質問 34
You want to create a maintenance order with an external order operation with service items. Which of the following statements arecorrect? Note: There are 3 correct answers to this question.
- A. The assignment of a control key with the service indicator set is mandatory.
- B. The usage of a model service specification is mandatory.
- C. The actual value entry can only be recorded via the service entrysheet.
- D. The assignment of a control key with the service indicator set is mandatory.
- E. The assignment of service master records to an order operation is optional.
正解: A,C,D
質問 35
Which of the following statements about breakdown maintenanceare correct? Note: There are 3 correct answers to this question.
- A. Orders and notifications can be utilized in combination
- B. Orders always need to be combined with notifications
- C. More than one operation must always be maintained in the maintenance order.
- D. Maintenance orders can be created as immediate orders without any planning.
- E. Notifications are used for documentation of technical findingsand activities performed.
正解: A,D,E
質問 36
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.
- A. SAP QuickViewer
- B. Plant Maintenance Information Systems (PMIS)
- C. SAP Crystal Reports
- D. SAP Lumira
正解: C,D
質問 37
You create two maintenance packages and only one package should be executed at a time. Which parameter determines this?
- A. Hierarchy
- B. Offset
- C. Subsequent buffer
- D. Package sequence
正解: A
質問 38
Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question.
- A. You do NOT have access to the SAP S/4HANA back end system.
- B. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
- C. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
- D. You have access to the SAP S/4HANA back end system.
正解: A,C
質問 39
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?
- A. Location Analysis list
- B. Historical Orders list
- C. Structure Display
- D. Usage list
正解: D
質問 40
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question.
- A. Maintenance planner group
- B. Maintenance work center
- C. Business partner
- D. Storage location
正解: B,D
質問 41
What is a valid partner type within the partner determinationprocedure?
- A. Purchasing organization
- B. Business partner (gen.
- C. Vendor (external)
- D. Purchasing group
正解: B
質問 42
Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question.
- A. It defines which data is transferred to the lower levels of the hierarchy.
- B. It can have a maximum length of 50 characters.
- C. It defines the allowed characters for a functional location.
- D. It defines hierarchy levels of the functional location structure.
正解: C,D
質問 43
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.
- A. True
- B. False
正解: B
質問 44
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question.
- A. View details of the technical object by navigating to the Asset Viewer.
- B. Add a URL to provide further information.
- C. Display the current location of the technical object.
- D. Select and print the maintenance order shop papers.
- E. Input estimated costs for repair malfunction.
正解: A,B,C
質問 45
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question.
- A. Via the multi-level order list (SAP GUI)
- B. Within the SAP Fiori-based background job
- C. Via the Change Maintenance Order SAP Fiori app
- D. Via the Manage Maintenance Order List SAP Fiori app
正解: A,B
質問 46
The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used?
- A. A task in the notification item
- B. An activity in the notification header
- C. An entry in the object list
- D. A text in the subject long text screen
正解: B
質問 47
What can be determined using the offset within a maintenancestrategy?
- A. The start date of the maintenance order
- B. The first due date of a maintenance package
- C. The call date for the maintenance order
- D. The cycle duration
正解: B
質問 48
Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order?
- A. Initial/subsequent buffer
- B. Call horizon
- C. Package hierarchy
- D. Package offset
正解: A
質問 49
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note:There are 3 correct answers to this question.
- A. Analyze confirmed maintenance orders that have NOT been settled.
- B. Display approved purchase requisitions for which purchase orders have been generated.
- C. Analyze overdue maintenance orders that have NOT been finally confirmed.
- D. Display approved purchase requisitions for which NO purchase orders have been generated.
- E. Analyze maintenance orders that are still in planning andhave NOT been released.
正解: A,D,E
質問 50
Which material type is the best choice if you only want to create a structure element within the BOM?
- A. Maintenance assembly (IBAU)
- B. Spare part (ERSA)
- C. Non-valuated material (UNBW)
- D. Operating supplies (HIBE)
正解: A
質問 51
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question.
- A. By assigning a PFCG role with an SAP Fiori tile group
- B. By assigning a PFCG role with an SAP Fiori catalog
- C. By assigning the tiles directly
- D. By assigning a portal role with an SAP Fiori catalog
正解: A,B
質問 52
How does a performance-based maintenance plan calculate the interval between start date and planned date?
- A. Cycle length divided by (annual performance / 365)
- B. Cycle length divided by ((scheduling period) x (cycle modification factor))
- C. Cycle length divided by annual performance
- D. Cycle length divided by monthly performance
正解: A
質問 53
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct answers to this question.
- A. Cost analytics
- B. Breakdown analytics
- C. Technical objects
- D. Work orders and operations
- E. ESRI maps
正解: B,C,D
質問 54
You cancel the technical completion of a work order. What are theeffects? Note: There are 2 correct answers to this question.
- A. Open reservations are recompiled.
- B. Referenced notifications are put In Process again.
- C. Open purchase requisitions are recompiled
- D. Open purchase orders are recompiled.
正解: A,C
質問 55
You want to assign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?
- A. Free assignment of material is always possible without any prerequisites.
- B. Assign the header material of a material BOM as assembly to atask list operation.
- C. Assign the header material of a material BOM to the equipmenttask list header.
- D. Assign the BOM usage for free assignment of material in Customizing.
正解: D
質問 56
What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question.
- A. Assign a serial number profile to the equipment category.
- B. Add a serialized material to the construction type field of the equipment master.
- C. Assign a serial number profile to the related material master.
- D. Add a serialized material to the equipment serial data view.
- E. Maintain a serial number for an existing equipment master.
正解: B,C,D
質問 57
You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.
- A. Define the functional location category.
- B. Define the reference functional location.
- C. Define the number range for the functional location category.
- D. Define the structure indicator.
正解: A,D
質問 58
......
SAP C-TS413-2021 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
| トピック 6 |
|
| トピック 7 |
|