質問 47
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By plant
  • B. By period
  • C. By industry
  • D. By material type

正解: A,B

 

質問 48
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Planning at assembly level (70)
  • B. Planning with final assembly (40)
  • C. Make-to-order production (20)
  • D. Planning without final assembly (50)

正解: D

 

質問 49
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question.

  • A. Posting of goods receipt for the product
  • B. Reduction of associated capacity requirements
  • C. Archiving of documents for assembly scrap
  • D. Material staging for next order in sequence
  • E. Posting of production costs to the production cost collector

正解: A,B,E

 

質問 50
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

  • A. Minimum wait time
  • B. Queue time
  • C. Production time
  • D. Goods receipt processing time

正解: B

 

質問 51
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Orders (dispatched) chart
  • B. Capacity requirements chart
  • C. Work center capacities chart
  • D. Order (pool) chart

正解: B,C

 

質問 52
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?

  • A. The requirements date occurs before that of a firmed planned receipt
  • B. The requirement no longer exists
  • C. The requirements date occurs that of a firmed planned receipt
  • D. A firmed planned receipt cannot be rescheduled

正解: A

 

質問 53
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.

  • A. Task list group number
  • B. Validity dates
  • C. Work center hierarchy
  • D. BOM status
  • E. Lot sizes

正解: B,D,E

 

質問 54
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are 3 correct answers to this question.

  • A. SAP Concur
  • B. SAP Ariba
  • C. SAP C/4HANA
  • D. SAP Field glass
  • E. SAP SuccessFactors

正解: A,B,D

 

質問 55
In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP controller
  • B. MRP type
  • C. MRP planning file
  • D. MRP group

正解: A

 

質問 56
What are pillars of SAP Activate?
There are 2 correct answers to this question.

  • A. Premium engagement
  • B. SAP Best Practices
  • C. SAP MaxAttention
  • D. Guided Configuration

正解: B,D

 

質問 57
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To provide timely updates of inventory management for the staged components
  • B. To stage different components for a production line simultaneously
  • C. To reduce the totalproduction lead time for along production line
  • D. To determine the work in progress along the production line

正解: A,D

 

質問 58
You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question.

  • A. Customer
  • B. Workcenter
  • C. Plant
  • D. Supplier

正解: A,C,D

 

質問 59
A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question.

  • A. They can be applied to make-to-stock production order.
  • B. They can be used for repetitive manufacturing.
  • C. They can be used for manufacturing with collective orders.
  • D. They can be created automatically during month end process.

正解: A,B

 

質問 60
For what production type are production orders used?

  • A. Replenishment controlled by control cycles
  • B. Process manufacturing processes
  • C. Period and quantity-oriented production
  • D. Discrete manufacturing processes

正解: D

 

質問 61
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple operations are maintained for one product
  • B. When multiple production versions are maintained for one product
  • C. When alternate resourcesare used within one operation
  • D. When multiple planned orders exists in one resource

正解: C

 

質問 62
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?

  • A. By providing future demands from demand figures in the past
  • B. By providing multilevel material requirements planning
  • C. By providing replenishment proposals with exact times
  • D. By providing cross-plant planning and deployment

正解: C

 

質問 63
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Purchase requisition
  • B. Production order
  • C. Scheduling agreement schedule line
  • D. Planned order
  • E. Stock transport order

正解: A,C,D

 

質問 64
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • B. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
  • C. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
  • D. The new operation is inserted at the desired time the previously dispatched operation is moved backward.

正解: D

 

質問 65
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.

  • A. /SAPAPO/CURTO_CREATE
  • B. /SAPAPO/PPDS_DELTA_ORD_TRANS
  • C. /SAPAPO/CREATE_LOCATION
  • D. /SAPAPO/UPD_LOC_SP_PL

正解: B

 

質問 66
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?

  • A. Repetitive manufacturing profile
  • B. Cost collector
  • C. Production version
  • D. Bil1 of material

正解: C

 

質問 67
In Demand-Driven Replenishment, materials are classified according to several criteri a. What criteria can you use?
There are 3 correct answers to this question

  • A. Demand variation
  • B. Goods issue value
  • C. Minimum order quantity
  • D. Usage in bill of materials
  • E. Average daily usage

正解: A,B,D

 

質問 68
When do you use variant bills of materials (BOMs)?

  • A. When a material has a configurable BOM
  • B. When a material has multiple BOMs
  • C. When multiple master also have similar BOMs
  • D. When multiple master also have the same BOM

正解: D

 

質問 69
......


SAP C-TS422-2020 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Outline production planning components and functions, differentiate consumption-based planning vs. MRP
  • Identify repetitive manufacturing specific master data
トピック 2
  • Identify and explain production relevant master data
  • Outline best practices for using SAP S
  • 4HANA
トピック 3
  • Outline both motivation and background of SAP S
  • 4HANA
  • Detailed scheduling planning board) and advanced planning
トピック 4
  • Characterize process order elements and process order processing
  • Outline the basics and master data of advanced planning
トピック 5
  • Material Requirements Planning in SAP S
  • 4HANA
  • Describe its main components, the lines of business, and the SAP User Experience strategy
トピック 6
  • Select and apply planning strategies, use the planning table, characterize long-term planning
  • Determine master data objects for process orders

 

SAP C-TS422-2020リアル2022年最新のブレーン問題集模擬試験問題集:https://jp.fast2test.com/C-TS422-2020-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어