
[2023年07月] 無料C-TS413-2021試験問題集試験点数を伸ばそう
2023年最新のC-TS413-2021実際問題集には試験のコツがあるPDF試験材料
SAP C-TS413-2021試験は、SAP S/4HANA資産管理の専門知識を証明したい個人を対象としています。この認定試験は、財務、会計、ITなどの専門家、およびさまざまな役割を担う個人に役立ちます。試験は、組織内でのキャリアアップや、この分野での新しい求人機会を探す個人にとっても貴重なツールです。
質問 # 31
You want to assign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?
- A. Assign the header material of a material BOM as assembly to atask list operation.
- B. Assign the header material of a material BOM to the equipmenttask list header.
- C. Assign the BOM usage for free assignment of material in Customizing.
- D. Free assignment of material is always possible without any prerequisites.
正解:C
質問 # 32
What does a virtual data model provides
- A. consumption ready views of data
- B. Ready to use business reports
- C. Reporting tools for users
- D. A copy of the database optimized for analytical purpose
正解:A
質問 # 33
You want to create a maintenance order with an external order operation with service items. Which of the following statements arecorrect? Note: There are 3 correct answers to this question.
- A. The assignment of service master records to an order operation is optional.
- B. The assignment of a control key with the service indicator set is mandatory.
- C. The assignment of a control key with the service indicator set is mandatory.
- D. The usage of a model service specification is mandatory.
- E. The actual value entry can only be recorded via the service entrysheet.
正解:B、C、E
質問 # 34
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.
- A. Edit classification data and characteristics.
- B. Change a reference location.
- C. Create a measuring point.
- D. Assign documents.
- E. Assign a subordinate piece of equipment.
正解:A、C、D
質問 # 35
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question.
- A. Add a URL to provide further information.
- B. Display the current location of the technical object.
- C. Select and print the maintenance order shop papers.
- D. Input estimated costs for repair malfunction.
- E. View details of the technical object by navigating to the Asset Viewer.
正解:A、B、E
質問 # 36
How do you map a counter replacement in SAP S/4HANA Asset Management?
- A. Create a new measurement document and assign a valuationcode for counter replacement.
- B. Replace the defective piece of equipment to which a counter is assigned.
- C. Create a new measurement document marked as a counter replacement.
- D. Deactivate the current counter and create a new counter.
正解:C
質問 # 37
Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct answers to this question.
- A. Overall costs are dynamically summed up on header level.
- B. Purchase requisitions have the operation as account assignment.
- C. The settlement rule is maintained on header level.
- D. A technical object must be assigned to an order operation.
- E. Costs are only stored for the operation object.
正解:A、D、E
質問 # 38
Which of the following BOMs we use to set up spare parts planning of functional locations
- A. Production BOM
- B. construction BOM
- C. Costing BOM
- D. Maintenance BOM
正解:D
質問 # 39
In which of the following locations can object information can be found
- A. Din master record of technical object
- B. In Order
- C. In document
- D. In Notification
正解:B
質問 # 40
Which statements related to the creation of maintenance orders arecorrect? Note: There are 2 correct answers to this question.
- A. The document within the document management system canbe assigned only at operational level.
- B. When an order is created based on a single notification, this notification becomes the header notification.
- C. The long text of the reference notification can be automatically copied as the long text of the order.
- D. The assignment of the header notification to an order CANNOTbe deleted.
正解:B、C
質問 # 41
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.
- A. Open reservations can be cleared when a maintenance order operation is finally confirmed.
- B. All open reservations are closed when the maintenance order isset to TECO.
- C. For the combination of order type and planner group you can decide when reservations are created.
- D. Reservations are created only after a material availability checkhas been performed.
正解:A、B
質問 # 42
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.
- A. Assign an inspection lot to the task list header.
- B. Assign an inspection document as PRT to the task list operation.
- C. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
- D. Assign a piece of equipment with an allocated measuring point to a task list operation.
正解:C、D
質問 # 43
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planneddate if you set the shift factor for early completion to 100%?
- A. It is not shifted.
- B. It will be 5 days earlier.
- C. It is postponed by 5 days.
- D. It is postponed by a full cycle (100%).
正解:C
質問 # 44
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question.
- A. Equipment task list
- B. Maintenance plan header
- C. Measurement document
- D. Work order confirmation
- E. Maintenance plan item
正解:C、D、E
質問 # 45
What do you need to configure to enable entries in the action log ofan equipment?
- A. Define the corresponding history-related field for the equipment reference category.
- B. Define an additional business view for the equipment category.
- C. Select the time segment check box for the equipment category.
- D. Activate the change documents for the equipment category.
正解:D
質問 # 46
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct answers to this question.
- A. Cost analytics
- B. Breakdown analytics
- C. ESRI maps
- D. Work orders and operations
- E. Technical objects
正解:B、D、E
質問 # 47
You create a revision for a maintenance event builder (MEB) scenario. Which of the following statements are correct? Note: Thereare 2 correct answers to this question.
- A. You can assign a hierarchical task list to the revision.
- B. You can assign a network to a revision.
- C. You must use hierarchical task lists for the MEB scenario.
- D. You must assign maintenance notifications to the revision.
正解:A、D
質問 # 48
In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question.
- A. Investments
- B. Condition-based maintenance
- C. External refurbishment
- D. Shutdowns and overhaul
正解:A、D
質問 # 49
You are analyzing the data transfer of the cost center of an equipment. What are the possible data origins? Note: There are 2correct answers to this question.
- A. The cost center of the related maintenance work center
- B. The individual maintenance of the cost center in the equipment master record
- C. The cost center of the superior equipment
- D. The reference functional location of the superior functional location
正解:B、C
質問 # 50
The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used?
- A. An entry in the object list
- B. A text in the subject long text screen
- C. An activity in the notification header
- D. A task in the notification item
正解:C
質問 # 51
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question.
- A. Object network
- B. Start marker
- C. Unit of measure
- D. Segment
- E. Type of offset
正解:B、C、E
質問 # 52
......
SAP C-TS413-2021 資格認定試験は、アセット管理のキャリアを追求する個人にとって有益な資格です。この試験は、アセット管理に関連するさまざまなトピックをカバーし、これらのトピックの理解と実際の状況でこの知識を適用する能力を候補者がテストするように設計されています。この認定を取得することは、個人のキャリアを進め、収入を増やすのに役立つことがあります。
SAP C-TS413-2021試験は、SAP S/4HANA Asset Managementと連携するプロフェッショナルの知識とスキルを試験するよう設計されています。この試験は、SAP S/4HANA Asset Managementのコアコンセプトと機能をしっかりと理解しており、この分野でSAPアプリケーションアソシエイトとして認定されたいと考えている個人を対象としています。
心強いC-TS413-2021のPDF問題集はC-TS413-2021問題:https://jp.fast2test.com/C-TS413-2021-premium-file.html
正真正銘のC-TS413-2021問題集で無料PDF問題で合格させる:https://drive.google.com/open?id=1zrJQbg-UnFMtmOQ7RH_zm_824dtvqkyI