2022年最新の有効な3V0-21.21テスト解答とVMware試験PDF問題を試そう
無料VMware 3V0-21.21試験問題と解答トレーニングを提供していますFast2test
VMware 3V0-21.21 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
質問 25
An architect is designing a new backup solution for a vSphere platform that has been recently upgraded to vSphere 7.
The architect wants the backup solution to perform the following:
Full virtual machine image backup and restore
Incremental virtual machine image backup and restore
File level backup and restore within both Windows and Linux virtual machines LAN-free backup Which functional requirement should the architect include in the design of the new backup solution?
- A. The backup solution must leverage virtual machine snapshots.
- B. The backup solution must leverage VMware vStorage APIs for Data Protection (VADP).
- C. The backup solution must leverage the VMware Consolidated Backup (VCB) framework.
- D. The backup solution must leverage VMware vSphere Storage APIs - Data Protection.
正解: D
質問 26
There is a request for approved virtual machine applications through a new vSphere platform's integrated automation portal. The platform was built following all provided company security guidelines and has been assessed against Sarbanes-Oxley Act of 2002 (SOX) regulations.
The platform has the following characteristics:
vRealize Operations is being used to monitor all clusters.
There is a dedicated ESXi cluster, supporting all management services.
All network traffic is via distributed virtual switches (DVS).
There is a dedicated ESXi cluster for all line-of-business applications.
Network traffic is serviced by NSX-T.
There is a dedicated ESXi cluster for virtual desktop infrastructure (VDI).
Network traffic is serviced by NSX-T.
The application owner is requesting approval to install a new service that must be protected as per the Payment Card Industry (PCI) Data Security Standard.
Which additional non-functional requirement should the architect include in the design to support the new service?
- A. The vSphere hosting platform and all PCI application virtual machines must be monitored using the vRealize Operations Compliance Pack for Payment Card Industry.
- B. The vSphere hosting platform and all PCI application virtual machine network traffic must be routed via NSX-T.
- C. The vSphere hosting platform and all PCI application virtual machines must be assessed for SOX compliance.
- D. The vSphere hosting platform and all PCI application virtual machines must be assessed against Payment Card Industry (PCI) Data Security Standard compliance.
正解: B
質問 27
An architect is tasked with reviewing the design of a VMware software-defined data center (SDDC) for a software development company. The platform is used to developing applications and services. It is important that the customer be able to accurately benchmark performance of developed applications.
The platform has recently commissioned new hosts to update the development cluster.
The development cluster host configuration is:
4 ESXi hosts with 2 sockets × 16 cores
512 GB RAM divided evenly between sockets
There is no resource contention
The benchmarking cluster host configuration is:
8 ESXi hosts with 2 sockets × 8 cores
256 GB RAM divided evenly between sockets
There is no resource contention
The customer is developing an application that includes a database virtual machine. The application developer states that the database virtual machine performs as required only when allocated 8 vCPUs 256 GB RAM. The database virtual machine performance meets the required levels when run from the development cluster. Performance benchmarking for the database virtual machine yields highly variable results when run from the benchmarking cluster. The application cannot be released without reliable performance benchmarking data.
What is a possible reason for the difference in performance test results between the development and benchmarking clusters?
- A. The development cluster has more available RAM per host
- B. The database tier breaches a single NUMA node boundary for the development cluster
- C. The database tier breaches a single NUMA node boundary for the benchmarking cluster
- D. The development cluster can support a lower %Ready time per vCPU
正解: D
質問 28
Refer to the exhibit.
During a requirements gathering workshop, the architect shares the following diagram:
What should the architect recommend for guaranteed throughput for each service?
- A. Create a link aggregation group (LAG) for vDS_01
Use the Route Based on Physical NIC Load for vMotion Use the Route Based on Physical NIC Load for replication - B. Use explicit failover order with pNIC0 as Active for ESXi Management and VM Network Use explicit failover order with pNIC1 as Active for backup network Use explicit failover order with pNIC2 as Active for vMotion Use explicit failover order with pNIC3 as Active for replication
- C. Use the Route Based on IP Hash for ESXi management and VM network Use the Route Based on IP Hash for backup network Use the Route Based on the Originating Virtual Port for vMotion Use failover with pNIC3 as Active for replication
- D. Use the Route Based on IP Hash for ESXi management and VM network Use failover with pNIC1 as Active for backup network Create a link aggregation group (LAG) for vDS_02
正解: B
質問 29
An architect is finalizing the design for a new vCenter Server High Availability deployment.
What is one thing the architect must document in the design?
- A. The vCenter Management Network IPv4 addresses for the witness node vCenter Server
- B. The SSH configuration settings for the vCenter Server's active node
- C. The details of each of the vCenter Server licenses for active, passive and witness nodes
- D. The load balancing algorithm used by the Management Distributed Virtual Switches (DVS)
正解: A
解説:
https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vsphere.avail.doc/GUID-9B176C8A-4EEE-4A28-A3C1-24656D6402CF.html
質問 30
Which two of the listed requirements would be classified as manageability non-functional requirements? (Choose two.)
- A. ESXi clusters must scale when compute resources are sustained above 70% for five business days
- B. vSphere Fault Tolerance must be supported to improve application uptime
- C. ESXi host updates must be installed within one week of release
- D. ESXi clusters must scale to 500 concurrent virtual machines
- E. The vSphere environment must support administrator password rotation
正解: A,C
質問 31
An architect is reviewing a physical storage design. The customer has specified that a new active-passive based storage array will be used to provide storage for the vSphere clusters.
Which configuration should for the architect recommended?
- A. VMW_PSP_FIXED
- B. VMW_PSP_MRU
- C. VMW_SATP_DEFAULT_AA
- D. VMW_SATP_LOCAL
正解: B
質問 32
An architect is designing a VMware solution for a customer to meet the following requirements:
The solution must use investments in existing storage array that supports both block and file storage.
The solution must support the ability to migrate workloads between hosts within a cluster.
The solution must support resource management priorities.
The solution must support the ability to connect virtual machines directly to LUNs.
The solution should use existing 32G fabric infrastructure.
There is no budget for additional physical hardware.
Which design decision should the architect make to meet these requirements?
- A. The ESXi hosts will leverage NFS.
- B. The ESXi hosts will leverage Fibre Channel (FC).
- C. The ESXi hosts will leverage iSCSI.
- D. The ESXi hosts will leverage Fibre Channel over Ethernet (FCoE).
正解: B
質問 33
An architect is designing the expansion of an existing vSphere 7 environment. The customer is requesting a design for a new cluster to support the anticipated future business growth. The requirements specified for the existing environment design must be considered when designing the new cluster.
The existing design has the following requirements:
REQ01 The environment has an availability target of 99.5% for all infrastructure.
REQ02 The recovery time objective (RTO) for Tier 1 virtual machines is one hour.
REQ03 Windows and Linux virtual machines must reside on separate clusters.
REQ04 Access to the management cluster within the environment must be controlled.
Which of the listed requirements would be classified as a functional requirement?
- A. Windows and Linux virtual machines must reside on separate clusters
- B. The recovery time objective (RTO) for Tier 1 virtual machines is one hour
- C. Access to the management cluster within the environment must be controlled
- D. The environment has an availability target of 99.5% for all infrastructure
正解: D
質問 34
An architect is designing a new vSphere environment to meet the following requirements:
The environment must support 5,000 virtual machines.
The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?
- A. Large
- B. Tiny
- C. Small
- D. Medium
正解: A
質問 35
Which requirement would be classified as a functional requirement within the application design documentation?
- A. The application must be hosted with redundancy levels of N+1 or better.
- B. The application must be capable of handling 200 transactions per second.
- C. Penetration testing must be executed quarterly with a pass rate of 80% or higher.
- D. Administrators must monitor the network traffic of the desired systems.
正解: B
質問 36
An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image. All hosts within the cluster have the same CPU and memory capacity.
Which ESXi deployment method should the architect use?
- A. Stateless cached vSphere Auto Deploy
- B. Stateful vSphere Auto Deploy
- C. Manual install of each ESXi host with an image from USB
- D. Stateless vSphere Auto Deploy
正解: A
解説:
Explanation/Reference: https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.esxi.install.doc/GUID-0813B4BE-
485D-4129-902B-49AA42EBF54E.html
質問 37
What is a benefit of using a scale-out method for handling vSphere cluster growth?
- A. Less potential impact to virtual machines during a single host failure
- B. An overall reduction in the license costs for the cluster
- C. Faster to reach the limit of virtual machines per host
- D. An increase in the recovery time objective (RTO) for the cluster
正解: A
質問 38
An architect decides to separate virtual desktops and application servers into separate vSphere clusters to meet security and management requirements.
What are two implications of this design decision? (Choose two.)
- A. There will be an increase in management overhead.
- B. There will be a reduction in performance.
- C. The patching cycles will affect both clusters at the same time.
- D. There will be additional licensing and cost requirements for both clusters.
- E. Identical hardware must be procured for all hosts.
正解: A,B
質問 39
An architect is tasked with designing a greenfield VMware software-defined data center (SDDC) solution that will be used to deliver a private cloud service for a customer.
During the initial meeting with the service owner and business sponsor, the customer has provided the following information to help inform the design:
* The solution must initially support the concurrent running of 300 production and 600 development virtual machines.
* The production environment should be delivered across two geographically dispersed data centers.
* The development environment must be vSphere-based but does not have to be deployed on-premises.
* The two data centers are connected to each other through multiple diversely routed, high bandwidth and low latency links.
* The customer's server hardware standard document states that all virtual infrastructure hosts must be based on blade architecture only.
* The service owner has said that is important to ensure that neither the availability target of 99.5% nor the resource capacity is affected when the operations team completes maintenance activities, such as the monthly software patching and ad-hoc hardware break/fix.
* All virtual machine backups must be completed using the existing backup service.
* The recovery time objective (RTO) for the service is four hours.
* The recovery point objective (RPO) of the service is 24 hours.
Given the information from the customer, which two would be classified as assumptions within the design?
(Choose two.)
- A. The backup service has sufficient capacity for the new requirements
- B. All virtual machines will be deployed with the same resource profile for production and development
- C. The customer will update their hardware standard to support rack mount servers
- D. The clusters will have a minimum redundancy of N+1
- E. The backup service will store data in a secure facility
正解: C,E
質問 40
An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image. All hosts within the cluster have the same CPU and memory capacity.
Which ESXi deployment method should the architect use?
- A. Stateless cached vSphere Auto Deploy
- B. Stateful vSphere Auto Deploy
- C. Manual install of each ESXi host with an image from USB
- D. Stateless vSphere Auto Deploy
正解: A
質問 41
An architect is tasked with designing a new VMware software-defined data center (SDDC) using VMware vSAN. The architect uses a storage assessment tool to determine the storage requirements for the new vSAN cluster. The new SDDC is going to be deployed into the existing data center and must be connected to a shared core network switch.
The architect decides to use vSAN ReadyNodes with the following configuration:
Two disk groups with:
Write Intensive NVMe 800 GB drive for cache
Four 3.84 TB Mixed Use NVMe for capacity
Four 10 GbE ports
Which element represents a risk that should be included in this design?
- A. The existing network is 10 GbE capable
- B. The use of NVMe drives for cache and capacity
- C. The use of vSAN ReadyNodes
- D. The number of 10 GbE capable ports in the vSAN ReadyNode
正解: A
質問 42
An architect is reviewing a physical storage design. The customer has specified that storage DRS will be used for ease of operational management for capacity and performance.
Which recommendation should the architect include in the design?
- A. Create larger datastores to balance space with Storage DRS
- B. Create smaller datastores to balance space with Storage DRS
- C. Create more datastores within each Storage DRS cluster to balance space and performance
- D. Use a larger number of storage profiles (varied disk speeds and RAID levels) to improve performance
正解: C
質問 43
Which design decision must be included in a design to allow for the deployment of a minimum supported configuration of vCenter High Availability (HA)?
- A. A new subnet will be provisioned for vCenter HA services
- B. The deployed vCenter Server will be Tiny
- C. A vSphere cluster will consist of more than three nodes
- D. The vCenter HA network will support a latency of less than 50 ms
正解: A
質問 44
Application owners require support of a Microsoft Windows Server Failover Cluster (WSFC).
Their current environment consists of the following components:
vSphere 7.0 and vSAN 7.0
External array supporting NFS 3.0/4.1, Server Message Block (SMB) 2.1
10 GbE storage connectivity for all devices
The solution architect is tasked with coming up with a solution to meet this requirement while utilizing their existing investments.
Which two recommendations could the architect make? (Choose two.)
- A. Use the SMB 2.1 protocol for sharing disks
- B. Run WSFC on vSAN iSCSI Target Service
- C. Use raw device mapping (RDM)
- D. Use NFS 4.1 shares for quorum and shared disk
- E. Use vSAN native support for WSFC
正解: B,E
解説:
Reference:
https://blogs.vmware.com/virtualblocks/2018/04/18/vsan-6-7-introducing-wsfc-support-vsan
質問 45
......
トップクラスVMware 3V0-21.21オンライン問題集:https://jp.fast2test.com/3V0-21.21-premium-file.html
3V0-21.21練習問題集で検証済みのFast2test更新された90問題あります:https://drive.google.com/open?id=1RPkqtVL7r0WQrwPmqdeCvpHr6JH5uZCF