質問 226
On larger projects, a vendor may occasionally proceed upon receipt of the:
- A. NDA.
- B. RFI.
- C. LOI.
- D. ROE.
正解: C
質問 227
Which of the following job roles is primarily tasked with communicating the project timeline changes?
- A. Project manager
- B. Project sponsor
- C. Project scheduler
- D. Project coordinator
正解: A
解説:
References: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 93
質問 228
A PM has a complex project that requires coordination among numerous stakeholders. Which of the following is the MOST appropriate type of meeting for the stakeholders to hold?
- A. One-on-one
- B. Virtual
- C. In-person
- D. Impromptu
正解: B
質問 229
Based on the table below:
Which of the following is the critical path if Task B has extended to ten days?
- A. 26 days
- B. 23 days
- C. 21 days
- D. 24 days
正解: A
質問 230
A project manager has been assigned a complex project and does not know all the activities required to complete it.
Which of the following if the BEST approach to determine the work packages for the WBS?
- A. Brainstorming
- B. Analogous
- C. Bottom-up
- D. Forward pass
正解: C
解説:
Explanation/Reference:
質問 231
A project manager is unsure if the quality of a deliverable from a SME meets specifications.
Which of the following is the BEST way for the project manager to address the issue?
- A. Send a project team meeting to obtain feedback from everyone.
- B. Send an email outlining the concerns to the team member.
- C. Post the issue on the wiki page for input from stakeholders.
- D. Conduct a face-to-face or telephone meeting with the team member.
正解: D
解説:
References:
Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 261
質問 232
A project sponsor decides to cut the project budget and reduce the scope. As a mitigation plan, the team decides to promote the project internally to gain support from other areas.
Which of the following describes the BEST combination of communication methods that can be used to attract more people?
- A. Instant messaging, kickoff meeting, and town hall meetings
- B. Text messaging, instant messaging, and meetings
- C. Gate reviews, face-to-face meetings, and kickoff meeting
- D. Social media, email, and printed media
正解: C
質問 233
Given the table below for a house construction project:
The table above is an example of which of the following project artifacts?
- A. RBS
- B. SOW
- C. WBS
- D. RTM
- E. Project plan
- F. Status report
正解: C
質問 234
A company hires an outside vendor to provide 24/7 support.
Which of the following documents would determine the contractual obligations?
- A. PO
- B. LOI
- C. MOU
- D. SLA
正解: D
解説:
References: Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 303
質問 235
A team lead informs the project manager that the datacenter will not be accessible when the project needs to be completed. The team lead also indicates that the team member who is assigned to complete the datacenter project is out on medical leave.
Which of the following should a project manager update to document this information?
- A. A document describing agreed-upon communication methods
- B. A list of decomposed activities
- C. A sequenced list of project tasks
- D. A list of realized risks
正解: D
質問 236
A project sponsor and Chief Information Officer (CIO) disagree about how to release the final deliverables to the market The sponsor wants to do a massive product release, while the CIO wants to be extremely cautious and add more time for testing and defect resolution. The project manager works with both parties and determines the best solution is to roll the product out in a pilot release to see how it tests, and then use customer feedback to determine next steps Which of the following conflict resolution techniques is the project manager using?
- A. Avoiding
- B. Compromising
- C. Negotiating
- D. Forcing
正解: D
質問 237
An authorized change to a construction project was implemented. During the modification, the team identified a defect in which the change caused the building power output to be outside the KPPs.
Which of the following actions should the project manager take?
- A. Initiate the regression plan.
- B. Add remediation to the schedule.
- C. Submit a new change request.
- D. Accept the new power output.
正解: A
解説:
References:
Kim Heldman, CompTIA Project+ Study Guide, 2nd Edition, Sybex, Indianapolis, 2017, p. 294
質問 238
The project schedule performance index is 1.1, and the cost performance index is 0.9.
Which of the following describes the project status?
- A. Behind schedule and over budget
- B. Behind schedule and under budget
- C. Ahead of schedule and under budget
- D. Ahead of schedule and over budget
正解: C
質問 239
Based on the table below:
Which of the following is the total float for the critical path?
- A. 0
- B. 1
- C. 2
- D. 3
正解: C
質問 240
Which of the following tasks are responsibilities of the project manager role?
- A. Provide inputs, estimate tasks, and manage a team
- B. Manage the budget, perform quality assurance, and be accountable for artifacts
- C. Manage a team, marketing, roadblocks, and project steering
- D. Set deliverables, control risk, manage risk, and create a project charter
正解: A
解説:
Explanation
質問 241
......
2023年04月最新PK0-004試験問題集PDFと試験エンジン:https://jp.fast2test.com/PK0-004-premium-file.html
プレミアム良質なCompTIA PK0-004オンライン問題集:https://drive.google.com/open?id=1v3EASni-n4zDIH25NBbwHOpH_Ic13vVe