2023年10月最新のSAP E_S4HCON2023問題集で更新された78問あります [Q35-Q58]

Share

2023年10月最新のSAP E_S4HCON2023問題集で更新された78問あります

PDF無料ダウンロードにはE_S4HCON2023有効な練習テスト問題

質問 # 35
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It explains the database migration option (DMO) of SUM.
  • B. It explains where to find information about the custom code analysis.
  • C. It is a database-specific document.
  • D. It contains a section about the simplification item (SI) checks.

正解:B、D


質問 # 36
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for running R3trans processes on the host of the primary application server
  • B. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • C. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • D. Check for running R31oad processes on the host of the primary application server

正解:A、C


質問 # 37
ICNV initialization does 3

  • A. Creation of views
  • B. Creation of flag
  • C. AA
  • D. Build index on flag column

正解:A、B、D


質問 # 38
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of user DDIC in the development client of the development system
  • B. Credentials of a named user in the development client of the development system
  • C. Credentials of user DDIC in client 000 of the shadow system
  • D. Credentials of a named user in client 000 of the shadow system

正解:B


質問 # 39
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It contains a section "free space requirements"
  • B. It is target release specific
  • C. It is a database-specific document
  • D. It contains a troubleshooting section

正解:A、B


質問 # 40
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. AA
  • B. An SAP S4HANA 1709 sandbox system
  • C. A Standalone SAP system with ABAP 7.51 or above

正解:B、C


質問 # 41
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. MIGRATE J5T_DUR_XML file from a previous run
  • B. Stack XML file calculated by the Maintenance Planner
  • C. Breakpoint configuration file SAPUPPHAS.BRK
  • D. Parameter file SAPup_add.par

正解:A、B


質問 # 42
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

  • A. Check the log files written in the SUM directory subdirectory abap. subdirectory log
  • B. Check the Charts Control Center in the SUM Ul
  • C. Check the dump size of the database export on disk.
  • D. Check logs for jobs starting with RSUPG_SGEN in the SAP system.

正解:A、C


質問 # 43
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

  • A. Custom code analysis
  • B. Software update
  • C. Database migration
  • D. Unicode conversion

正解:B、C


質問 # 44
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correctanswers to this question.
Response:

  • A. Check logs for jobs starting with "RSUPG_SGEN" in the system
  • B. Check the log files written under "SUM\abap\log"
  • C. Check the dump size of the database export on disk
  • D. Check the "Charts Control Center" in the SUM UI

正解:B、D


質問 # 45
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • D. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
    &UC) procedure.

正解:B


質問 # 46
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the activation
  • B. To optimize the conversion
  • C. To optimize the main import
  • D. To optimize the migration

正解:D


質問 # 47
Which of the following SUM activities require a stack XML file calculated by the maintenance planner?
Note: There are 3 correct answers to this question.

  • A. DMO without system update
  • B. SAP S/4HANA conversion without DMO
  • C. Benchmark tool
  • D. Prerequisite check
  • E. SAP S/4HANA conversion including DMO

正解:B、D、E


質問 # 48
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • B. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • C. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • D. After the SUM roadmap step "Execution" is finished and before "Postprocessing"

正解:B


質問 # 49
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It does NOT perform any table comparison.
  • B. It performs a comparison of all tables using check sum.
  • C. It performs a comparison on selected tables using check sum.
  • D. It performs a comparison on all tables using row counts.

正解:D


質問 # 50
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. A change of the database type is performed, without changing the software components.
  • B. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • C. An SAP S/4HANA conversion is performed, without adapting the customer data.
  • D. An upgrade of the software components is performed, without changing the database type.

正解:A


質問 # 51
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
  • D. You need to build up a SI check framework by applying SAP notes.

正解:A、D


質問 # 52
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In Process Control Center
  • B. In SUM Phaselist
  • C. In SUM Parameters
  • D. In DMO Migration Preparation

正解:A、C


質問 # 53
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • B. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • C. Shadow repository creation (EU_IMPORT*)
  • D. ParaUel distribution (PARDIST_SHD)

正解:A


質問 # 54
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport between Unicode and non-Unicode systems is forbidden.
  • B. The upgrade of the PRD must be finished before you start new development in the DEV.
  • C. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
  • D. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.

正解:C


質問 # 55
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

  • A. When performing an SAP S/4HANA conversion without u DMO
  • B. When upgrading an SAP S/4HANA Server system
  • C. When upgrading an SAP ECC system with DMO
  • D. When performing an SAP S/4HANA conversion with DMO

正解:B、C


質問 # 56
You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?

  • A. At the end
  • B. As part of the cleanup process
  • C. Before the downtime starts
  • D. Early in the downtime

正解:A


質問 # 57
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The start of the Execution roadmap step
  • B. The start of the business downtime
  • C. The end of the business downtime
  • D. The end of the database migration

正解:C


質問 # 58
......

E_S4HCON2023テストエンジンお試しセット、E_S4HCON2023問題集PDF:https://jp.fast2test.com/E_S4HCON2023-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어