2025年09月22日合格確定ガイド準備E_S4HCON2023試験知能問題集 [Q42-Q66]

Share

2025年09月22日合格確定ガイド準備E_S4HCON2023試験知能問題集

無料最新SAP Certified Technology Specialist E_S4HCON2023リアル試験問題と回答2025年更新

質問 # 42
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SUM with DMO
  • C. SWPM using the Backup / Restore procedure
  • D. SWPM using the Load procedure

正解:D


質問 # 43
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.

  • A. You need to build up an SI check framework by applying SAP Notes
  • B. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
  • C. The errors from the SI checks must be solved, otherwise. SUM will report an error
  • D. The SI checks are executed in the development system and the results are transported into the subsequent systems

正解:A、B


質問 # 44
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In DMO Migration Preparation
  • B. In SUM Parameters
  • C. In SUM Phaselist
  • D. In Process Control Center

正解:B、D


質問 # 45
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解:B


質問 # 46
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the job log for the corresponding job in SM37 (Job Overview)
  • B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • C. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  • D. In the corresponding R3trans log files of this phase

正解:A、C


質問 # 47
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • B. Shadow repository creation (EU_IMPORT*)
  • C. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • D. ParaUel distribution (PARDIST_SHD)

正解:C


質問 # 48
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SYCM (Simplification Database Content)
  • B. SE80 (Object Navigator)
  • C. SAT (Runtime Analysis)
  • D. ATC (ABAP Test Cockpit)

正解:B、D


質問 # 49
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path was stored in file sumabap conf during registration
  • B. The path was stored in file host_profile during registration
  • C. The path is taken from the URL entered in the browser to start SUM
  • D. The path was stored to the environment of user <sid>adm during registration

正解:A


質問 # 50
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:

  • A. Activate the required business functions manually in the production system.
  • B. During conversion, SUM delivers some business functions already activated.
  • C. Import a transport request from the development system that contains the recording of the activation.
  • D. Specify the business functions that need to be switched on during the prepare part of SUM.

正解:B、C


質問 # 51
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:

  • A. Keep archiving on during the whole procedure.
  • B. Reuse a profile for the shadow instance from a previous run.
  • C. Choose the instance number of the shadow instance.
  • D. Use the Near Zero Downtime Maintenance Technology (NZDM).

正解:B、C


質問 # 52
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Perform the migration of data into the new data structure
  • B. Run the database migration to the SAP HANA database
  • C. Apply the recommendations of the simplification list
  • D. Check the compatibility of custom code with SAP S/4HANA

正解:C、D


質問 # 53
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. SAP S/4HANA conversion without DMO
  • C. SAP S/4HANA conversion including DMO
  • D. Benchmark tool
  • E. DMO without system update

正解:A、B、C


質問 # 54
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • B. The SAP Support Packages contained in the upgrade media
  • C. The SAP Support Packages that will be bound to the upgrade
  • D. The SAP Support Packages found in the download directory

正解:D


質問 # 55
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above?
There are 3 correct answers to this question.

  • A. Database migration
  • B. Support Package Stack update
  • C. Dual Stack split
  • D. Release upgrade
  • E. Homogenous system copy

正解:A、B、D


質問 # 56
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

  • A. When upgrading an SAP ECC system with DMO
  • B. When performing an SAP S/4HANA conversion without u DMO
  • C. When performing an SAP S/4HANA conversion with DMO
  • D. When upgrading an SAP S/4HANA Server system

正解:A、D


質問 # 57
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. AA
  • B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.

正解:B


質問 # 58
Which of the following SUM activities require a stack XML file calculated by the maintenance planner?
Note: There are 3 correct answers to this question.

  • A. Prerequisite check
  • B. SAP S/4HANA conversion without DMO
  • C. SAP S/4HANA conversion including DMO
  • D. Benchmark tool
  • E. DMO without system update

正解:A、B、C


質問 # 59
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

  • A. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
  • B. Check the log files written in the SUM directory subdirectory abap. subdirectory log
  • C. Check the Charts Control Center in the SUM Ul
  • D. Check the dump size of the database export on disk.

正解:B、D


質問 # 60
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It explains the database migration option (DMO) of SUM.
  • B. It is a database-specific document.
  • C. It contains a section about the simplification item (SI) checks.
  • D. It explains where to find information about the custom code analysis.

正解:C、D


質問 # 61
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. A Standalone SAP system with ABAP 7.51 or above
  • B. AA
  • C. An SAP S4HANA 1709 sandbox system

正解:A、C


質問 # 62
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the database migration option (DMO) for SUM
  • B. Using the main configuration option "Standard" when applying SAP Support Packages
  • C. Using the main configuration option "Single System" in case of an upgrade.
  • D. Using the main configuration option "Single System" when installing an Add-On

正解:D


質問 # 63
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

  • A. Downtime migration
  • B. Silent data migration (SDM)
  • C. Shadow on target creation
  • D. Downtime conversion

正解:A


質問 # 64
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • D. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
    &UC) procedure.

正解:B


質問 # 65
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.

  • A. Conversion of application tables (PARCONV_UPG)
  • B. Modification adjustment (SPAU)
  • C. Activation of dictionary objects (ACT_UPG)
  • D. Modification adjustment (SPDD)

正解:C、D


質問 # 66
......


SAP E_S4HCON2023 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • SAP S
  • 4HANA 変換および SAP システム アップグレード中の SAP システム ランドスケープの処理について説明します。SAP システム ランドスケープの管理には、SAP S
  • 4HANA との互換性に関する戦略的な計画が含まれます。コンサルタントは、システム間の依存関係を評価して、中断を最小限に抑えながらシームレスな移行を実現する方法を学びます。
トピック 2
  • SAP S
  • 4HANA 変換準備フェーズで必要なアクションを説明および実行します。コンサルタントは、プロジェクトの範囲を定義し、準備状況の評価を実施して、既存の SAP ランドスケープのギャップを特定する方法を学びます。この基礎フェーズは、プロジェクトの目的とビジネス目標を一致させるために重要です。
トピック 3
  • SPDD と SPAU を使用して変更調整を実行します。変更調整プロセスでは、SAP コンサルタントに、SPDD と SPAU を使用して変更されたオブジェクトを効果的に適応させる方法を教えます。コンサルタントは、カスタム開発が SAP S
  • 4HANA 機能と互換性を保つようにする方法を学びます。
トピック 4
  • SUM に必要な手動準備と後続のアクティビティについて説明します。SUM の手動準備には、準備状況チェックの実行とカスタム コードの調整によるシステム互換性の確保が含まれます。SAP コンサルタントは、アップグレード中のリスクを軽減するためにデータ移行を検証するスキルを習得します。
トピック 5
  • SUM 手順の監視とトラブルシューティング: SAP コンサルタントは、SUM 手順中のログとエラー メッセージを監視するスキルを習得します。このプロアクティブなアプローチにより、問題を早期に特定し、アップグレード中のダウンタイムを最小限に抑えることができます。
トピック 6
  • SUM 準備部分を実行します。SUM 準備部分では、SAP コンサルタントを目指す人がシステムの前提条件を確認し、SAP 準備チェックを実行します。また、適応用のカスタム コードを準備して、変換プロセスのリスクを軽減する方法も学習します。

 

究極な準備用ガイドE_S4HCON2023認定試験SAP Certified Technology Specialist:https://jp.fast2test.com/E_S4HCON2023-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어