C_TS422_1909練習テスト問題は更新された91問題あります [Q46-Q68]

Share

C_TS422_1909練習テスト問題は更新された91問題あります

SAP C_TS422_1909問題集で一発合格できる問題を試そう!


SAP C_TS422_1909 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Select and apply planning strategies, use the planning table
  • Advanced Planning in SAP S
  • 4HANA
トピック 2
  • Introduction to SAP S
  • 4HANA Supply Chain Planning
  • Material Requirements Planning in SAP S
  • 4HANA
トピック 3
  • Identify repetitive manufacturing specific master data
  • Apply material staging and confirmation
トピック 4
  • Explain line load planning and confirmation
  • outline the capabilities of embedded analytics
トピック 5
  • Outline best practices for using SAP S
  • 4HANA
  • Production Orders in SAP S
  • 4HANA
トピック 6
  • Differentiate consumption-based planning vs. MRP, outline new trends in production planning
  • Configure availability check for components
トピック 7
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Identify and explain production relevant master data
トピック 8
  • Outline both motivation and background of SAP S
  • 4HANA
  • Determine BOM item category
  • Describe order status management and set user statuses

 

質問 46
Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:

  • A. Backorder processing
  • B. Capacity planning
  • C. Demand planning
  • D. Supply Network Planning
  • E. Available-to-promise

正解: A,B,E

 

質問 47
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?

  • A. Use the reorder point.
  • B. Use the MRP type for vendor managed inventory.
  • C. Use the fixed lot size procedure.
  • D. Use the minimum order quantity.

正解: C

 

質問 48
Which reports can you access via the order and resource reporting transaction in advanced planning?
There are 3 correct answers to this question.
Response:

  • A. Planning file entries
  • B. WIP list
  • C. Production list
  • D. Operation list
  • E. Production overview

正解: B,D,E

 

質問 49
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:

  • A. MRP 4
  • B. Basic Data 1
  • C. Purchasing
  • D. Work Scheduling

正解: C,D

 

質問 50
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a positive offset time in the strategy profile.
  • B. Specify a negative planning horizon in the strategy profile.
  • C. Specify a negative offset time in the strategy profile.
  • D. Specify a positive planning horizon in the strategy profile.

正解: C

 

質問 51
What is the difference between co-products and by-products?

  • A. Only co-products can be manufactured in isolation from the main product.
  • B. Only co-products appear in the process or production order settlement rule.
  • C. Only by-products have a zero inventory valuation.
  • D. Only co-products are identified by a special item category in the bill of material (BOM).

正解: B

 

質問 52
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named
"W1904_1000_001". What does the suffix 001 in the resource name represent?
Please choose the correct answer.
Response:

  • A. Work center category
  • B. Number of individual capacities
  • C. Capacity category
  • D. Available capacity version

正解: C

 

質問 53
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the production version
  • B. In the production order type
  • C. In the MRP controller
  • D. In the routing
  • E. In the bill of materials (BOM)

正解: B,C,D

 

質問 54
Which of the following functions can be performed when the production order has the status "Created" (CRTD)?
Please choose the correct answer.
Response:

  • A. A user trigger material availability check via mass processing (transaction COHV)
  • B. A user trigger printing of shop floor paper manually (transaction CO02).
  • C. A user can schedule a background job to release production orders (transaction COOIS).
  • D. A user can trigger material staging via mass processing (transaction COHV).

正解: B

 

質問 55
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Material staging for next order in sequence
  • B. Archiving of documents for assembly scrap
  • C. Reduction of associated capacity requirements
  • D. Posting of production costs to the production cost collector
  • E. Posting of goods receipt for the product

正解: C,D,E

 

質問 56
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP planning file
  • B. MRP controller
  • C. MRP group
  • D. MRP type

正解: B

 

質問 57
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:

  • A. Material Master -> Plant Settings -> MRP Group
  • B. Plant Settings -> MRP Group -> Material Master
  • C. MRP Group -> Material Master -> Plant Settings
  • D. Material Master -> MRP Group -> Plant Settings

正解: D

 

質問 58
Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.
Response:

  • A. Wide adoption of web standards such as Service oriented architecture
  • B. Multi core processors enabling parallelism of tasks
  • C. Advances in the three-tier architecture approach
  • D. Big and affordable memory
  • E. Capability to add to server landscape and scale

正解: B,D,E

 

質問 59
Where do you maintain the duration of a product on operation?

  • A. Material master
  • B. Bill of material (BOM)
  • C. Routing
  • D. Work instructions

正解: C

 

質問 60
The material master of your finished product contains MRP type "PD". You set a manual firming date in the stock requirements list. Which of the following will firm planned orders" There are 2 correct answers to this question.
Response:

  • A. Manually changing the quantity of a planned order
  • B. Creating a planned order within the planning time fence
  • C. Setting a planning time fence in the Material Master Record
  • D. Assigning a production scheduling profile

正解: B,C

 

質問 61
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
Response:

  • A. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
  • B. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
  • C. Manually firm all planned orders for materials within the replenishment lead time of the material
  • D. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material

正解: B,D

 

質問 62
What are some of the advantages of using Kanban?
There are 2 correct answers to this question.
Response:

  • A. Replenishments are based on centralized planning
  • B. Replenishments are created close to the actual need
  • C. It is a simplified form of production control
  • D. It is mostly accomplished by manual postings

正解: B,C

 

質問 63
What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Production order
  • B. Stock transport order
  • C. Scheduling agreement schedule line
  • D. Planned order
  • E. Purchase requisition

正解: C,D,E

 

質問 64
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:

  • A. HANA Live
  • B. Smart Business Cockpit
  • C. ABAP Managed Core Data Services (CDS)
  • D. Multidimensional Reporting client (MDRC)

正解: C

 

質問 65
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.

  • A. SAP C/4HANA
  • B. SAP Field glass
  • C. SAP Ariba
  • D. SAP SuccessFactors
  • E. SAP Concur

正解: B,C,E

 

質問 66
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Select an alternative mode on a resource.
  • B. Form optimum sequences to reduce setup times.
  • C. Execute a new production planning run.
  • D. Reduce the planning window.
  • E. Adjust the available capacity.

正解: A,B,E

 

質問 67
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Create object selection variant for transportation lane-related alerts.
  • B. Create object selection variant for product-related alerts.
  • C. Assign the overall profile to the authorization profile.
  • D. Assign the alert profile to the overall profile.
  • E. Create object selection variant for resource-related alerts

正解: B,D,E

 

質問 68
......

SAP C_TS422_1909試験問題集で[2022年最新] 練習有効な試験問題集解答:https://jp.fast2test.com/C_TS422_1909-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어