質問 # 31
An architect is preparing a design for a company planning digital transformation. During the requirements gathering workshop, the following requirements (REQ) and constraints (CON) are identified:
* REQ01 The platform must host different types of workloads including applications that must be compliant with internal security standard.
* REQ02 The infrastructure must initially run 100 virtual machines.
* REQ03 Ten of the virtual machines must be compliant with internal security standard.
* REQ04 The internal security standard specifies logical network separation for in-scope applications.
* CON01 The customer has already purchased the licenses as part of another project.
* CON02 The customer has five physical servers that must be reused.
Additionally, based on resource requirements, four physical servers will be enough to run all workloads.
Which recommendation should the architect make to meet requirements while minimizing project costs?

  • A. Use Network I/O Control to ensure the internal security zone has higher share value
  • B. Use a single cluster and configure DRS anti-affinity rules to ensure internal security compliant virtual machines cannot migrate between ESXi hosts.
  • C. Purchase additional servers and plan separate, isolated clusters for workloads that must be compliant with internal security
  • D. Use a single cluster and ensure that different security zones are separated at least with dedicated VLANs and firewall

正解:B


質問 # 32
Which requirement would be classified as a functional requirement within the application design documentation?

  • A. Administrators must monitor the network traffic of the desired systems.
  • B. Penetration testing must be executed quarterly with a pass rate of 80% or higher.
  • C. The application must be hosted with redundancy levels of N+1 or better.
  • D. The application must be capable of handling 200 transactions per second.

正解:A

解説:
Functional requirements describe what a system or solution must do. The requirements include the following categories:
* Business rules: For example, the architecture must support both the primary and secondary data centers.
* Administrative functions: For example, network and security administrators must monitor the network traffic of the desired systems.


質問 # 33
A customer has a database cluster with 40/60 read/write ratio and a high IOPs requirement with no contention on an all-flash vSAN cluster.
Which two storage settings should be configured for best performance? (Choose two.)

  • A. RAID 5/6
  • B. Deduplication and Compression disabled
  • C. RAID 1
  • D. IOPs limits enabled
  • E. Deduplication and Compression enabled

正解:C、D


質問 # 34
During a requirements gathering workshop, the customer provides the following requirement (REQ) and constraints (CON):
REQ01: The customer is looking for a way to limit database virtual machine (VM) placement to save on CPU licensing costs.
CON01: There is a single cluster with no budget to scale.
CON02: All virtual machines must run on the consolidated cluster.
Which two design decisions should the architect make to meet the customer requirement? (Choose two.)

  • A. The solution must use VM-Host affinity rules
  • B. The solution must use vSphere VM and host DRS groups
  • C. The solution must use VM-VM anti-affinity rules
  • D. The solution must use a vRealize Orchestrator workflow for VM placement
  • E. The solution must use vSphere DRS in manual mode

正解:A、B


質問 # 35
Which requirement would be classified as a functional requirement within the application design documentation?

  • A. Penetration testing must be executed quarterly with a pass rate of 80% or higher.
  • B. The application must be capable of handling 200 transactions per second.
  • C. The application must be hosted with redundancy levels of N+1 or better.
  • D. Administrators must monitor the network traffic of the desired systems.

正解:B


質問 # 36
An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image. All hosts within the cluster have the same CPU and memory capacity.
Which ESXi deployment method should the architect use?

  • A. Stateful vSphere Auto Deploy
  • B. Stateless cached vSphere Auto Deploy
  • C. Manual install of each ESXi host with an image from USB
  • D. Stateless vSphere Auto Deploy

正解:D


質問 # 37
Which of the listed requirements would be classified as a recoverability non-functional requirement?

  • A. The platform must be integrated with existing change control policies.
  • B. The platform must be available 24 hours a day, 7 days a week with the exception of scheduled downtime.
  • C. The platform must be able to support a maximum tolerable downtime (MTD) of 30 minutes.
  • D. Maintenance windows must be scheduled to take place monthly during an established overnight period.

正解:C


質問 # 38
During a requirements gathering workshop, the customer's Chief Information Security Office (CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:
* All operating system critical patches must be installed within 24 hours of release.
* All virtual machine templates must be updated every three months in line with company policy.
Which requirement classification is being gathered for the design documentation?

  • A. Security
  • B. Manageability
  • C. Recoverability
  • D. Availability

正解:B

解説:
Explanation


質問 # 39
An architect is designing a solution based on the following information:
Each ESXi host has a single physical NIC with two 10 Gbps ports.
There is a performance-based service-level agreement (SLA) that guarantees 15 Gbps bandwidth for production virtual machines at all times.
There is no budget to purchase additional hardware.
The hardware replacement SLA is based on a delivery agreement of two business days.
Which recommendation for the configuration of vSphere High Availability (HA) should the architect include in the design?

  • A. Configure vSphere HA
    Configure % based admission control Configure two isolation addresses
    Consider an OEM with NIC failure conditions in their Proactive HA plugin
  • B. Configure Proactive HA Automation Level: Automated
    Remediation: Maintenance mode for all failures
    Consider an OEM with NIC failure conditions in their Proactive HA plugin
  • C. Configure vSphere HA
    Configure two existing data stores for heartbeat
    Consider an OEM with NIC failure conditions in their Proactive HA plugin
  • D. Configure vSphere HA
    Set das.IgnoreRedundantNetWarning to true
    Consider an OEM with NIC failure conditions in their Proactive HA plugin

正解:A


質問 # 40
Refer to the exhibit.

During a requirements gathering workshop, the customer shares the following about their existing ESXi host virtual networking infrastructure:
The customer confirms that:
Each ESXi host has approximately 200 virtual machines.
They want to maximize the number of concurrent virtual machine migrations.
When placing a host in maintenance mode, it takes a long time to evacuate the virtual machines.
Which two recommendations should the architect make in order to help the customer overcome their challenge? (Choose two.)

  • A. Configure the network to use MTU for the VMotion VMKernel to 9,000 bytes
  • B. Use the 3 pNICs and bundle them in a link aggregation group (LAG) configuration
  • C. Create an additional standard switch with pNIC3 to use for vMotion
  • D. Use 10 GbE NICs instead of 1 GbE
  • E. Configure the network to use MTU for the VMotion VMKernel to 1,600 bytes

正解:C、D


質問 # 41
A customer is deploying a new cluster and wants to be able to patch and update two hosts in parallel. The cluster must be able to maintain N+1 resiliency across the remaining hosts while patching activities are performed. The current expected utilization of the platform requires a minimum of two hosts to support all of the virtual machines.
What is the minimum number of hosts the customer will require in the cluster in order to meet the required resiliency level?

  • A. Four
  • B. Five
  • C. Seven
  • D. Six

正解:B


質問 # 42
An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image. All hosts within the cluster have the same CPU and memory capacity.
Which ESXi deployment method should the architect use?

  • A. Stateless vSphere Auto Deploy
  • B. Stateful vSphere Auto Deploy
  • C. Stateless cached vSphere Auto Deploy
  • D. Manual install of each ESXi host with an image from USB

正解:C

解説:
Explanation/Reference: https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.esxi.install.doc/GUID-0813B4BE-
485D-4129-902B-49AA42EBF54E.html


質問 # 43
An architect is planning the physical server configuration for a vSAN-based infrastructure.
Which operations mode should a RAID controller support to minimize potential server downtime during physical disk failures?

  • A. RAID controller with RAID 5 mode
  • B. RAID controller with RAID 10 mode
  • C. RAID controller with RAID 6 mode
  • D. RAID controller with Passthru mode

正解:D


質問 # 44
A customer defines a requirement to minimize the vMotion migration time during a maintenance period. The servers being used are equipped with eight 1 GbE network adapters.
Per the defined logical network configuration, there are two network adapters each used for:
Management traffic
vMotion traffic
iSCSI traffic
Virtual machine traffic
Which design decision should the architect make to meet the customer requirement?

  • A. Use Network I/O Control to define a reservation for vMotion traffic.
  • B. Implement Multi-NIC vMotion by adding additional vMotion VMkernels.
  • C. Combine vMotion and Management traffic to make use of four adapters.
  • D. Configure a dedicated TCP/IP stack for vMotion traffic.

正解:A


質問 # 45
There is a request for approved virtual machine applications through a new vSphere platform's integrated automation portal. The platform was built following all provided company security guidelines and has been assessed against Sarbanes-Oxley Act of 2002 (SOX) regulations.
The platform has the following characteristics:
vRealize Operations is being used to monitor all clusters.
There is a dedicated ESXi cluster, supporting all management services.
All network traffic is via distributed virtual switches (DVS).
There is a dedicated ESXi cluster for all line-of-business applications.
Network traffic is serviced by NSX-T.
There is a dedicated ESXi cluster for virtual desktop infrastructure (VDI).
Network traffic is serviced by NSX-T.
The application owner is requesting approval to install a new service that must be protected as per the Payment Card Industry (PCI) Data Security Standard.
Which additional non-functional requirement should the architect include in the design to support the new service?

  • A. The vSphere hosting platform and all PCI application virtual machines must be assessed for SOX compliance.
  • B. The vSphere hosting platform and all PCI application virtual machines must be assessed against Payment Card Industry (PCI) Data Security Standard compliance.
  • C. The vSphere hosting platform and all PCI application virtual machines must be monitored using the vRealize Operations Compliance Pack for Payment Card Industry.
  • D. The vSphere hosting platform and all PCI application virtual machine network traffic must be routed via NSX-T.

正解:B


質問 # 46
An architect is tasked with designing a new VMware software-defined data center (SDDC) solution for an online retail customer who has a primary and secondary data center as well as 10 distribution hubs.
The customer has provided the following business requirements to help inform the design:
The solution must support the running of up to 1,000 concurrent virtual machines across the primary and secondary data center.
The solution must support the running of up to 20 concurrent virtual machines in each distribution hub.
The solution must support the separation of management and lines-of-business application virtual machines.
All management components (including directory services, backup, automation, operations and logging) must be deployed to the primary data center.
All virtual infrastructure components must have redundancy of N+1.
All sites are connected to each other using a wide area network that has multiple diversely routed links.
The solution should support a monthly uptime target of 99.9%.
The recovery time objective (RTO) for the solution must be four hours.
The recovery point objective (RPO) for the solution must be 24 hours.
Given the information from the customer, which assumption should the architect include in the design?

  • A. Each distribution hub should be configured with a backup device.
  • B. The wide area network has sufficient bandwidth to support centralized management.
  • C. Each cluster will have a minimum of four hosts.
  • D. All business application virtual machines can be deployed into a single cluster within the primary data center.

正解:A


質問 # 47
An architect is designing a new vSphere platform to meet a list of requirements from the security team.
Which two requirements would be classified as non-functional requirements? (Choose two.)

  • A. Log information must be verbose to support incident resolution
  • B. A common content library must be maintained across all data centers
  • C. Migration of virtual machines between hosts must be encrypted
  • D. Critical events generated within the platform must be logged to an external Syslog service
  • E. Data integrity must be ensured

正解:A、D


質問 # 48
An architect is designing an environment for a retail customer. The design will use a single small vCenter Server Appliance and a cluster of eight ESXi hosts at a remote site. There is a single 10 GbE connected network at the remote site to support all management services. It is not possible to create additional management networks at the remote site. Virtual machine backups at the site will be dependent on the vCenter Server being available.
Which design decision should the architect make to maximize availability for backups?

  • A. The cluster will be configured with vSphere HA and set to restart virtual machines based on guest operating system heartbeat monitoring.
  • B. The cluster will be configured to use vSphere DRS in fully automated mode.
  • C. The vCenter Server Appliance will be protected with vSphere Fault Tolerance.
  • D. vCenter Server High Availability will be configured.

正解:C

解説:
https://kb.vmware.com/s/article/1024051


質問 # 49
During a requirements gathering workshop, the customer provides the following requirement:
A new vSphere platform must be designed securely and all interfaces must be protected against potential snooping.
How should this non-functional security requirement be documented?

  • A. Unauthorized access to interfaces must be reported within 15 minutes.
  • B. Encrypted channels must be used for all communications.
  • C. Communications must be through Private VLANs (PVLAN).
  • D. Interfaces must be audited.

正解:C

解説:
For example:
"Your ESXi host uses several networks. Use appropriate security measures for each network, and isolate traffic for specific applications and functions. For example, ensure that VMware vSphere vMotion traffic does not travel over networks where virtual machines are located. Isolation prevents snooping. Having separate networks is also recommended for performance reasons."
https://docs.vmware.com/en/VMware-vSphere/7.0/vsphere-esxi-vcenter-server-70-security-guide.pdf


質問 # 50
Which two of the listed requirements would be classified as performance non-functional requirements? (Choose two.)

  • A. The vSphere platform must be able to provide a recovery time objective of 30 minutes
  • B. The vSphere platform must be able to provide N+1 redundancy
  • C. The vSphere platform must be able to provide a minimum throughput of 400 MB/s
  • D. The vSphere platform must be able to provide a service-level agreement (SLA) of 99,9%
  • E. The vSphere platform must be able to provide a maximum read latency of 15 ms

正解:C、E


質問 # 51
Which requirement would be classified as a functional requirement within the design documentation?

  • A. The system must be able to scale to support 500 concurrent virtual machines.
  • B. Virtual machines must be patched within one month of the patch release date.
  • C. Virtual machines must be restarted within 30 minutes of a host failure.
  • D. The system must perform virtual machine backups through an API.

正解:D


質問 # 52
During a requirements gathering workshop, the customer provides the following requirement (REQ) and constraints (CON):
REQ01: The customer is looking for a way to limit database virtual machine (VM) placement to save on CPU licensing costs.
CON01: There is a single cluster with no budget to scale.
CON02: All virtual machines must run on the consolidated cluster.
Which two design decisions should the architect make to meet the customer requirement? (Choose two.)

  • A. The solution must use vSphere VM and host DRS groups
  • B. The solution must use VM-VM anti-affinity rules
  • C. The solution must use VM-Host affinity rules
  • D. The solution must use vSphere DRS in manual mode
  • E. The solution must use a vRealize Orchestrator workflow for VM placement

正解:A、E


質問 # 53
......

更新された検証済みの合格させる3V0-21.21試験にはリアル問題と解答:https://jp.fast2test.com/3V0-21.21-premium-file.html

最適な練習法にはVMware 3V0-21.21試験の素晴らしい3V0-21.21試験問題PDF:https://drive.google.com/open?id=1RPkqtVL7r0WQrwPmqdeCvpHr6JH5uZCF


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어