質問 72
You need to configure the bicycles' production resource.
Which option should you use?

  • A. Exclusive capacity set to no and enter a Batch capacity.
  • B. Exclusive capacity set to yes and enter a Batch capacity.
  • C. Exclusive capacity set to no and infinite capacity.
  • D. Exclusive capacity set to yes and infinite capacity.

正解: D

解説:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/operations-resources

 

質問 73
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

正解:

解説:

Explanation

 

質問 74
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).

After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)

You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)

You need to determine the method to schedule the production lines.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

正解:

解説:

 

質問 75
You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company.
You must build a new configuration model and include constraints in the model.
You need to determine which constraint type to use for each scenario.
Which constraint type should you use? To answer, drag the appropriate constraint types to the correct scenarios. Each constraint type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

正解:

解説:

 

質問 76
A company implements Dynamics 365 for Finance and Operations.
Production orders are generated for products directly from projects. You create the following production order:

Use the drop-down menus to select the answer choice that answers each question based on the information presented in the graphic. NOTE: Each correct selection is worth one point.

正解:

解説:

Explanation

 

質問 77
A company manufactures and sells speaker boxes. The speaker boxes can be silver or black with a basic or upgraded wiring harness assembly.
The speaker box must be created in the item master so the variables for colors and harness type can be assigned at order entry.
You need to create a new item that supports multiple variables.
What should you do?

  • A. Create a new product. Select constraint-based configuration as the configuration technology
  • B. Create a new product. Select predefined variant as the configuration technology
  • C. Create a new product master. Select constraint-based configuration as the configuration technology
  • D. Create a new product master. Select predefined variant as the configuration technology

正解: D

解説:
Section: Set up and configure manufacturing

 

質問 78
A company manufactures automobile engines.
You must create product configurations for values that are used in different types of engines. Each value is based on a master valve design. Different gaskets and fittings are used to allow valves to work with different engines.
You need to translate production plans into Dynamics 365 Finance and Operations elements.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

正解:

解説:

Explanation

 

質問 79
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses batch tracking of raw materials, semi-finished goods, and finished goods.
It is difficult to determine when semi-finished and finished goods were produced and expired.
You need to incorporate automatic batch expiration dates for tracked items that are produced.
Solution:
1. Create a new batch number group that includes production activation in the settings.
2. Assign the group to the produced items.
3. Assign shelf life period in days to the items that require expiration dates.
Does the solution meet the goal?

  • A. Yes
  • B. No

正解: B

 

質問 80
A company uses Discreet manufacturing concepts to produce cables. The company's production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identify production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

正解:

解説:

Explanation

 

質問 81
You have updated a cost category price from $5.00 to S7.00. You process a production order which uses the cost category. After ending the order, you realize a new standard cost was not calculated after the price update. You need to validate how this impacted the financial voucher transactions. What transaction would you see in the general ledger?

  • A. $2.00 debit to the production quantity variance account
  • B. $2.00 debit to the production price variance account
  • C. $2.00 credit to the lot size variance account
  • D. $2.00 credit to the production price variance account

正解: B

 

質問 82
A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You have created the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You create separate subcontracting purchase orders to account for the service. You attempt to add the service item to the BOM. The system generates an error.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

正解:

解説:

 

質問 83
A company uses Discreet manufacturing concepts to produce cables. The company's production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identify production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

正解:

解説:

 

質問 84
You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. unmachined plastic pieces
  • B. mold tooling
  • C. machined plastic pieces
  • D. excess plastic

正解: A,C

 

質問 85
You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?

  • A. Run the pricing simulator for the limited-edition bicycle for a quantity of one.
  • B. Run the category price rules for the limited-edition bicycle using a cost-plus calculation.
  • C. Run inventory close for the BOM items for the limited-edition bicycle.
  • D. Create the production order for the limited-edition bicycle and click estimate.

正解: D

 

質問 86
A customer produces light projection toys for holiday decorations throughout the year. The production process creates the projections toy at the following work cells stands, main assembly, electric, visuals, and packaging.
Vendors must create visual templates for the company for each season. They must manage the transfer of visual templates to the warehouse. Each transfer for each vendor must use the same purchase agreement.
You need to configure the subcontracted transfer activity.
What should you do?

  • A. Set the transfer activity Freighted by value to Shipper. Ensure that purchase agreements include the vendor ID of the warehouse.
  • B. Set the transfer Freighted by value to Carrier. Ensure that purchase agreements include the vendor ID of the vendor.
  • C. Set the transfer activity Freighted by value to Recipient. Ensure that purchase agreements include the vendor ID of the vendor.
  • D. Set the transfer activity Freighted by value to Carrier. Ensure that purchase agreements include the vendor ID of the warehouse.
  • E. Set the transfer activity Freighted by value to Recipient. Ensure that purchase agreements include the vendor ID of the warehouse.
  • F. Set the transfer Freighted by value to Shipper. Ensure that purchase agreements include the vendor ID of the vendor.

正解: E

解説:
Section: Create, process, and manage production batch orders
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/activity- based-subcontracting#subcontracted-transfer-activities

 

質問 87
An inventory control clerk manages adjustments in inventory.
Some adjustments have a cost impact. Other adjustments must be posted to a specific ledger account or must be registered in inventory.
You need to configure the system.
Which journal types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

正解:

解説:

 

質問 88
A company uses Dynamics 365 for Finance and Operations for Process manufacturing.
Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time.
You need to set up the system.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.

正解:

解説:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/set-up-product-sequences

 

質問 89
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of you cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.5 hours.
What three actions are required on the rework order? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Manually reserve batch 120008 after estimating the batch order.
  • B. Delete all items from the production formula except for 20 grams of sugar.
  • C. Add 20 grams of sugar to the production formula.
  • D. Add a route operation for 0.5 run time hours of stirring.
  • E. Delete all route operations except for a half an hour stirring operation.

正解: A,B,E

 

質問 90
A customer produces light projection toys for holiday decorations throughout the year. Vendors have negotiated rebate agreements as a condition of their contact. The contract also contains the visual templates required for the customer to use in a season.
Vendor rebate agreements must only be applied if the following requirements are met:
* Units of measure for deliverables are the same unit of measure as on the agreement
* The agreement is valid as of the date a purchase order is generated
You need to configure the vendor rebate agreements.
What should you do?

  • A. Set the Unit of measure rebate option field value to Exact match
  • B. Set the Cumulative purchase by field value to the beginning of the season date
  • C. Set the Rebate line break type field value to Amount
  • D. Set the Rebate line break type field value to Quantity

正解: A

解説:
Section: Create, process, and manage production batch orders
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/procurement/vendor-rebates

 

質問 91
You manage pricing for a food processing company. The raw materials used by the business is a commodity-traded product and has a changing purchase price.
You must implement the commodity pricing module. You create a pricing template with margin data.
You need to calculate the cost price for the manufactured goods as well as the sales price based on margin standards.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

正解:

解説:

Explanation

 

質問 92
A company implements Dynamics 365 Finance and Operations.
You need to ensure that cost roll-ups and sales price calculations are configured for the scenario. Which options should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

正解:

解説:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/cost-management/bom-calculations

 

質問 93
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

正解:

解説:

1 - Add the Frames and Wheels configuration groups to the configuration route.
2 - Configure the two bicycle configurations.
3 - Create a new Bill of materials version with component lines for the frames and wheel options.
4 - Assign the Frames and Wheels configuration groups to the frame and wheel items respectively.
5 - Create a configuration rule for the Frames group that selects valid wheels when a frame is selected.

 

質問 94
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
* Add a new version to the existing production flow. Set the expiration date to the end of the month.
* Create an activity for the new process step and add it in the proper sequence.
* Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.
* Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rule as the replacement rule.
Does the solution meet the goal?

  • A. Yes
  • B. No

正解: B

 

質問 95
......


Microsoft MB-320 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Configure And Manage Costing Sheets, Inventory Dimensions In Production, Manage Operations And Routes, Manage A Product Configuration Model
トピック 2
  • Process Lean Orders By Using Kanban Boards
  • Process Production Orders
  • Identify The Process Workflows For Managing A Production Environment
トピック 3
  • Implement Parameters, Production Orders, And Life Cycle
  • Implement And Manage Subcontractors
トピック 4
  • Validate The Interconnectivity Between General Ledger And The Production Control Modules
  • Create And Manage Products
トピック 5
  • Configure And Manage Constraints, Build A Product Configuration Model
  • Create Common Components Of Production And Lean Orders
トピック 6
  • Implement Containerized Packaging, Implement And Configure Rebates, Implement Lot And Batch Control Processes
トピック 7
  • Identify The Capabilities And Limitations Of The Manufacturing Executions Module
  • Identify The Responsibilities Of The Security Role Managing The Production Processes
トピック 8
  • Create And Manage Co-Products And By-Products, Manage Planning Items, Formulas With Scalable And Percentage-Based Calculations
トピック 9
  • Perform Processes To Manage Scrap And Waste Of A Batch Order
  • Configure Batch Reservations And Expiration Dates
  • Perform A Batch Rework
トピック 10
  • Identify And Configure Batch Attributes For Processes
  • Integrate Manufacturing Processes With Warehouse Management System (WMS)
トピック 11
  • Create And Configure Catch Weight Items, Production Flows, Manage Kanbans, Manage Formulas, Process Batch, Production, And Lean Orders
トピック 12
  • Implement And Test The Production Control Module
  • Identify Components Of Unified Manufacturing
トピック 13
  • Manage Scheduling And Subcontracting
  • Perform Processes To Manage Scrap And Waste Of A Discrete Order
  • Create And Maintain Project Items And Item Tasks
トピック 14
  • Create, Process, And Manage Production Batch Orders
  • Create Planned Production Batch Orders By Using The Master Planning Module
トピック 15
  • Create And Manage Formulas With Co-Products, By-Products, And Planning Items
  • Configure And Manage Manufacturing Executions
トピック 16
  • Identify Items And Substitute Items Within A Bill Of Material (BOM) Or Formula
  • Apply Product Compliance Standards
  • Set Up And Maintain Commodity Pricing
トピック 17
  • Implement And Manage Work Calendars, Implement And Manage Resources
  • Describe The Purpose And Capabilities Of The Product Configuration Models

 

有効な問題最新版を試そうMB-320テスト解釈MB-320有効な試験ガイド:https://jp.fast2test.com/MB-320-premium-file.html

MB-320実際の問題解答PDFは100%カバー率でリアル試験問題:https://drive.google.com/open?id=1rD4kW8-KHHVi8SezWEY2mlBDps5aV8Ek


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어