
1z0-996-22認証試験の問題集解答を提供しています [2022年11月]
更新された1z0-996-22試験練習テスト問題
Oracle 1z0-996-22 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
質問 39
Which entity defines the type of collection process to start based on age of debt, amount of debt, and type of customer?
- A. Debt Class
- B. Collection Class Control
- C. Customer Class
- D. Collection Class
- E. Collection Process Template
正解: A
質問 40
At what stage in the initial measurement data (IMD) import process will the application of meter multipliers be performed?
- A. post-VEE
- B. Critical Validation
- C. VEE
- D. Prepare for VEE
正解: B
質問 41
The base package usage transaction business object is represented by D2-UsageTransaction. The usage calculation engine or process drives the specifics of the usage to be calculated on this business object.
Based on this, which three configuration areas will have an impact on the usage calculation process? (Choose three.)
- A. TOU map
- B. Factor Override
- C. Usage Rule
- D. VEE rule
正解: A,B,C
質問 42
Which three statements are true about initial measurements, final measurements, and usage? (Choose three.)
- A. Final measurements can be directly edited or updated by users or by automated processes as required.
- B. Usage is loaded in the application to generate final measurements.
- C. Usage is a synonym for bill determinants.
- D. The initial measurement data can be optionally stored in Raw format.
- E. A service point can have more than one initial measurement for the same period, but only one final measurement.
正解: A,B,E
質問 43
Approval Profiles control which aspects of an Adjustment?
- A. information defaulted on an Adjustment
- B. whether the adjustment should appear on the customer's next bill
- C. control how adjustments are approved
- D. whether current and/or payoff balance are affected by the adjustment
- E. if an adjustment requires approval before it's frozen
正解: D
解説:
Reference:
%20Adjustment%20Approval.pdf
質問 44
Within the application, operational devices can be assets or components.
Which two statements are true about components? (Choose two.)
- A. Components can't have specifications.
- B. Components are attached to assets.
- C. Components can be installed at locations.
- D. Components are not a class of assets.
- E. Components have a disposition that tracks their location and status.
正解: B,C
質問 45
As part of the service order processing, the algorithm D1-CNSPINSDV (Connect SP and/or Install Device) determines if a specific activity needs to be created based on the state of the service point.
Based on the status of the service point, what can this algorithm create?
- A. Device
- B. Device Configuration
- C. Service Point
- D. Smart Meter Command
正解: C
質問 46
Which two are "Are SP and Device Ready?" state algorithms for Enable Service? (Choose two.)
- A. Create Service Point
- B. Customer Device Compatibility Check
- C. Check for Measurement
- D. Start Service Agreement
- E. Create Usage Subscription
正解: B,C
質問 47
Which statement correctly describes the relation between a device and a measuring component?
- A. A device can have any combination of interval and/or scalar measuring components.
- B. Two measuring components on the same device should have the same Units of Measure (UOM).
- C. A device should have only one measuring component type.
- D. A device configuration links a device only to interval channels.
正解: A
質問 48
When a customer has a specific price for a defined quantity which is different to other customers, where is this specific price for the related Bill Factor defined?
- A. Service Agreement - Contract Value
- B. Bill Factor Value
- C. Account Characteristic
- D. Bill Factor Characteristic
- E. Calculation Rule
正解: A
質問 49
Which three initial measurement data (IMD) exception categories are available when you execute VEE rules?
(Choose three.)
- A. Complete
- B. Information
- C. Terminate
- D. Low
- E. Issue
正解: B,C,E
質問 50
Using a base-supplied algorithm type, what is payment distribution priority typically determined by?
- A. Customer Class and Service Agreement Type
- B. Debt Age
- C. Payment Type + Debt Age
- D. Customer Class and Debt Age
- E. Service Agreement Type's Priority and Debt Age
正解: D
質問 51
On which three entities can proration be disabled? (Choose three.)
- A. Rate Schedule
- B. Bill Factor
- C. Rate Version Calculation Group
- D. Calculation Rule Business Object
- E. Calculation Rule
正解: A,C,D
質問 52
What happens when a device's measuring components are reconfigured (a new measuring component will be read) at a service point?
- A. A new installation event is created to "install" (new device configuration).
- B. The original installation event is updated with the "removal" (expire old device configuration) and a new installation event is created to "install" (new device configuration).
- C. The original installation event is updated with the "removal" (expire old device configuration).
- D. A device with a new configuration type is created.
- E. A device with a new configuration type is created. Moreover, a new installation event is created to 'install" (new device configuration).
正解: B
質問 53
How many service agreements are linked to a severance process?
- A. any number defined by the business user
- B. all service agreements that are connected to the initiating collection process
- C. one
- D. zero - accounts are linked to severance processes
- E. all service agreements that are connected to the initiating overdue process
正解: A
質問 54
Which option correctly describes the high-level process from loading measurements through calculating usage?
- A. 1. Load Initial Measurements
2. Validate, edit, and estimate Initial Measurements
3. Create Final Measurements
4. Calculate Usage - B. 1. Load Initial Measurements
2. Validate, edit, and estimate Initial Measurements
3. Create Final Measurements
4. Update Initial Measurements - C. 1. Load Initial Measurements
2. Validate, evaluate, and estimate Initial Measurements
3. Update Initial Measurements
4. Calculate Usage - D. 1. Load Initial Measurements
2. Verify, evaluate, and enter Initial Measurements
3. Create Final Measurements
4. Calculate Usage
正解: D
質問 55
Which statement supports usage transaction calculation?
- A. Bill determinants are derived from the initial measurement data of the measuring components installed at the usage subscription's devices during the calculation period.
- B. Bill determinants are derived from the final measurements for only interval measuring components or devices installed at the usage subscription's service points during the calculation period.
- C. Bill determinants are derived from the final measurements of the measuring components or devices installed at the usage subscription's service points during the calculation period.
- D. Bill determinants are derived from the initial measurement data of the measuring components devices installed at the usage subscription's service points during calculation period.
正解: C
質問 56
How should you configure the derived values that are relevant for a device?
- A. Configure the derived values on the Device Type for the derived values to be defined on the device.
- B. Configure the derived values on the Measuring Component for the measuring components to be defined on the device.
- C. Configure the derived values on the Measuring Component Type for the measuring components to be defined on the device.
- D. Configure the derived values on the Final Measurement Type for the measuring components to be defined on the device.
正解: D
質問 57
......
検証済みの1z0-996-22問題集と解答を使って100%一発合格保証で更新された問題集:https://drive.google.com/open?id=1imNFkwzJZ5kGqLdsB71iMxcjei53WM4M
合格させるOracle Utilities Customer Cloud 1z0-996-22試験には72問があります:https://jp.fast2test.com/1z0-996-22-premium-file.html