質問 71
You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question.
- A. Backwards
- B. Forward with reverse
- C. Infinite sequencing
- D. Squeezing in
正解: A,B
質問 72
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?
- A. Use a planning group.
- B. Use a propagation range.
- C. Use a heuristic.
- D. Use a resource group.
正解: C
質問 73
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.
- A. MRP area data
- B. Storage location data
- C. Production version data
- D. Warehouse number data
正解: B,D
質問 74
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements without checking the capacity of a work center.
- D. MRP creates capacity requirements only if the work center has sufficient capacity.
正解: C
質問 75
Which material master setting is required to use the repetitive planning table for production with production orders?
- A. A repetitive manufacturing profile must be assigned on the MRP4 view
- B. An overall profile be assigned on the Work Scheduling view
- C. The Selection Method must be set to "2 Selection by production version".
- D. At least one valid production version must exist on the MRP4 view
正解: A
質問 76
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. Plant Data
- B. MRP Group
- C. MRP Profile
- D. MRP Controller
正解: B
質問 77
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Kanban
- B. Picking list
- C. Backflushing
- D. Transfer Order
正解: B
質問 78
Where do you maintain the duration of a producton operation?
- A. Material master
- B. Bill of material (BOM)
- C. Routing
- D. Work instructions
正解: C
質問 79
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question
- A. Planning file entries
- B. WIP list
- C. Production list
- D. Operation list
- E. Production overview
正解: B,D,E
質問 80
What are pillars of SAP Activate?
There are 2 correct answers to this question.
- A. SAP MaxAttention
- B. SAP Best Practices
- C. Premium engagement
- D. Guided Configuration
正解: B,D
質問 81
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.
- A. Material Master -> Plant Settings -> MRP Group
- B. Plant Settings -> MRP Group -> Material Master
- C. MRP Group -> Material Master -> Plant Settings
- D. Material Master -> MRP Group -> Plant Settings
正解: D
質問 82
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Manual planning without check
- B. Consumption-based planning
- C. Forecast planning
- D. Material requirements planning
正解: B
質問 83
How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.
- A. Using purchase orders for external procurement
- B. Using stock transfer reservations for stock transfer
- C. Using purchasing costs for automated source prioritization
- D. Using quotations for internal and external procurement
- E. Using run schedule quantities for in-house production
正解: A,B,E
質問 84
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?
- A. Change the special procurement key of the phantom assembly in the BOM.
- B. Change the explosion type of the phantom assembly in the BOM.
- C. Change the item category of the phantom assembly in the BOM.
- D. Change the phantom item indicator for the phantom assembly in the BOM.
正解: B
質問 85
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
- A. It enables the propagation of network alerts across the bill of materials structure
- B. It propagates changed sales order priorities to the pegged planned orders
- C. It links receipts from an alternative location in case of a shortage in the default location
- D. It replaces fixed pegging relationships unless they have been created for stock
正解: C
質問 86
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order generates capacity requirements.
- B. The planned order is converted to a production order.
- C. The planned order's component availability is checked
- D. The planned order's components are copied from the picking list.
正解: A
質問 87
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A. Material
- B. Production version
- C. Work center
- D. Plant
正解: A,C
質問 88
......