質問 54
What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question.

  • A. Add a serialized material to the equipment serial data view.
  • B. Assign a serial number profile to the equipment category.
  • C. Maintain a serial number for an existing equipment master.
  • D. Assign a serial number profile to the related material master.
  • E. Add a serialized material to the construction type field of the equipment master.

正解: A,D,E

 

質問 55
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?

  • A. Lead float
  • B. Scheduling period
  • C. Scheduling indicator
  • D. Call horizon

正解: B

 

質問 56
Which functionalities are available in the SAP Asset Manager fora maintenance worker? Note: There are 2 correct answers to this question.

  • A. Change BOM. Create a work order on the ESRI map
  • B. Schedule resources. Change task list
  • C. Confirm time sheets. Attach documents
  • D. Display maps. Display and maintain technical objects

正解: C,D

 

質問 57
You want to display vehicle-specific data for a piece of equipment. How do you proceed?

  • A. Assign a view profile to the combination of fleet object type and usage type.
  • B. Define the field selection for the vehicle equipment master data.
  • C. Assign a view profile to an equipment category for fleet equipment.
  • D. Assign a view profile to the combination of fleet object type and equipment category.

正解: D

 

質問 58
Which of the following statements about breakdown maintenanceare correct? Note: There are 3 correct answers to this question.

  • A. More than one operation must always be maintained in the maintenance order.
  • B. Orders and notifications can be utilized in combination
  • C. Maintenance orders can be created as immediate orders without any planning.
  • D. Notifications are used for documentation of technical findingsand activities performed.
  • E. Orders always need to be combined with notifications

正解: B,C,D

 

質問 59
Which material type is the best choice if you only want to create a structure element within the BOM?

  • A. Maintenance assembly (IBAU)
  • B. Spare part (ERSA)
  • C. Operating supplies (HIBE)
  • D. Non-valuated material (UNBW)

正解: A

 

質問 60
Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question.

  • A. SAP GUI transactions can be used in the SAP Fiori launchpad.
  • B. Web Dynpro apps can be used in the SAP Fiori launchpad
  • C. SAP Fiori launchpad only supports SAP UI5 apps.
  • D. The cloud version can also use SAP GUI for Windows.

正解: B,C

 

質問 61
You require stock material to carry out maintenance tasks. Whichof the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct answers to this question.

  • A. Material can be assigned at order header level.
  • B. The pick list for materials can be printed before order release.
  • C. Material can be assigned at order operation level.
  • D. A control key for internal workforce is required when assigning stock material to an order operation.
  • E. A goods receipt can be entered for a technically completed maintenance order.

正解: C,D,E

 

質問 62
You cancel the technical completion of a work order. What are theeffects? Note: There are 2 correct answers to this question.

  • A. Open purchase requisitions are recompiled
  • B. Open purchase orders are recompiled.
  • C. Open reservations are recompiled.
  • D. Referenced notifications are put In Process again.

正解: A,C

 

質問 63
In which component do you have to perform most of theconfiguration to set up SAP Asset Manager?

  • A. SAP Cloud Platform
  • B. SAP S/4HANA
  • C. SAP Mobile Platform
  • D. SAP ERP

正解: A

 

質問 64
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question.

  • A. Book a goods receipt.
  • B. Change the priority.
  • C. Cancel status Released.
  • D. Change the estimated costs.

正解: A,B

 

質問 65
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.

  • A. Assign an inspection document as PRT to the task list operation.
  • B. Assign an inspection lot to the task list header.
  • C. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
  • D. Assign a piece of equipment with an allocated measuring point to a task list operation.

正解: C,D

 

質問 66
What is the correct receiver object type for the settlement of arefurbishment order?

  • A. The WBS element
  • B. The fixed asset
  • C. The material
  • D. The cost center

正解: C

 

質問 67
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question.

  • A. By assigning a portal role with an SAP Fiori catalog
  • B. By assigning a PFCG role with an SAP Fiori tile group
  • C. By assigning the tiles directly
  • D. By assigning a PFCG role with an SAP Fiori catalog

正解: B,D

 

質問 68
Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question.

  • A. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
  • B. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • C. You have access to the SAP S/4HANA back end system.
  • D. You do NOT have access to the SAP S/4HANA back end system.

正解: B,D

 

質問 69
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?

  • A. Location Analysis list
  • B. Structure Display
  • C. Usage list
  • D. Historical Orders list

正解: C

 

質問 70
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.

  • A. Open reservations can be cleared when a maintenance order operation is finally confirmed.
  • B. Reservations are created only after a material availability checkhas been performed.
  • C. All open reservations are closed when the maintenance order isset to TECO.
  • D. For the combination of order type and planner group you can decide when reservations are created.

正解: A,C

 

質問 71
......


SAP C-TS413-2021 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Describe and implement the options for analytics in asset management especially regarding S
  • 4HANA emebedded analytics
  • Refurbishment of Spare Parts
トピック 2
  • タスク リスト、単一サイクル、時間ベースの戦略
  • 保守処理 - 標準を使用した予防保守のオプションについて説明します。
トピック 3
  • Describe and implement the process of corrective maintenance using traditional
  • Describe and implement the process of internal and external refurbishment of spare parts
トピック 4
  • Describe and implement the necessary organizational units especially regarding the integration
  • Maintenance Processing - Phase-based

 

C-TS413-2021試験問題を今すぐ試そう!最新の[2023年最新] 正解回答付き:https://jp.fast2test.com/C-TS413-2021-premium-file.html

合格させるC-TS413-2021試験にはリアル問題解答:https://drive.google.com/open?id=1zrJQbg-UnFMtmOQ7RH_zm_824dtvqkyI


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어