[2022年01月] 更新されたのはC_TS422_1909問題集PDFオンラインエンジン [Q36-Q54]

Share

[2022年01月] 更新されたのはSAP C_TS422_1909問題集PDFオンラインエンジン

C_TS422_1909.PDFで問題解答PDFサンプル問題は信頼され続ける

質問 36
Which of the following functions can be performed when the production order has the status "Created" (CRTD)?
Please choose the correct answer.
Response:

  • A. A user trigger material availability check via mass processing (transaction COHV)
  • B. A user trigger printing of shop floor paper manually (transaction CO02).
  • C. A user can schedule a background job to release production orders (transaction COOIS).
  • D. A user can trigger material staging via mass processing (transaction COHV).

正解: B

 

質問 37
Which process order function uses a resource network?
Please choose the correct answer.
Response:

  • A. Resource scheduling
  • B. Capacity leveling
  • C. Resource selection
  • D. Capacity planning

正解: C

 

質問 38
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. High product stability
  • B. Low product complexity
  • C. High product complexity
  • D. Low product stability

正解: A,B

 

質問 39
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:

  • A. With respect to defined separate key dates for product and each assembly
  • B. With respect to a defined separate change status for product and each assembly
  • C. With respect to a common change status for product and each assembly
  • D. With respect to a common key date for product and each assembly

正解: A

 

質問 40
What is a work center hierarchy in SAP S/4HANA capacity planning?

  • A. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
  • B. A group of work centers in a production line being used in sequence for production
  • C. A group of alternative work centers for production, structured in hierarchy levels by prior ties
  • D. A group of alternative work centers providing a cumulative available capacity for production

正解: D

 

質問 41
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:

  • A. Dependent Requirements indicator
  • B. Mixed MRP indicator
  • C. Individual/Collective Indicator
  • D. Storage Location MRP Indicator

正解: B

 

質問 42
What are some of the advantages of using Kanban?
There are 2 correct answers to this question.
Response:

  • A. Replenishments are based on centralized planning
  • B. Replenishments are created close to the actual need
  • C. It is a simplified form of production control
  • D. It is mostly accomplished by manual postings

正解: B,C

 

質問 43
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Production orders are created with sales order reference.
  • B. Sales order-specific planning run is required.
  • C. Net requirements calculation is sales order-specific.
  • D. Sales order-specific stock is created
  • E. Storage location MRP areas are required.

正解: A,C,D

 

質問 44
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Orders (dispatched) chart
  • B. Work center capacities chart
  • C. Order (pool) chart
  • D. Capacity requirements chart

正解: B,D

 

質問 45
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.

  • A. The planning strategy is infinite.
  • B. The Change Planning Direct on indicator is set.
  • C. Alternative resources are fully occupied.
  • D. The work center has several individual capacities.

正解: A,D

 

質問 46
Where do you maintain the duration of a product on operation?

  • A. Material master
  • B. Bill of material (BOM)
  • C. Routing
  • D. Work instructions

正解: C

 

質問 47
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a positive offset time in the strategy profile.
  • B. Specify a negative planning horizon in the strategy profile.
  • C. Specify a negative offset time in the strategy profile.
  • D. Specify a positive planning horizon in the strategy profile.

正解: C

 

質問 48
What is the first step in the MRP run?
Please choose the correct answer.
Response:

  • A. BOM explosion
  • B. Lot size calculation
  • C. Source determination
  • D. Net requirements calculation

正解: D

 

質問 49
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Scheduling working time only
  • B. Find Slot
  • C. Squeezing
  • D. Insert operation

正解: B

 

質問 50
Which Kanban master data object controls the relationship between the supply and demand source?
Please choose the correct answer.
Response:

  • A. Kanban container
  • B. Rate routing
  • C. Production supply area
  • D. Control cycle

正解: D

 

質問 51
How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer.
Response:

  • A. By activating the user statuses in status and action management
  • B. By defining a status profile and assigning it to the order type
  • C. By enhancing the system status customizing table with user statuses
  • D. By creating a user profile and assigning it to the production scheduling profile

正解: C

 

質問 52
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Setup matrix
  • B. Operation network
  • C. Resource network
  • D. Work center hierarchy

正解: D

 

質問 53
Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Response:

  • A. Elimination of document index tables
  • B. Elimination of status tables
  • C. Elimination of output condition tables
  • D. Elimination of LIS tables for rebates
  • E. Elimination of customer master tables

正解: A,B,E

 

質問 54
......

SAP C_TS422_1909問題集PDFのベストを目指すなら問題集を使おう 目指そう高得点:https://jp.fast2test.com/C_TS422_1909-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어