
2022年最新の実際のC_TS422_1909問題集最新SAP練習テスト問題集ゲット
C_TS422_1909問題集PDFでC_TS422_1909リアル試験問題解答
SAP C_TS422_1909 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
| トピック 7 |
|
| トピック 8 |
|
質問 49
Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.
Response:
- A. In the plant parameters
- B. In the MRP group
- C. In the material master
- D. In the requirements class
正解: B,C
質問 50
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP C/4HANA
- B. SAP Field glass
- C. SAP Ariba
- D. SAP SuccessFactors
- E. SAP Concur
正解: B,C,E
質問 51
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Wait time
- B. Queue time
- C. Move time
- D. Pick/pack time
- E. Float before production
正解: A,B,D
質問 52
For what production type are production orders used?
- A. Discrete manufacturing processes
- B. Replenishment controlled by control cycles
- C. Period and quantity-oriented production
- D. Process manufacturing processes
正解: A
質問 53
What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question.
Response:
- A. Strategic analysis
- B. Automatic update of story boards
- C. Real time decision support
- D. Comparison of current data with historical data to identify trends
正解: A,C
質問 54
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question.
Response:
- A. Staging of components for the next order in the sequence
- B. Reduction of the capacity requirements
- C. Posting of production costs to cost collector
- D. Archiving of backflush documents
正解: C,D
質問 55
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Production cost collector
- B. Production version
- C. Repetitive manufacturing profile
- D. Routing
正解: B,D
質問 56
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- B. The assigned routing must NOT have alternative sequences.
- C. The lot size range must be within the lot-size range of the assigned routing.
- D. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- E. The assigned routing must be a rate routing.
正解: A,C,D
質問 57
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:
- A. MRP 4
- B. Basic Data 1
- C. Purchasing
- D. Work Scheduling
正解: C,D
質問 58
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:
- A. Exact lot sizing
- B. Fixed lot sizing
- C. Minimum lot sizing
- D. Periodic lot sizing
正解: D
質問 59
What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Response:
- A. Wait
- B. In use
- C. Full
- D. Empty
正解: C
質問 60
What are some of the advantages of using Kanban?
There are 2 correct answers to this question.
Response:
- A. Replenishments are based on centralized planning
- B. Replenishments are created close to the actual need
- C. It is a simplified form of production control
- D. It is mostly accomplished by manual postings
正解: B,C
質問 61
Which material-specific information can be transferred to a transportation lane in PP/DS?
There are 3 correct answers to this question.
Response:
- A. Production versions
- B. Purchasing info records
- C. Quota arrangements
- D. Special procurement keys
- E. Outline agreement
正解: B,D,E
質問 62
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.
- A. At order creation
- B. At order release
- C. At order settlement
- D. At order confirmation
正解: A,B
質問 63
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:
- A. Enter time-ticket confirmation for production orders
- B. Change sales order quantities
- C. Change planned order quantities
- D. Undo for drag & Drop planning activities
正解: C,D
質問 64
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Float after production
- B. Setup time
- C. Planned delivery time
- D. Total replenishment lead time
正解: A,C
質問 65
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning at assembly level (70)
- B. Planning with final assembly (40)
- C. Make-to-order production (20)
- D. Planning without final assembly (50)
正解: D
質問 66
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- A. The planning strategy is infinite.
- B. The Change Planning Direct on indicator is set.
- C. Alternative resources are fully occupied.
- D. The work center has several individual capacities.
正解: A,D
質問 67
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.
- A. Add the agreement to the quota arrangement and mark it for MRP relevance.
- B. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- C. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
- D. Add the agreement to the source list and mark it for MRP relevance.
正解: B,D
質問 68
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Installation point
- B. Item type
- C. Scrap percentage
- D. Quantity
正解: A,D
質問 69
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Dependent Requirements indicator
- B. Mixed MRP indicator
- C. Individual/Collective Indicator
- D. Storage Location MRP Indicator
正解: B
質問 70
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note:
There are 2 correct answers to this question.
- A. Use a specific material group
- B. Use a specific MRP controller.
- C. Use a specific MRP type.
- D. Use a specific material status.
正解: B,C
質問 71
......
C_TS422_1909プレミアム試験エンジンPDFをダウンロード:https://jp.fast2test.com/C_TS422_1909-premium-file.html