最新 [2024年12月06日] リアルNutanix NCSE-Core試験問題集解答 [Q45-Q65]

Share

最新 [2024年12月06日] リアルNutanix NCSE-Core試験問題集解答

NCSE-Core問題集を使って一日でNutanix SE Academy試験合格(最新の198解答)

質問 # 45
What is the main function of Oplog?

  • A. A persistent write buffer to coalesce bursts of random writes before destaging to the extend store
  • B. A persistent write buffer to coalesce all writes before destaging to the extent store
  • C. A memory cache to coalesce all writes before destaging to the extent store
  • D. A memory cache to coalesce bursts of random writes before destaging to the extent store

正解:A

解説:
The main function of Oplog in Nutanix is to act as a persistent write buffer to coalesce bursts of random writes before they are destaged to the extent store. This mechanism improves write performance and reduces latency by temporarily storing write operations in a fast, dedicated buffer before committing them to the slower, persistent storage.


質問 # 46
How should an administrator correct an SSL error when connecting to a Nutanix cluster?

  • A. Add the SSL certificate to the workstation's trusted people store
  • B. Create a new self-signed certificate for the cluster with a 4096 bit key
  • C. Add the SSL certificate to an AD group policy applied to all computer objects
  • D. Create a new SSL certificate for the cluster signed by an AD certificate authority

正解:D


質問 # 47
A customer wants to evaluate the performance impact of failing a node while running workloads on the cluster. Which tool should a systems engineer use to accomplish this task?

  • A. Sizer
  • B. X-Ray
  • C. Move
  • D. demo.Nutanix.com

正解:B


質問 # 48
A systems engineer sizers an environment based on the customer's requirement of N+2 resiliency for the entire cluster. In which two ways could the configuration be changed to meet the customer's requirements ? (Choose Two)

  • A. Increase the SSD capacity per Node
  • B. Increase the CPU capacity per Node
  • C. Increase the number of Nodes
  • D. Increase the RAM capacity per Node

正解:A、D


質問 # 49
In a competitive POC scenario, the prospect is testing Nutanix against VxRail and Hyperflex. The customer is interested in an ""All in One"" solution that's simple to deploy, manage, and grow.
Which two test plan items should the SE map to POC success criteria?
(Choose two)

  • A. Expand the cluster by adding an additional node.
  • B. Use a single interface to manage and monitor the full stack.
  • C. Enable all data efficiency settings.
  • D. Deploy HCIbench to determine maximum IOPS.
  • E. Deploy Calm to automate application deployment.

正解:A、B

解説:
C: Expand the cluster by adding an additional node:
* Demonstrating the ease of expanding the Nutanix cluster by adding an additional node showcases the scalability and simplicity of Nutanix's hyperconverged infrastructure. This is a critical success criterion for customers looking for a solution that can grow with their needs.
D: Use a single interface to manage and monitor the full stack:
* One of Nutanix's key advantages is the ability to manage and monitor the entire infrastructure stack from a single interface, Prism. This feature simplifies management and reduces operational overhead, which aligns with the customer's requirement for an "All in One" solution.


質問 # 50
In addition to the total number of physical CPU cores, which hardware component is used to calculate the cost of Capacity Based Licensing for a Nutanix Cluster?

  • A. RAM (in TiB)
  • B. RAW total storage (in TiB)
  • C. RAW SSD storage (in TiB)
  • D. RAW HDD storage (in TiB)

正解:B

解説:
In addition to the total number of physical CPU cores, the cost of Capacity Based Licensing for a Nutanix Cluster is calculated using the RAW total storage in TiB. This approach ensures that both computational and storage resources are accounted for when determining the licensing costs.
* Physical CPU Cores: The number of physical CPU cores is the primary factor in the licensing cost calculation.
* Raw Total Storage: This includes the total raw capacity of all storage devices (both SSDs and HDDs) present in the cluster, measured in tebibytes (TiB).
References:
* Nutanix Licensing Guide: Details the parameters considered for capacity-based licensing.
* Nutanix Community and Support Documentation: Provides insights into licensing models and their components.


質問 # 51
A System engineer (SE) is gathering requirements to size a hybrid cluster to replace a prospect's existing IT test and development environment. The prospective customer has indicated the cluster contains no business critical applications and has provided the aggregate vCPU and RAM requirements of the existing cluster. which two additional items does the SE require to size the cluster?(Choose two)

  • A. Storage Capacity
  • B. Existing Drive Count
  • C. Virtual Switch Configuration
  • D. Working Data Set

正解:A、D


質問 # 52
Which two targets are valid options when selecting a remote site to Prism? (Choose Two)

  • A. XI Cloud Services
  • B. Cloud
  • C. Network attached storage
  • D. Physical Cluster
  • E. Tape Library

正解:A、D

解説:
When selecting a remote site to Prism, the valid targets include:
* XI Cloud Services: This allows integration with Nutanix's cloud services for remote management and disaster recovery.
* Physical Cluster: This option enables management and failover to another physical Nutanix cluster, ensuring high availability and business continuity.


質問 # 53
Which method can be used to migrate a VM configured for UEFI-boot from a Nutanix Hyper-V cluster to AHV?

  • A. Storage vMotion
  • B. Nutanix Move
  • C. Cloud Connect
  • D. Live Migration

正解:B

解説:
To migrate a VM configured for UEFI-boot from a Nutanix Hyper-V cluster to AHV, the recommended method is to use Nutanix Move. Nutanix Move is a migration tool designed to streamline the process of moving VMs between different hypervisors, including from Hyper-V to AHV. It supports UEFI-boot VMs and ensures that the VM's configuration and data are migrated efficiently and with minimal downtime.
References:
* Nutanix Move Documentation
* Nutanix Community Edition Getting Started Guide


質問 # 54
An existing customer wants to upgrade their non MW hypervisor to the most recent version The customer needs to confirm thee the hypervesor is supported on their AOS version.
Where on the Support Portal is this information located?

  • A. Field Advisories
  • B. Upgrade Paths
  • C. EOL information
  • D. Compauboty matrix

正解:D


質問 # 55
A prospective customer is evaluating solutions to support a project. The systems engineer proposes a hybrid model as recommended by Sizer. The prospect is concerned about the performance of a hybrid configuration and is evaluating an all flash array. Which two Nutanix features should be discussed to address the concerns of the prospective customer? (Choose two)

  • A. Data Locality
  • B. AHV Turbo Mode
  • C. Automatic Data Tiering
  • D. Acropolis Dynamic Scheduler

正解:B、C


質問 # 56
An administrator has been alerted to a VM that has high I/O latency and wants to determine if there are any other factors, such as insufficient network or memory resources that correlate, as part of a troubleshooting process.
Which type of chart should the administrator create to allow all relevant data to be easily exported to CSV for later analysis?

  • A. A VM entity chart with each of the relevant metrics.
  • B. A cluster entity chart with each of the relevant metrics
  • C. A VM metric chart for each of the relevant metrics
  • D. A cluster metric chart for each of the relevant metrics

正解:A

解説:
To troubleshoot high I/O latency and correlate it with other potential resource issues, such as network or memory constraints, the administrator should create a VM entity chart. This type of chart allows for:
* Inclusion of Multiple Metrics:
* The VM entity chart can incorporate various relevant metrics such as I/O latency, CPU usage, memory usage, and network throughput, providing a comprehensive view of the VM's performance.
* Ease of Data Export:
* The chart can be easily exported to CSV format, facilitating detailed offline analysis. This is essential for correlating different metrics over the same time period and identifying patterns or anomalies that could explain the high I/O latency.
By using a VM entity chart, the administrator ensures that all pertinent data is collected and can be analyzed together, providing a holistic view of the VM's performance and aiding in pinpointing the root cause of the latency issue.
References:
* Nutanix Prism Central User Guide
* Nutanix Documentation on Performance Monitoring


質問 # 57
A customer performs a 1-click, non-disruptive upgrade on a 3-node Nutanix cluster. While the CVM on Node A is rebooting, a VM on Node A overwrites an existing block of data. How does Nutanix AOS ensure data integrity during the upgrade?

  • A. AOS writes two copies across the remaining nodes to maintain resiliency
  • B. AOS leverages Erasure Coding to maintain resiliency.
  • C. AOS only overwrite the available copy and waits until the original copy is back online before restoring resiliency
  • D. AOS marks the replica as read only and waits until the original replica is back online to prevent corruption.

正解:A

解説:
During a 1-click, non-disruptive upgrade on a 3-node Nutanix cluster, if a VM on Node A overwrites an existing block of data while the CVM on Node A is rebooting, Nutanix AOS ensures data integrity by writing two copies of the data across the remaining nodes. This approach maintains data resiliency by ensuring that multiple copies of the data are available even when one of the nodes is temporarily unavailable.


質問 # 58
An administrator is auditing the recent alerts on the cluster to report to the management.
Which dashboard in Prism Central can be used to generate this report?

  • A. Apps
  • B. Analysis
  • C. Alerts
  • D. Explore

正解:C


質問 # 59
A prospective customer's migration to their new SAN started six months ago and is sill not complete. The VP of IT state the previous migration to the existing SAN took almost eight months to complete. How should the systems engineer describe Nutanix hardware refreshes to this prospective customer

  • A. New nodes can be added to an existing cluster. and then the old nodes can be removed.
  • B. With AHV, vMotion between cluster occurs faster than on a SAN-based cluster
  • C. Manual hardware refreshes take time, and the systems engineer understands the customer's current situation.
  • D. Setting in AHV node's EVC mode is a very fast process that will shorten the upgrade time

正解:A


質問 # 60
Which option should be recommended for a customer to get timely notification of significant product issues in the field.

  • A. Register for Field Advisories email notifications.
  • B. Visit the portal.nutanix.com website > Documentation tab > Security Advisories.
  • C. Open Prism Element > Gear Icon Menu > Field Advisories.
  • D. Visit the Nutanix.com website.

正解:A


質問 # 61
A systems engineer is creating a workload for a Sizer Scenario that requires Disaster Recovery (DR) resources with a Recovery Point Objective (RPO) of 6 hours. The "Protect VMs and other Entities" setting is set to Yes. Async is selected for the RPO. Which two other options must be enabled to have Sizer create a DR cluster? (Choose two)

  • A. Disaster Recovery
  • B. Remote Snapshot
  • C. NearSync
  • D. Backup

正解:A、B


質問 # 62
Using the Sizing Option shown, which two configurations are possible configurations that Sizer could provide in Automatic mode? (Choose two) ????

  • A. 3x NX-3060-G7 (2x 1920GB SSDs per node) + 3x NX-10755-G7 (4x 3.84TB SSDs per node)
  • B. 6x NX-3060-G7 (6x 1920GB SSDs per node)
  • C. 4x NX-1075S-G7 (4x 3.85TB SSDs per node) + 4x NX-8035-G7 (6x 3.84TB SSD per node)
  • D. 6x NX-8055-G7 (2 x 7.68TB SSD + 10x 6TB HDD per node)

正解:A、B


質問 # 63
Which AOS feature provides enhanced read performance specifically for virtual desktop environments?

  • A. Time Stream
  • B. Copy on First Write
  • C. Data Locality
  • D. Shadow Clones

正解:D


質問 # 64
A prospective customer has a requirement for Data-at-Rest-Encryption for all their data.
Which two license options are available to address this requirement? (Choose two)

  • A. Pro
  • B. Ultimate
  • C. Pro with the Encryption SKU
  • D. Starter with the Encryption SKU

正解:B、C


質問 # 65
......


NCSE-Core認定試験は、Nutanixアーキテクチャやコンポーネント、クラスターの展開と管理、仮想化とネットワーキング、ストレージとデータサービス、管理とモニタリング、災害復旧などのトピックをカバーしています。試験は90分以内に60個の多肢選択問題を完了する必要があります。NCSE-Core認定を受けるには、500点中300点以上の合格点が必要です。

 

NCSE-Core試験正確な問題集で学習ノートと理論:https://jp.fast2test.com/NCSE-Core-premium-file.html

100% 高得点合格保証NCSE-Core無制限198解答:https://drive.google.com/open?id=1mfmayRAf37A8Gve7wVwHTb6aopK-HRvs


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어