最新Microsoft MB-320一発合格!試験リアル問題集最新の[2023年10月]
良質なMB-320問題集はここFast2test問題はあなたの合格させて見せます。明るい未来はクリックから始まる!
質問 # 75
You are the product manager at a paint manufacturing company. Paint base is produced in 100 gallon batches.
The paint base can be packaged in 1 gallon, 5 gallon, and 10 gallon containers.
You want to use consolidated batch orders for the bulk paint base item. You need to set up the items and formulas to allow for consolidated batch orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正解:
解説:
Explanation
質問 # 76
A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
正解:
解説:
Explanation
質問 # 77
A company uses Lean manufacturing concepts to produce paper plates redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正解:
解説:
Explanation
質問 # 78
An inventory control clerk manages adjustments in inventory.
Some adjustments have a cost impact. Other adjustments must be posted to a specific ledger account or must be registered in inventory.
You need to configure the system.
Which journal types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
正解:
解説:
Explanation
質問 # 79
A customer produces light projection toys for holiday decorations throughout the year.
You are in the first month of a season. Production flows take one day to complete.
The floor supervisor reports that seasonal production targets will not be met. You review the Kanban schedule board and identify thousands of unplanned jobs.
You need to plan the jobs to be completed two weeks prior to the start of the next season.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Set the Automatic planning option for each unscheduled job to Yes
- B. Set the Automatic planning option for each unscheduled job to No
- C. Manually schedule each unscheduled job on its due date
- D. Manually schedule each unscheduled job to the next period of the start of the next season
- E. Manually schedule each unscheduled job forward from the date of the end of the season
正解:C、E
解説:
Section: Create, process, and manage production batch orders
Explanation/Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/lean-manufacturing-kanban- job-scheduling
質問 # 80
A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the sample sub assembly item and resource sanding process.
You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.
You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.
正解:
解説:
質問 # 81
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.

正解:
解説:
Explanation
質問 # 82
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished.
You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正解:
解説:
Explanation
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufac
質問 # 83
A company configures master planning to order large and expensive aluminum sheets that are only available at certain times of the year.
The warehouse manager reports that replenishment levels are too high, causing inventory value to be over budget. In addition, the aluminum sheets take up too much space on the shop floor.
You need to configure the appropriate replenishment method.
Which coverage dimension should you use?
- A. Min/Max
- B. Manual
- C. Per requirement
- D. Per period
正解:D
質問 # 84
A customer produces light projection toys for holiday decorations throughout the year. Because holidays vary by region and time of year, the company wants to implement Lean manufacturing.
The production process creates the toys at the following work cell: stands, main assembly, electric, visuals, and packaging.
You need to implement the production process.
Which configuration options should you use? To answer, select the appropriate configuration options in the answer area.
NOTE: Each correct selection is worth one point.
正解:
解説:
Explanation
質問 # 85
You need to create the constraint for the ML seat selection.
Which expression constraint should you use?
- A. Implies[Trim==Legend,Seat==ML]
- B. Implies[Seat==ML,Trim==Legend]
- C. [Trim==Legend|Seat==ML]
- D. Seat!=ML
正解:B
解説:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/expression-constraints-table-constraints-produc
質問 # 86
A process manufacturing company is implementing rebates in Dynamics 365 for Finance and Operations for some of their customers on specific items.
You are the production consultant in charge of implementing the processes needed for calculating and applying the rebates for the subset of customer and items.
You need to implement the order of transactions to process the rebates.
In which order should the actions be performed? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
正解:
解説:
Explanation
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/sales-marketing/tasks/process-customer-rebates
質問 # 87
You are the production supervisor at a chemical processing plant. You must track attributes for each batch of chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as finished.
You need to ensure that the values of attributes are updated and tracked.
What three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Create a test instrument for each attribute
- B. Assign the attributes to the chemicals
- C. Create attribute types
- D. Set up batch attributes
- E. Assign the attributes to the appropriate test on the test group
正解:A、B、D
質問 # 88
You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to assign a cost of 1,000 US dollars to the night shift.
To complete this task, sign in to Dynamics 365 portal. You must complete Task 1 before completing this task. Task 1 is the creation of a new cost category named NightShift for the night shift.
正解:
解説:
You need to configure a cost group with the type set to 'Direct Manufacturing'. This cost group can then be associated to the Nightshift cost category.
Navigate to Production control > Setup > Routes > Cost groups
Click the +New button to add a new cost group.
Give the cost group a name such as Nightshift.
Configure the cost group type to be Direct Manufacturing.
Configure the behavior to Fixed.
Go to the NightShift cost category.
Enter 1000 in the Cost Price field.
Select the Nightshift cost group in the Cost Group field.
Click Close to close the window.
質問 # 89
A paint manufacturer is using Process manufacturing. The manufacturer has a quality error. Batches of paint that use the wrong formula have been marked for rework.
The production planner reports they cannot schedule the batch order even though the order has been estimated.
You need to add reservations to the items to be used for the rework order.
What should you do?
- A. Reserve the inventory in the formula
- B. Add by-products that need to be used and then re-estimate
- C. Add co-products that need to be used and then re-estimate
- D. Reset the batch order and delete the formula items. Re-enter the formula items
正解:A
質問 # 90
A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
正解:
解説:
質問 # 91
......
Microsoft練習テストエンジンMB-320問題:https://drive.google.com/open?id=1rD4kW8-KHHVi8SezWEY2mlBDps5aV8Ek
試験合格保証有効なMicrosoft MB-320問題集:https://jp.fast2test.com/MB-320-premium-file.html