NCSE-Coreブレーン問題集PDF、Nutanix NCSE-Core試験問題豪華お試しセット [Q81-Q101]

Share

NCSE-Coreブレーン問題集PDF、Nutanix NCSE-Core試験問題豪華お試しセット

2024年最新されたNCSE-Coreサンプル問題は信頼され続けるNCSE-Coreテストエンジン


Nutanix NCSE-CORE認定は、IT業界で非常に評価されており、世界中の多くの組織によって認識されています。この認定は、Nutanixソリューションを効果的に設計、展開、管理するために必要なスキルと知識を個人に提供します。この認定は、個人に雇用市場で競争上の優位性を提供し、キャリアの見通しを強化します。 Nutanix NCSE-CORE認定は、スキルを向上させ、Nutanixインフラストラクチャの分野でキャリアを促進したいIT専門家にとって優れた投資です。

 

質問 # 81
An administrator is managing multiple Windows and Linux VMs connected to Nutanix Volumes. The Linux VMs are experiencing intermittent connectivity issue. The Windows VMs do not experience the same issue.
Which option should the administrator use to resolve this issue?

  • A. Add additional disks to the Volume Group
  • B. Set the SCSI timeout value to 60
  • C. Utilize Jumbo Frames
  • D. Utilize a separate subnet for the Linux VMs

正解:B


質問 # 82
A prospect uses VMware, Oracle and Microsoft products for their critical operations. The prospect prefers an all-flash array because they have significantly invested in servers for their oracle environment to save on licensing costs.
Which feature should be discussed to address this objection?

  • A. All-flash nodes.
  • B. ABS
  • C. Hyper-V Support.
  • D. AHV

正解:B


質問 # 83
During a meeting with a fortune 100 prospect, an SE achieves technical buy-in from the architecture team. The prospect shares that their management recently attended an executive briefing with Cisco and was impressed by the vision presented.
Management is pushing the arching the architecture tea to adopt Cisco as their HCI standard based on a beief that Nutanix is not a major player.
Which resource should an SE highlight?

  • A. Reference architectures
  • B. ESG Performance Analysis
  • C. Net Promoter Score
  • D. Garther magic Quadrant

正解:D


質問 # 84
An 8-node hybrid cluster is configured with a Fault Tolerance level of 2 (RF3). All nodes are identical. Which simultaneous failures will result in VM data being unavailable?

  • A. CVM being powered off on one node and two HDD failures on another node.
  • B. Single SSD failure on one node and a single SSD failure on another node
  • C. Two HDD failures on one node and a single SSD failure on another node
  • D. SSD failures on two nodes and a CVM powered off on another.

正解:D

解説:
In an 8-node hybrid cluster configured with a Fault Tolerance level of 2 (RF3), the system can tolerate up to two simultaneous failures. However, if there are SSD failures on two different nodes and a CVM is powered off on another node simultaneously, the data availability is compromised. This combination results in losing the quorum necessary for maintaining data availability and integrity, leading to VM data becoming unavailable.
References:
* Nutanix Bible


質問 # 85
Refer to the exhibit.

Using the Sizing Options shown, which two configurations are valid when using Sizer in Automatic mode?(Choose two.)

  • A. 6x NX-8150-G5 (4x 1920GB SSD + 20x 2TB HDD per node)
  • B. 6x NX-3060-G6 (6x 1920GB SSDs per node)
  • C. 4x NX-1065-G5 (3x 3840GB SSDs per node) + 4x NX-6035CG5(6x3840GB SSD per node)
  • D. 3x NX-3060-G5 (2x 1920GB SSD per node) + 3x NX-3055G (4x960GBSSD per node)
  • E. 6x NX-165S-G5 (3x 48GB SSD per node)

正解:A、B

解説:
A: 6x NX-3060-G6 (6x 1920GB SSDs per node):
* This configuration is valid in Automatic mode as it meets the criteria for SSD storage and node count.
C: 6x NX-8150-G5 (4x 1920GB SSD + 20x 2TB HDD per node):
* This configuration is also valid as it includes a mix of SSDs and HDDs, fitting the requirements for hybrid storage configurations in Automatic mode.
References:
* The Nutanix Sizer tool's automatic mode settings ensure that configurations meet performance and capacity requirements while adhering to the specified storage and node configurations.


質問 # 86
A customer asks for a quote for a hybrid cluster to run general purpose VMs and an ERP application. The customer has a vSAN ReadyNode quote already and is looking for a comparable Nutanix solution. They share the following bill of materials: 3 Hosts , 2x E5-2640v4 CPUs , 512GB RAM , 1 x 480GB SSD , 2 x 8TB HDD
, 2 x 1GB NIC What are two reasons to avoid sizing to match a competitor's bill of materials ? (Choose two)

  • A. The assumptions made in the competitor's sizing cannot be determined.
  • B. Sizing data from the competition was shared.
  • C. Nutanix Collector is better at capturing the metrics needed
  • D. There is no visibility to the actual customer requirement

正解:A、D


質問 # 87
A customer needs to image nodes that are either bare metal or require a different hypervisor. Which Nutanix tool should be used?

  • A. Foundation
  • B. Prism Central
  • C. Move
  • D. Era

正解:A


質問 # 88
An administrator finds that home shares cannot be configured in a new Files 3.5 deployment.
Why is this happening?

  • A. NFS default access is set to Read Only
  • B. Multi-protocol access is not configured.
  • C. Access Based Enumeration is not enabled.
  • D. The system is deployed as a single FSVM.

正解:D


質問 # 89
Which two targets are valid options when selecting a remote site to Prism? (Choose Two)

  • A. XI Cloud Services
  • B. Physical Cluster
  • C. Tape Library
  • D. Cloud
  • E. Network attached storage

正解:A、B

解説:
When selecting a remote site to Prism, the valid targets include:
* XI Cloud Services: This allows integration with Nutanix's cloud services for remote management and disaster recovery.
* Physical Cluster: This option enables management and failover to another physical Nutanix cluster, ensuring high availability and business continuity.


質問 # 90
An administrator needs to make sure an RF2 cluster can survive a complete rack failure without negatively effecting workload performance. The current cluster configuration consists of the following:
* 30 nodes: distributed 10 nodes per rack across three 42U rack
* Each nodes is configured with 40TB usable storage all flash (Cluster Total 1.2 PB Usable)
* Current cluster utilization is 900TB storage
Which configuration changes should be made to make sure that the cluster meets the requirements?

  • A. Expanse the cluster by adding 9 nodes to a new 42U rack
  • B. Expanse the cluster by adding 8 nodes to a new 42U rack
  • C. Expanse the cluster by adding 2 additional nodes per rack, 6 nodes total.
  • D. Expanse the cluster by adding 3 additional nodes per rack, 9 nodes total.

正解:A


質問 # 91
An existing customer wants to upgrade their non-AHV hypervisor to the most recent version. The customer needs confirm that the hypervisor is supported on their AOS version. Where on the Support Portal is this information located?

  • A. Upgrade Paths
  • B. Field Advisories
  • C. EOL, Information
  • D. Compatibility Matrix

正解:A


質問 # 92
A customer is provisioning 1,000 linked clone desktops with View Composer for their call center. During a short period between shift changes,desktops must be rebooted.
Which Nutanix feature will help to mitigate the desktop boot times?

  • A. Content Based Read Cache
  • B. Performance Tier De-duplication
  • C. Shadow Clones
  • D. View Acceleration Array Intergration''

正解:C

解説:
Shadow Clones:
* Shadow Clones are a Nutanix feature designed to enhance performance for read-heavy workloads like VDI during peak operations such as boot storms.
* This feature ensures that frequently accessed data is available locally on all nodes, significantly reducing latency and improving read performance during boot operations.
Implementation Benefits:
* Minimizes the boot time for linked clone desktops during shift changes.
* Enhances overall user experience by reducing the I/O bottleneck during mass reboots


質問 # 93
What are two things that the ADS service does for VMs within AHV? (Choose two.)

  • A. Re-balance powered-on VMs evenly throughout the cluster
  • B. Balance VMs throughout the Cluster when the VM is first powered on
  • C. Invoke workload movement when there is no contention of resource
  • D. Invoke workload movement if there is contention of resources.

正解:B、C


質問 # 94
An SE builds a Sizer scenario for SQL server running on Cisco C240 M4 servers.
Using only the Sizer BOM, which two actions can be performed? (Choose two)

  • A. Review budgetary pricing.
  • B. Review workload sizing details.
  • C. Reference the HCL for additional SKU's relevant to the configuration.
  • D. Build a complete BOM in Cisco commerce Workspace (CCW)

正解:B、C


質問 # 95
How should an administrator correct an SSL error when connecting to a Nutanix cluster?

  • A. Create a new self-signed certificate for the cluster with a 4096 bit key
  • B. Add the SSL certificate to the workstation's trusted people store
  • C. Create a new SSL certificate for the cluster signed by an AD certificate authority
  • D. Add the SSL certificate to an AD group policy applied to all computer objects

正解:C


質問 # 96
A prospect's business is growing 100% year over year. The prospect is interested in Nutanix for their main datacenter due to the alility to scale quickly and easily. They have three remote sites that will be refreshed within the next year. Each site needs to replicate to their many datacenter. The SE proposes the Nutanix NX line, and the prospect asks to utilize the Xpress line.
For which reason is the Xpress line the wrong choice? (Choose two)

  • A. SX is limited to two 4-node clusters.
  • B. SX licensing will not support many-to-many- cluster replication
  • C. SX licensing does not support cluster-to-cluster replication
  • D. SX has a lower services cost for installation.
  • E. SX is limited to one 4-node cluster.

正解:A、B


質問 # 97
A prospective customer wants to refresh their current on-premises infrastructure that. consists of 4 ESXi hosts. each with 20 cores and 512GB of RAM, and 1.2PB of usable SAN storage They have recently renewed their ESXi licensing, and all data must remain within their physical network. They are concerned that a hyperconverged solution will not meet their storage requirements without requiring a significant increase in the number of required ESXi hosts and licenses. Which Nutanix capability should the systems engineer review with the customer?

  • A. Build Cluster on a public cloud
  • B. Use Volumes to provide storage
  • C. Position storage-only nodes
  • D. Replace the hypervisor with AHV

正解:B


質問 # 98
An SE is using the output from RVTools to size the storage capacity for a Nutanix Cluster.
Which value most closely resembles the minimum required storage capacity that should be entered for the aggregate workload in sizer?

  • A. 37 TB
  • B. 39 TB
  • C. 24 TB
  • D. 15 TB.

正解:A

解説:
* Understanding RVTools Output:
* RVTools provides detailed information on the storage usage of virtual machines, including provisioned, used, and free space.
* Determining Storage Requirements:
* Aggregate Workload Sizing: The SE must consider the total storage requirements, including current usage and future growth, to ensure the Nutanix Cluster can handle the workload.
* Value Selection:
* 15 TB: Likely insufficient for a sizable environment.
* 24 TB: More significant but may still be insufficient for larger deployments.
* 37 TB: Appears to be a reasonable estimate for a substantial workload, considering both current usage and future growth.
* 39 TB: Very close but slightly overestimated compared to typical recommendations.
* Conclusion:
* The most accurate representation of the minimum required storage capacity for the aggregate workload in sizer is37 TB.
References:
* Nutanix Sizing Guidelines.
* RVTools Documentation.


質問 # 99
A systems engineer is building a private cloud for internal developers that should include self-service and life cycle management for both kubernetes containers and SQL databases. which additional license feature must be purchased to provide this capability?

  • A. Nutanix Era
  • B. Prism Pro
  • C. Nutanix Beam
  • D. Nutanix Flow

正解:B


質問 # 100
A prospect has 8500GB of capacity provisioned for a non-production VMware cluster. As Part of migrating to Nutanix. the prospect agrees to convert any thick provisioned disks to thin provisioned disks. Based on additional data. the total active working set for the cluster has been datermined to be 1TB. When entering the Raw input workload into Sizer, what is the minimum amount of HDD Capacity required for the workload? ??

  • A. 4.0TiB
  • B. 3.0TiB
  • C. 3.5TiB
  • D. 7.5TIB

正解:B

解説:
To determine the minimum amount of HDD capacity required for the workload after converting thick provisioned disks to thin provisioned disks, we need to consider the active working set and the typical overhead for thin provisioning.
* Current Capacity:
* The prospect currently has 8500GB (8.5TiB) of provisioned capacity.
* Active Working Set:
* The total active working set for the cluster is determined to be 1TB.
* Thin Provisioning:
* Thin provisioning reduces the need for physical storage because it allocates storage on-demand rather than reserving the full capacity upfront.
* Nutanix typically advises planning for additional overhead to accommodate metadata, snapshots, and potential growth.
* Calculation:
* The rule of thumb for thin provisioning overhead is approximately 2-3 times the active working set to ensure adequate capacity for metadata and additional data growth.
Using the higher end of the multiplier (3 times):
1TB (active working set)×3=3TB1 \text{TB (active working set)} \times 3 = 3
\text{TB}1TB (active working set)×3=3TB
* Conclusion:
* Therefore, the minimum HDD capacity required for the workload when thin provisioning is applied would be around 3.0TiB.
References:
* Nutanix Sizing Guidelines.
* Nutanix Documentation on Thin Provisioning and Storage Optimization.


質問 # 101
......

無料お試しNutanix NCSE-Core問題集PDFは必ずベストの問題集オプションを使おう:https://jp.fast2test.com/NCSE-Core-premium-file.html

NCSE-Core試験資料Nutanix学習ガイド:https://drive.google.com/open?id=1mfmayRAf37A8Gve7wVwHTb6aopK-HRvs


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어