解説:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPEM/OAPEM1122096.htm The following table lists the project statuses and what you can do with projects in that status.
Project Status
What you can do?
Draft
Project managers can view draft projects in the Project Manager Dashboard and use the projects for requirements planning.
Team members can't see the tasks from draft projects on the Team Member Dashboard or in the My Work area.
Active
Project managers can view active projects in the Project Manager Dashboard and use the projects for requirements planning, project execution, and reporting.
Team members can view task assignments on active projects on the Team Member Dashboard and My Work area.
Pending Close
Project managers can view pending projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
Team members can view task assignments on pending projects on the Team Member Dashboard and My Work area.
Submitted
Project managers can view submitted projects in the Project Manager Dashboard and use the projects for project tracking, and reporting.
Team members can view task assignments on submitted projects on the Team Member Dashboard and My Work area Closed Project managers can't view closed projects in the Project Manager Dashboard or use the projects for requirements planning, project execution, and reporting.
Team members can't view tasks of closed projects on the Team Member Dashboard or in the My Work area.

 

質問 44
Which component of performance measures allows you to select the method that is used to measure accounts such as budget, forecast, and actual?

  • A. Scenario Member
  • B. Time Member
  • C. Category Member
  • D. Accounts Member

正解: D

 

質問 45
Your customer wants a team member who is assigned to a project to be able to create and submit a forecast, but not to be able to approve the forecast. What is the default project role that you should assign to the person in the project to meet this requirement? (Choose the best answer.)

  • A. Project Application Administrator
  • B. Project Administrator
  • C. Project Manager
  • D. Project Accountant

正解: B

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjm/project-administrator-job-role.html#Project_Administrator_privileges Project Manager has duty role 'Project Forecast Approval Duty' assigned but Project Administrator has duty role 'Project Forecast Inquiry Duty' - no approval authority Both roles have duty role 'Project Forecast Management Duty' which enables them to Allow creation, submission, update, and deletion of working versions of project forecasts. (Cloud _Roles_Duties.xlsx)

 

質問 46
Your customer has implemented Oracle Project Portfolio Management Cloud recently and they have hired new employees for their Professions Services business. These employees are set up in Oracle Human Capital Management Cloud, but the Project Administrators are unable to add them as resources in the Planning Resource Breakdown Structure.
What are three conditions for new employees to show up in the list? (Choose three.)

  • A. All new employees created as persons must have an active assignment.
  • B. All new employees created as persons must be assigned to a department.
  • C. Current date is before the effective date of the resource, and you did not enable the "Include people with future-dated effective start dates" option during the search.
  • D. All new employees created as persons must have an active supervisor.
  • E. All new employees created as persons must have an active project role.

正解: A,B,C

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-foundation-configuration-define-project-resource-breakdown-structures.html#OAPFM180158_2 Why can't I find persons in the list of resources when I enter team members, planning resources, or person rate schedules?
You can't find persons in the list of resources when you enter team members, planning resources, or person rate schedules in the following situations:
The administrator didn't assign a department while creating users. Persons must have an active assignment and be assigned to a department in Oracle Fusion Human Capital Management before they can be added as team members or entered as resources on the planning resource breakdown structure or person rate schedule.
The resource isn't active in Oracle Fusion Human Capital Management because the current date is before the effective date of the resource. If you want to include persons who will start in the future, select the Include people with future-dated effective start dates option when you search for the person.
Persons assigned as project managers aren't active as of the project start date.
The assignment of the person is terminated, and an appropriate value isn't set for the number of days to display people with terminated assignments. You can set the profile value appropriately at the site profile level using the Specify Number of Days to Display People with Terminated Assignments task in the Setup and Maintenance work area.

 

質問 47
You configure one OTBI using Project Cross Subject Area Analysis Real Time. You notice that all measures (Budget, Forecast, Cost, Commitments, Revenue, and Invoice) are not available for Bill-To-Customer and Contract and Contract Line dimensions. Identify the reason for this behavior. (Choose the best answer.)

  • A. The Contract and Contract Line dimensions apply only to Invoice measures.
  • B. The Bill-To-Customer dimension applies only to Invoice measures, but the Contract and Contract Line dimensions do not apply to Revenue and Invoice measures.
  • C. The Bill-To-Customer dimension does not apply to Invoice measures, but the Contract and Contract Line dimensions apply only to Revenue and Invoice measures.
  • D. The Bill-To-Customer dimension applies to Invoice measures, and the Contract and Contract Line dimensions apply to Revenue and Invoice measures.
  • E. The Bill-To-Customer dimension applies only to Revenue and Invoice measures.

正解: D

解説:
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/faopm/subjectareas.html#Projects__Cross_Subject_Area_Analysis__Real_Time_SA_20 Analyze real-time information on project performance, including budgets, forecasts, costs, commitments, revenue, and invoices.
This subject area analysis allows cross subject area analysis between Funding, Invoices, Revenue, Budget, forecasts, Costs areas.

 

質問 48
Your organization has a requirement to send notifications to the owners of the associated tasks when the status of a deliverable is set to Complete. You have been asked to evaluate generate public events for project deliverable status changes feature to manage this requirement.
Which two statements are true about this feature? (Choose two.)

  • A. The public event is not generated when a deliverable is created or deleted.
  • B. The public event is generated when a deliverable is created or deleted.
  • C. The public event is not generated when the priority of a deliverable changes.
  • D. The public event is generated when the progress status for a deliverable changes.

正解: C,D

 

質問 49
Your organization has been using project class categories and codes for reporting purposes and is set up at the project level. You recently defined a new project type, Capital-Contract, and created new class categories named Build, Operate, and Transfer (BOT) and Build, Transfer, and Maintain (BTM), with class codes of Yes/No. But on creation of a project, you are unable to associate these class categories and codes.
Identify two setups that are mandatory for these class categories and codes to be displayed. (Choose two.)

  • A. Class codes should be associated with a related set code.
  • B. Class codes should be assigned to project unit.
  • C. Class categories should be assigned to project type.
  • D. Class categories should be assigned to business unit.

正解: A,C

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-foundation-configuration-manage-project-types.html#OAPFM360164 Topic - Associating Project Types and Class Categories: Examples Project classifications group your projects according to categories and codes that you define. When you associate project classifications with project types, the classification is available for selection on projects with that project type.
Use any of the following methods to associate class categories with project types:
Add a classification to the project type definition
For each classification that you associate with the project type, you can enable the Assign to All Projects option to automatically add the classification to the project definition for all new projects with the project type. When this option is enabled, all projects with this project type must be assigned a class code for the class category.
Add a project type to the class category definition
Enable the Assign to all Project Types option on the class category definition

 

質問 50
In your customer site, the capitalized interest calculation is implemented on their project types. Which option represents the costs considered in the interest calculation? (Choose the best answer.)

  • A. expenditure type exclusions on the Capitalized Interest rate schedules
  • B. expenditure type exclusions on the Capitalized Interest rate name
  • C. expenditure items whose cost spreads across multiple assets that are capitalized
  • D. expenditure items whose costs are applied to a single asset or multiple assets
  • E. common costs on the project/task

正解: D

解説:
Reference https://fusionhelp.oracle.com/helpPortal/topic/TopicId_P_988B43C997365159E040D30A68813832
https://docs.oracle.com/cd/E48434_01/fusionapps.1118/e49622/F1125377AN61D92.htm

 

質問 51
You want to export your project plan to Oracle Project Financial Management Cloud after initial scheduling is complete in Microsoft Projects. Identify three conditions that must be met for exporting milestone tasks. (Choose three.)

  • A. only one labor resource assignment with 0 effort
  • B. lowest-level tasks set up with zero duration
  • C. only one labor resource assignment with 100 effort
  • D. lowest-level tasks set up with non-zero duration
  • E. percent work complete values of 0 or 100 percent

正解: A,B,E

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapex/define-project-management-configuration.html#OAPEX1357147 Topic - Microsoft Project Prevalidation: Explained The following table describes Prevalidation rules for tasks and resource assignments.
Level
Rule
Lowest-level tasks
One labor and multiple expense resources are allowed for a lowest-level task. Remove other resources.
Summary tasks
Only one labor resource with zero allocation is allowed for a summary task. Remove all other resources.
Milestone tasks
No subtasks are allowed under milestone tasks. Milestones must be lowest-level tasks.
Milestone tasks
Milestone tasks must have zero duration.
Milestone tasks
Only one labor resource, with zero effort, is allowed for a milestone task. Remove all other resources.
When exporting milestone tasks, ensure that the tasks:
Are lowest-levels task with zero duration, that is, the same start and finish dates.
Have only one labor resource assignment with zero effort.
Have percent work complete values of 0 or 100 percent. Any other values are set to zero before export.

 

質問 52
You are implementing Project Portfolio Management for a global professional services organization. In their Consulting Services line of business, it is common to use resources from different business units based on the skills required. Therefore, cross-charge transactions happen between business units within the same legal entity. Transfer price calculations need to be based on raw costs, with no further adjustments to transfer price.
Identify two setups that can drive this borrowed and lent agreement. (Choose two.)

  • A. Transfer price basis must be Burdened Cost, and calculation method must be Burden Rate Schedule.
  • B. Transfer price basis must be Raw Cost and calculation method must be Rate Schedule.
  • C. Transfer price basis must be Raw Cost and calculation method must be Basis Only.
  • D. A document entry such as straight time must be enabled for cross-charge transactions.

正解: C,D

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-billing-configuration-define-transfer-pricing.html#OAPFM3094619

 

質問 53
You are trying to create a project purchase order (PO) but you are unable to select Expenditure Organization in the PO. Identify two reasons for this problem. (Choose two.)

  • A. The organization is not classified as a project expenditure organization.
  • B. The organization is not included in the organization tree that is assigned to the business unit that owns the PO.
  • C. The organization is not classified as a project-owning organization.
  • D. The organization is classified as a project unit.

正解: A,B

解説:
Ref: Implementing-Project-Financial-Management-and-Grants-Management.pdf Chapter 3 - Define Project Organizations Page # 12 Topic - Selecting Organization Hierarchies for the Business Unit The following conditions are required for an organization to be eligible to be a project expenditure organization:
You must assign the Project Expenditure Organization classification to the organization.
The organization must belong to the hierarchy that you specify in the project implementation options for the business unit.

 

質問 54
Select two correct statements about project classifications on a template. (Choose two.)

  • A. Project class category in a project classification must be associated with a Set Code.
  • B. When a project is created from a template, the required project classifications must be entered.
  • C. Set Code is not required for a project class category in a project classification.
  • D. Project Classification is a mandatory field on a project template.

正解: B,C

 

質問 55
You have been asked to set up one active person, who is not a team member in the project, as a quality manager for each quality task created under projects. However, when you try to assign the quality manager as Task Manager, you cannot find the person's name in the list of values. What is the reason for this problem? (Choose the best answer.)

  • A. The "Require Task Managers to be Project Team Members" profile option is set to No.
  • B. The "Require Task Managers to be Project Team Members" profile option is set to Yes.
  • C. The quality manager belongs to a department that is not associated with the project.
  • D. The quality manager is not assigned with a supervisor.

正解: B

解説:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/fapfm/introducing-oracle-project-portfolio-management-cloud-services.html#FAPFM428138 Topic - Project Foundation Profile Options Profile Option Name - Task Managers Must Be Project Team Members Description - Specify whether task managers must be project team members.
Values - No (Default) / Yes
Setup Task Name - Require Task Managers to be Project Team Members

 

質問 56
You create a contract with two contract lines: Line 1 and Line 2. You create separate bill plans: A for contract Line 1 and B contract for Line 2, with a different bill set number (11 for Bill Plan A and 22 for Bill Plan B).
Then Bill Plan A is allocated against Project X - Task 10, and Bill Plan B is allocated against Project Y - Task 30.
Based on the preceding setup, you are generating invoices. Identify two correct statements about invoice generation in this scenario. (Choose two.)

  • A. Bill set number drives the grouping of transactions.
  • B. Invoice generation does not depend on bill plan. The invoices are created based on the contract line.
  • C. Two invoices are created using the same contract.
  • D. Both the contract lines create only a single invoice because they are using the same contract.

正解: A,C

解説:
Ref: https://docs.oracle.com/cd/E51367_01/projectop_gs/OAPJB/F1087456AN1006D.htm What's a bill set?
Transactions originating from different bill plans with the same bill set number on a contract are included on the same invoice. If a contract has multiple bill plans and each have different values for the bill set, Oracle Fusion Project Billing creates a separate invoice for each bill plan

 

質問 57
......

最新(2023)Oracle 1z0-1057-22試験問題集:https://jp.fast2test.com/1z0-1057-22-premium-file.html

最適な練習法にはOracle 1z0-1057-22試験の素晴らしい1z0-1057-22試験問題PDF:https://drive.google.com/open?id=1LWtjl3Evxtr5m3J3MLQ5jr0vDeun6ufX


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어