2023年最新のC-TS422-2020試験問題集で最近更新された150問題
SAP C-TS422-2020リアル2023年最新のブレーン問題集で模擬試験問題集
SAP C-TS422-2020認定を保持することは、生産プランナー、製造業務、ソリューションアーキテクト、コンサルタントなど、さまざまな役割の専門家にとって有益です。この認定は、潜在的な雇用主、クライアント、同僚へのSAP S/4HANA生産計画と製造に関する専門知識を専門家に実証するのに役立ちます。さらに、認定された専門家は、SAPコミュニティに参加し、フォーラム、イベント、トレーニングの機会など、さまざまなリソースにアクセスできます。
質問 # 50
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.
- A. Operation duration
- B. Total replenishment lead time
- C. In-house production time
- D. Planned delivery time
正解:C、D
質問 # 51
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Scrap percentage
- B. Item type
- C. Installation point
- D. Quantity
正解:C、D
質問 # 52
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.
- A. Order-related
- B. Cost-related
- C. Milestone-related
- D. Product-related
正解:A、D
質問 # 53
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question.
- A. SAP S/4HANA Professional services cloud
- B. SAP S/4HANA private cloud
- C. SAP S/4HANA on premise
- D. SAP S/4AHANA Enterprise Management cloud
正解:B、C
質問 # 54
Which data object can be updated with the scheduling results of a routing?
- A. MRP profile
- B. Material master
- C. Production version
- D. Production scheduling profile
正解:B
質問 # 55
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question.
- A. Operation control key
- B. Confirmation profile
- C. Scheduling margin key
- D. Production scheduling profile
正解:A、D
質問 # 56
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
- A. Past procurement quantities
- B. Past quotation quantities
- C. One-off events
- D. Past sales order quantities
- E. Market intelligence
正解:C、D、E
質問 # 57
What are the consequences if operation status Dispatched is set for a production order operation?
- A. You canreschedule the order using material requirements planning.
- B. You can reschedule the order using lead time scheduling.
- C. You can reschedule the operation using finite Scheduling in a planning board.
- D. You can reschedule the operation using lead the scheduling.
正解:C
質問 # 58
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Control cycle
- B. Replenishment strategy
- C. Rate routing
- D. Production supply area
正解:A
質問 # 59
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question
- A. Planning file entries
- B. WIP list
- C. Operation list
- D. Production list
- E. Production overview
正解:B、C、E
質問 # 60
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.
- A. Manually firm all planned orders for materials within the replenishment lead time of the material
- B. In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material
- C. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
- D. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
正解:A、C
質問 # 61
When a developer creates a new SAP Fiori app, they begin by selecting a template to ensure the application has a consistent look-and-feel. What types of templates can a developer choose? There are 3 correct answers to this question.
- A. Maintenance view
- B. Transactional
- C. Analytical
- D. Web Dynpro
- E. Factsheet
正解:B、C、D
質問 # 62
Which material master setting is required to use the repetitive planning table for production with production orders?
- A. An overall profile be assigned on the Work Scheduling view
- B. At least one valid production version must exist on the MRP4 view
- C. The Selection Method must be set to "2 Selection by production version".
- D. A repetitive manufacturing profile must be assigned on the MRP4 view
正解:D
質問 # 63
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.
- A. /SAPAPO/PPDS_DELTA_ORD_TRANS
- B. /SAPAPO/UPD_LOC_SP_PL
- C. /SAPAPO/CURTO_CREATE
- D. /SAPAPO/CREATE_LOCATION
正解:A
質問 # 64
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question.
- A. Rough-cut capacity planning
- B. Monitor Production Orders Fiori app
- C. Lock-free inventory movements
- D. Flow manufacturing
- E. Material Coverage Fiori app
正解:B、C、E
質問 # 65
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The most restrictive status
- B. The least restrictive status
- C. The cross-plant status
- D. The plant-specific status
正解:A
質問 # 66
What is a work center hierarchy in SAP S/4HANA capacity planning?
- A. A group of alternative work centers providing a cumulative available capacity for production
- B. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
- C. A group of alternative work centers for production, structured in hierarchy levels by prior ties
- D. A group of work centers in a production line beingused in sequence for production
正解:A
質問 # 67
What are examples of assignment objects you can maintain in the Engineering Workbench?
There are 3 correct answers to this question.
- A. Routing to sequence assignment
- B. Material to routing assignment
- C. Material to bill of materials (BOM) assignment
- D. Material to production version assignment
- E. Component assignment
正解:B、C、E
質問 # 68
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with a parallel sequence in the routing
- B. A production line with an alternative sequence in the routing
- C. A production line with more than one work center
- D. A production line with prioritized alternative work centers
正解:C
質問 # 69
Which task list types can have parallel sequences? There are 2 correct answers to this question.
- A. Reference operation sets (S)
- B. Routings (N)
- C. Master recipes (2)
- D. Rate routings (R)
正解:B、D
質問 # 70
What are the three layers in the SAP Best Practices Content for SAP S/4HANA? There are 3 correct answers to this question.
- A. Solution Package
- B. Process Flows
- C. Building Blocks
- D. Scope Items
正解:A、C、D
解説:
E, Test Scripts
質問 # 71
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.
- A. Master data selection
- B. Planning selection
- C. Capacity requirements determination
- D. Actual cost calculation
- E. Order type determination
正解:A、C、E
質問 # 72
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.
- A. Add the agreement to the quota arrangement and mark it for MRP relevance.
- B. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
- C. Add the agreement to the source list and mark itfor MRP relevance.
- D. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
正解:C、D
質問 # 73
What are pillars of SAP Activate?
There are 2 correct answers to this question.
- A. Premium engagement
- B. SAP MaxAttention
- C. Guided Configuration
- D. SAP Best Practices
正解:C、D
質問 # 74
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?
- A. Production time
- B. Minimum wait time
- C. Queue time
- D. Goods receipt processing time
正解:C
質問 # 75
......
試験は80の質問で構成され、180分間続きます。生産注文、BOM、ルーティング、需要管理、能力計画など、SAP S/4HANAの生産計画と製造に関連するさまざまなトピックをカバーしています。この試験では、販売や流通、材料管理、財務会計など、他のSAPモジュールとの統合に関連するトピックもカバーしています。
SAP C_TS422_2020認定試験に合格するためには、候補者はSAP S/4HANA生産計画と製造に関する良好な理解を持つ必要があります。これには、システムのアーキテクチャや、利用可能なさまざまなモジュールや機能の知識が含まれます。候補者は、SAP S/4HANAで使用できるさまざまな計画戦略、例えばmake-to-stockやmake-to-orderなどにも精通している必要があります。さらに、製造計画と製造に関するSAP S/4HANAのツール、Production Planning and Control(PP)モジュールやMaterial Requirements Planning(MRP)モジュールなどにも経験を持っている必要があります。適切な準備と経験を持つことで、個人はSAP S/4HANA生産計画と製造の専門知識を証明し、SAP C_TS422_2020認定試験に合格することができます。
厳密検証されたC-TS422-2020試験問題集と解答で無料提供のC-TS422-2020問題と正解付き:https://jp.fast2test.com/C-TS422-2020-premium-file.html