質問 # 67
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?

  • A. Infinite resource and infinite strategy
  • B. Finite resource and infinite strategy
  • C. Infinite resource and finite strategy
  • D. Finite resource and finite strategy

正解:D


質問 # 68
What is the purpose of collective orders?

  • A. To combine order management of co-products and by-products with the main product
  • B. To manage production orders for an entirefinished product on multiple levels
  • C. To post any component withdrawals single back flush with order confirmation
  • D. To post production costs ona cost collector instead of the production order

正解:B


質問 # 69
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.

  • A. /SAPAPO/PPDS_DELTA_ORD_TRANS
  • B. /SAPAPO/CREATE_LOCATION
  • C. /SAPAPO/CURTO_CREATE
  • D. /SAPAPO/UPD_LOC_SP_PL

正解:A


質問 # 70
Which of the following functions can be performed when the production order has the status "Created" (CRTD)? Please choose the correct answer.

  • A. A user trigger printing of shop floor paper manually (transaction CO02).
  • B. A user trigger material availability check via mass processing (transaction COHV)
  • C. A user can schedule a background job to release production orders (transaction COOIS).
  • D. A user can trigger material staging via mass processing (transaction COHV).

正解:D


質問 # 71
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.

  • A. At order release
  • B. At order creation
  • C. At order settlement
  • D. At order confirmation

正解:A、B


質問 # 72
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Select an alternative mode on a resource.
  • B. Form optimum sequences to reduce setup times.
  • C. Execute a new production planning run.
  • D. Adjust the available capacity.
  • E. Reduce the planning window.

正解:A、B、D


質問 # 73
A planner updated a production order status from partially confirmed "PCNF"to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?

  • A. The buyer can still see component reservations
  • B. The production manager can still see the capacity requirements
  • C. The production operator cannot enter additional confirmations
  • D. The warehouse clerk still carry out goods issue transactions

正解:C


質問 # 74
What is a typical transportation processing SAP Transportation Management?

  • A. Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting
  • B. Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting
  • C. Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting
  • D. Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting

正解:B


質問 # 75
Which of the following is a valid sequence of the main activities in product on order processing?

  • A. Creation, scheduling, release, variance calculation, confirmation
  • B. Creation, scheduling, release, material withdrawal, confirmation
  • C. Creation, release, scheduling, material withdrawal, confirmation
  • D. Creation, staging, release, material withdrawal, confirmation

正解:B


質問 # 76
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Setup time
  • B. Float after production
  • C. Total replenishment lead time
  • D. Planned delivery time

正解:B、D


質問 # 77
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple production versions are maintained for one product
  • B. When multiple operations are maintained for one product
  • C. When alternate resourcesare used within one operation
  • D. When multiple planned orders exists in one resource

正解:C


質問 # 78
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Sales order-specific planning run is required.
  • B. Storage location MRP areas are required.
  • C. Sales order-specific stock is created
  • D. Net requirements calculation is sales order-specific.
  • E. Production orders are created with sales order reference.

正解:C、D、E


質問 # 79
Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available? There are 2 correct answers to this question.

  • A. Production list
  • B. Resource utilization
  • C. Resource overview
  • D. Order list

正解:B、D


質問 # 80
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Queue time
  • B. Move time
  • C. Float before production
  • D. Pick/pack time
  • E. Wait time

正解:A、D、E


質問 # 81
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of production costs to the production cost collector
  • B. Material staging for next order in sequence
  • C. Posting of goods receipt for the product
  • D. Archiving of documents for assembly scrap
  • E. Reduction of associated capacity requirements

正解:A、C、E


質問 # 82
A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question.

  • A. They can be used for manufacturing with collective orders.
  • B. They can be created automatically during month end process.
  • C. They can be applied to make-to-stock production order.
  • D. They can be used for repetitive manufacturing.

正解:C、D


質問 # 83
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Picking list
  • B. Backflushing
  • C. Transfer Order
  • D. Kanban

正解:A


質問 # 84
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.

  • A. Engineering Change Record
  • B. Bill of Material
  • C. Production Version
  • D. Routing

正解:B、C、D


質問 # 85
You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question.

  • A. Customer
  • B. Plant
  • C. Workcenter
  • D. Supplier

正解:A、B、D


質問 # 86
......


SAP C_TS422_2020、またはSAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Examは、SAP S/4HANA Production Planning and Manufacturingモジュールの理解と知識をテストするよう設計されています。この試験は、SAPコンサルタント、プロジェクトチームメンバー、またはエンドユーザーとして働く個人が、SAP S/4HANA Production Planning and Manufacturingモジュールの実装と構成の専門知識を検証したい場合に適しています。

 

あなたを合格させるSAP試験にはC-TS422-2020試験問題集:https://jp.fast2test.com/C-TS422-2020-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어