
[2022年01月] 更新されたのはSAP C_TS422_1909問題集PDFオンラインエンジン
C_TS422_1909.PDFで問題解答PDFサンプル問題は信頼され続ける
質問 36
Which of the following functions can be performed when the production order has the status "Created" (CRTD)?
Please choose the correct answer.
Response:
- A. A user trigger material availability check via mass processing (transaction COHV)
- B. A user trigger printing of shop floor paper manually (transaction CO02).
- C. A user can schedule a background job to release production orders (transaction COOIS).
- D. A user can trigger material staging via mass processing (transaction COHV).
正解: B
質問 37
Which process order function uses a resource network?
Please choose the correct answer.
Response:
- A. Resource scheduling
- B. Capacity leveling
- C. Resource selection
- D. Capacity planning
正解: C
質問 38
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. High product stability
- B. Low product complexity
- C. High product complexity
- D. Low product stability
正解: A,B
質問 39
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:
- A. With respect to defined separate key dates for product and each assembly
- B. With respect to a defined separate change status for product and each assembly
- C. With respect to a common change status for product and each assembly
- D. With respect to a common key date for product and each assembly
正解: A
質問 40
What is a work center hierarchy in SAP S/4HANA capacity planning?
- A. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
- B. A group of work centers in a production line being used in sequence for production
- C. A group of alternative work centers for production, structured in hierarchy levels by prior ties
- D. A group of alternative work centers providing a cumulative available capacity for production
正解: D
質問 41
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Dependent Requirements indicator
- B. Mixed MRP indicator
- C. Individual/Collective Indicator
- D. Storage Location MRP Indicator
正解: B
質問 42
What are some of the advantages of using Kanban?
There are 2 correct answers to this question.
Response:
- A. Replenishments are based on centralized planning
- B. Replenishments are created close to the actual need
- C. It is a simplified form of production control
- D. It is mostly accomplished by manual postings
正解: B,C
質問 43
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Production orders are created with sales order reference.
- B. Sales order-specific planning run is required.
- C. Net requirements calculation is sales order-specific.
- D. Sales order-specific stock is created
- E. Storage location MRP areas are required.
正解: A,C,D
質問 44
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Orders (dispatched) chart
- B. Work center capacities chart
- C. Order (pool) chart
- D. Capacity requirements chart
正解: B,D
質問 45
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- A. The planning strategy is infinite.
- B. The Change Planning Direct on indicator is set.
- C. Alternative resources are fully occupied.
- D. The work center has several individual capacities.
正解: A,D
質問 46
Where do you maintain the duration of a product on operation?
- A. Material master
- B. Bill of material (BOM)
- C. Routing
- D. Work instructions
正解: C
質問 47
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?
- A. Specify a positive offset time in the strategy profile.
- B. Specify a negative planning horizon in the strategy profile.
- C. Specify a negative offset time in the strategy profile.
- D. Specify a positive planning horizon in the strategy profile.
正解: C
質問 48
What is the first step in the MRP run?
Please choose the correct answer.
Response:
- A. BOM explosion
- B. Lot size calculation
- C. Source determination
- D. Net requirements calculation
正解: D
質問 49
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
- A. Scheduling working time only
- B. Find Slot
- C. Squeezing
- D. Insert operation
正解: B
質問 50
Which Kanban master data object controls the relationship between the supply and demand source?
Please choose the correct answer.
Response:
- A. Kanban container
- B. Rate routing
- C. Production supply area
- D. Control cycle
正解: D
質問 51
How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer.
Response:
- A. By activating the user statuses in status and action management
- B. By defining a status profile and assigning it to the order type
- C. By enhancing the system status customizing table with user statuses
- D. By creating a user profile and assigning it to the production scheduling profile
正解: C
質問 52
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Setup matrix
- B. Operation network
- C. Resource network
- D. Work center hierarchy
正解: D
質問 53
Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Response:
- A. Elimination of document index tables
- B. Elimination of status tables
- C. Elimination of output condition tables
- D. Elimination of LIS tables for rebates
- E. Elimination of customer master tables
正解: A,B,E
質問 54
......
SAP C_TS422_1909問題集PDFのベストを目指すなら問題集を使おう 目指そう高得点:https://jp.fast2test.com/C_TS422_1909-premium-file.html