質問 # 38
An architect is designing a new vSphere platform to meet a list of requirements from the security team.
Which two requirements would be classified as non-functional requirements? (Choose two.)
- A. A common content library must be maintained across all data centers
- B. Data integrity must be ensured
- C. Log information must be verbose to support incident resolution
- D. Critical events generated within the platform must be logged to an external Syslog service
- E. Migration of virtual machines between hosts must be encrypted
正解:B、D
質問 # 39
An architect is preparing a design for a company planning digital transformation. During the requirements gathering workshop, the following requirements (REQ) and constraints (CON) are identified:
* REQ01 The platform must host different types of workloads including applications that must be compliant with internal security standard.
* REQ02 The infrastructure must initially run 100 virtual machines.
* REQ03 Ten of the virtual machines must be compliant with internal security standard.
* REQ04 The internal security standard specifies logical network separation for in-scope applications.
* CON01 The customer has already purchased the licenses as part of another project.
* CON02 The customer has five physical servers that must be reused.
Additionally, based on resource requirements, four physical servers will be enough to run all workloads.
Which recommendation should the architect make to meet requirements while minimizing project costs?
- A. Use a single cluster and configure DRS anti-affinity rules to ensure internal security compliant virtual machines cannot migrate between ESXi hosts.
- B. Use Network I/O Control to ensure the internal security zone has higher share value
- C. Use a single cluster and ensure that different security zones are separated at least with dedicated VLANs and firewall
- D. Purchase additional servers and plan separate, isolated clusters for workloads that must be compliant with internal security
正解:A
質問 # 40
An architect decides to separate virtual desktops and application servers into separate vSphere clusters to meet security and management requirements.
What are two implications of this design decision? (Choose two.)
- A. The patching cycles will affect both clusters at the same time.
- B. There will be additional licensing and cost requirements for both clusters.
- C. Identical hardware must be procured for all hosts.
- D. There will be an increase in management overhead.
- E. There will be a reduction in performance.
正解:D、E
質問 # 41
Refer to the exhibit.
During a requirements gathering workshop, a customer shares the following diagram regarding their availability service-level agreements (SLAs):
The customer states that there is no application level availability for legacy applications.
Which recommendation could the architect make to meet the customer's high availability requirements for the legacy applications virtual machines?
- A. Achieve application availability with snapshots
- B. Enable vSphere HA and add a VM Override with VM Restart Priority set to Disabled
- C. Enable Fault Tolerance
- D. Enable vSphere HA and add a VM Override with VM Restart Priority set to Lowest
正解:B
質問 # 42
A VMware Service Provider is tasked with delivering a solution for continuous availability for a subset of Tier 1 virtual machines (VMs) and vApps running in their vSAN environment. The VMs make up a mission-critical application and there can be no data loss in the event of an outage at their primary data center. In the event of a regional outage, they have established a 10-minute recovery point objective (RPO). Failover/failback to the third site must be automated.
They have the following in place:
Two local data centers (primary and secondary) connected with 100 Gb dedicated fiber
2ms round-trip time (RTT) latency between the sites
A third data center located on another power grid
70ms latency between the primary and secondary data centers
Matching storage arrays at all locations
Which two solutions could be used to meet the requirements? (Choose two.)
- A. vSAN Metro Cluster
- B. Snapshots
- C. vSphere Data Protection
- D. Site Recovery Manager
- E. vStorage APIs for Array Integration (VAAI)
正解:A、D
解説:
https://core.vmware.com/resource/vsan-stretched-cluster-guide#section1
https://www.delltechnologies.com/asset/en-us/products/converged-infrastructure/technical-support/vxrail-stretched-cluster-planning-guide-for-7-0.pdf
- a latency of less than or equal to 100 milliseconds is preferred.
Witness to Site -- less than 100msec; 200msec is acceptable https://www.delltechnologies.com/asset/en-us/products/converged-infrastructure/technical-support/vxrail-stretched-cluster-planning-guide-for-7-0.pdf - a latency of less than or equal to 100 milliseconds is preferred.
質問 # 43
A customer defines a requirement to minimize the vMotion migration time during a maintenance period. The servers being used are equipped with eight 1 GbE network adapters.
Per the defined logical network configuration, there are two network adapters each used for:
Management traffic
vMotion traffic
iSCSI traffic
Virtual machine traffic
Which design decision should the architect make to meet the customer requirement?
- A. Configure a dedicated TCP/IP stack for vMotion traffic.
- B. Combine vMotion and Management traffic to make use of four adapters.
- C. Use Network I/O Control to define a reservation for vMotion traffic.
- D. Implement Multi-NIC vMotion by adding additional vMotion VMkernels.
正解:C
質問 # 44
An architect is preparing a design for a customer. Based on requirements, the architect recommends an HCI- based infrastructure with all-flash architecture. During the assessment, it is confirmed that the network throughput generated by virtual machines does not exceed 150 Mb/s.
What is the minimum number and type of network adapters in each server that the architect can recommend to ensure requirements are met and there is no single point of failure?
- A. Four 10 GbE network adapters per server
- B. Two 10 GbE network adapters per server
- C. Two 1 GbE network adapters per server
- D. Four 1 GbE network adapters per server
正解:B
解説:
HCI-based infrastructure with all-flash architecture
minimum number and type of network adapters so ensure requirements are met and there is no single point of failure Networking Requirements for vSAN Dedicated 1 Gbps for hybrid configurations Dedicated or shared 10 Gbps for all-flash configurations
質問 # 45
An architect is reviewing a physical storage design. The customer has specified that a new active-passive based storage array will be used to provide storage for the vSphere clusters.
Which configuration should for the architect recommended?
- A. VMW_SATP_DEFAULT_AA
- B. VMW_SATP_LOCAL
- C. VMW_PSP_FIXED
- D. VMW_PSP_MRU
正解:D
質問 # 46
A customer defines a requirement to minimize the vMotion migration time during a maintenance period. The servers being used are equipped with eight 1 GbE network adapters.
Per the defined logical network configuration, there are two network adapters each used for:
Management traffic
vMotion traffic
iSCSI traffic
Virtual machine traffic
Which design decision should the architect make to meet the customer requirement?
- A. Use Network I/O Control to define a reservation for vMotion traffic.
- B. Implement Multi-NIC vMotion by adding additional vMotion VMkernels.
- C. Configure a dedicated TCP/IP stack for vMotion traffic.
- D. Combine vMotion and Management traffic to make use of four adapters.
正解:B
解説:
https://kb.vmware.com/s/article/2007467
https://communities.vmware.com/t5/VMware-vSphere-Discussions/vmotion-load-balanced-across-multiple-uplinks-on-distributed/td-p/491336
https://www.virtuallyboring.com/multi-nic-vmotion/
We maintain the 2 x 1 GbE network adapters for vMotion and then configure multiple VMkernel interfaces using the same NIC and network. Each time you add a VMkernel adapter and enable it for vMotion, you create a new stream. With more streams, there is greater bandwidth utilization.
質問 # 47
An architect is designing a VMware solution for a customer to meet the following requirements:
The solution must use investments in existing storage array that supports both block and file storage.
The solution must support the ability to migrate workloads between hosts within a cluster.
The solution must support resource management priorities.
The solution must support the ability to connect virtual machines directly to LUNs.
The solution should use existing 32G fabric infrastructure.
There is no budget for additional physical hardware.
Which design decision should the architect make to meet these requirements?
- A. The ESXi hosts will leverage iSCSI.
- B. The ESXi hosts will leverage Fibre Channel over Ethernet (FCoE).
- C. The ESXi hosts will leverage Fibre Channel (FC).
- D. The ESXi hosts will leverage NFS.
正解:C
質問 # 48
An architect is designing storage for a new vSphere environment to meet the following requirements:
Asynchronous replication is required between two sites.
The impact on the storage layer should not impact the performance of the compute layer.
Each application tier will require different replication attributes.
Virtual machine live migration across compute and storage must be supported.
Virtual machine aware back up will be leveraged.
Operational management overhead should be minimized.
Operational automation should be supported.
Which storage design recommendations would meet the requirements?
- A. Two new ISCSI storage arrays will be deployed, one at either site.
Each application tier will be initially provisioned a new LUN. Data replication will be offloaded to the new arrays. - B. Two new storage arrays will be deployed, one at either site.
vSphere Volumes (vVOLs) will be used to provide policy-based management for each application tier. Data replication will be offloaded to the new arrays. - C. Two new Fibre Channel storage arrays will be deployed, one at either site.
Each application tier will be initially provisioned a new LUN. Data replication will be offloaded to the new arrays. - D. Two new vSphere clusters enabled with vSAN will be deployed, one at either site. vSAN will be used to provide policy-based management for each application tier.
vSphere Replication will be used to replicate the virtual machine data in an asynchronous configuration.
正解:C
質問 # 49
Which two statements are true about gathering functional business and application requirements? (Choose two.)
- A. It builds stakeholder consensus
- B. It leverages a single set of Question:s for all stakeholders
- C. It is a non-iterative process
- D. It focuses on functional requirements with C-level stakeholders
- E. It might require multiple rounds of stakeholder interviews
正解:D、E
質問 # 50
During a requirements gathering workshop, the customer provides the following requirement:
A new vSphere platform must be designed securely and all interfaces must be protected against potential snooping.
How should this non-functional security requirement be documented?
- A. Unauthorized access to interfaces must be reported within 15 minutes.
- B. Encrypted channels must be used for all communications.
- C. Interfaces must be audited.
- D. Communications must be through Private VLANs (PVLAN).
正解:D
解説:
For example:
"Your ESXi host uses several networks. Use appropriate security measures for each network, and isolate traffic for specific applications and functions. For example, ensure that VMware vSphere vMotion traffic does not travel over networks where virtual machines are located. Isolation prevents snooping. Having separate networks is also recommended for performance reasons."
https://docs.vmware.com/en/VMware-vSphere/7.0/vsphere-esxi-vcenter-server-70-security-guide.pdf
質問 # 51
As part of a new hybrid cloud initiative for a large financial company, the customer technical team is presenting an overview of the current state of the infrastructure and their vision for a new solution.
The project team captures notes during the presentation and adds them to the discovery documentation.
Which of the listed statements is a design constraint?
- A. The two data center locations have a network latency of 8 ms round-trip time (RTT)
- B. The existing storage is out of maintenance
- C. The maximum tolerable data loss is 10 minutes
- D. The applications are created in-house with in-guest recovery protection
正解:B
質問 # 52
An architect is designing the expansion of an existing vSphere 7 environment. The customer is requesting a design for a new cluster to support the anticipated future business growth. The requirements specified for the existing environment design must be considered when designing the new cluster.
The existing design has the following requirements:
REQ01 The environment has an availability target of 99.5% for all infrastructure.
REQ02 The recovery time objective (RTO) for Tier 1 virtual machines is one hour.
REQ03 Windows and Linux virtual machines must reside on separate clusters.
REQ04 Access to the management cluster within the environment must be controlled.
Which of the listed requirements would be classified as a functional requirement?
- A. The recovery time objective (RTO) for Tier 1 virtual machines is one hour
- B. Access to the management cluster within the environment must be controlled
- C. The environment has an availability target of 99.5% for all infrastructure
- D. Windows and Linux virtual machines must reside on separate clusters
正解:C
質問 # 53
Application owners require support of a Microsoft Windows Server Failover Cluster (WSFC).
Their current environment consists of the following components:
vSphere 7.0 and vSAN 7.0
External array supporting NFS 3.0/4.1, Server Message Block (SMB) 2.1
10 GbE storage connectivity for all devices
The solution architect is tasked with coming up with a solution to meet this requirement while utilizing their existing investments.
Which two recommendations could the architect make? (Choose two.)
- A. Use raw device mapping (RDM)
- B. Run WSFC on vSAN iSCSI Target Service
- C. Use NFS 4.1 shares for quorum and shared disk
- D. Use the SMB 2.1 protocol for sharing disks
- E. Use vSAN native support for WSFC
正解:D、E
質問 # 54
Refer to the exhibit.
During a requirements gathering workshop, the architect shares the following diagram:
What should the architect recommend for guaranteed throughput for each service?
- A. Use explicit failover order with pNIC0 as Active for ESXi Management and VM Network Use explicit failover order with pNIC1 as Active for backup network Use explicit failover order with pNIC2 as Active for vMotion Use explicit failover order with pNIC3 as Active for replication
- B. Use the Route Based on IP Hash for ESXi management and VM network Use the Route Based on IP Hash for backup network Use the Route Based on the Originating Virtual Port for vMotion Use failover with pNIC3 as Active for replication
- C. Create a link aggregation group (LAG) for vDS_01
Use the Route Based on Physical NIC Load for vMotion Use the Route Based on Physical NIC Load for replication - D. Use the Route Based on IP Hash for ESXi management and VM network Use failover with pNIC1 as Active for backup network Create a link aggregation group (LAG) for vDS_02
正解:A
解説:
" The problem is that in A VM network and management is together. In this scenario backup and VM network should be together. From the load point of view, it makes sense, as backup can saturate 100% of NIC but it is not service."
質問 # 55
An architect is planning the physical server configuration for a vSAN-based infrastructure.
Which operations mode should a RAID controller support to minimize potential server downtime during physical disk failures?
- A. RAID controller with RAID 6 mode
- B. RAID controller with RAID 10 mode
- C. RAID controller with RAID 5 mode
- D. RAID controller with Passthru mode
正解:A
質問 # 56
The storage team at an organization is planning to migrate from an older Fibre Channel storage environment to a new environment using IP-based storage.
Which two switch features or characteristics are appropriate for IP storage networks? (Choose two.)
- A. 2:1 or greater bandwidth oversubscription for 10 GbE switches
- B. Non-blocking switch
- C. Deep or ultra buffered switches
- D. Fabric extending devices
- E. Spanning Tree Protocol (STP)
正解:A、E
質問 # 57
During a requirements gathering workshop, the customer's Chief Information Security Office (CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:
All operating system critical patches must be installed within 24 hours of release.
All virtual machine templates must be updated every three months in line with company policy.
Which requirement classification is being gathered for the design documentation?
- A. Recoverability
- B. Manageability
- C. Security
- D. Availability
正解:B
解説:
https://securityboulevard.com/2020/12/building-non-functional-requirements-framework-requirements-categories/
質問 # 58
There is a request for approved virtual machine applications through a new vSphere platform's integrated automation portal. The platform was built following all provided company security guidelines and has been assessed against Sarbanes-Oxley Act of 2002 (SOX) regulations.
The platform has the following characteristics:
vRealize Operations is being used to monitor all clusters.
There is a dedicated ESXi cluster, supporting all management services.
All network traffic is via distributed virtual switches (DVS).
There is a dedicated ESXi cluster for all line-of-business applications.
Network traffic is serviced by NSX-T.
There is a dedicated ESXi cluster for virtual desktop infrastructure (VDI).
Network traffic is serviced by NSX-T.
The application owner is requesting approval to install a new service that must be protected as per the Payment Card Industry (PCI) Data Security Standard.
Which additional non-functional requirement should the architect include in the design to support the new service?
- A. The vSphere hosting platform and all PCI application virtual machine network traffic must be routed via NSX-T.
- B. The vSphere hosting platform and all PCI application virtual machines must be assessed for SOX compliance.
- C. The vSphere hosting platform and all PCI application virtual machines must be assessed against Payment Card Industry (PCI) Data Security Standard compliance.
- D. The vSphere hosting platform and all PCI application virtual machines must be monitored using the vRealize Operations Compliance Pack for Payment Card Industry.
正解:D
解説:
The vSphere hosting platform and all PCI application virtual machines must be monitored using the vRealize Operations Compliance Pack for Payment Card Industry.
"Non-functional requirements specify all the remaining requirements not covered by the functional requirements. They specify criteria that judge the operation of a system, rather than specific behaviours"
質問 # 59
An architect is designing a VMware software-defined data center (SDDC) solution based on the following customer requirements:
The solution must initially support 1,000 virtual machines
The solution must scale to support the concurrent running of up to 5,000 virtual machines The production environment should be delivered across two data centers The solution should have a maximum tolerable downtime (MTD) of four hours The solution should have a monthly service availability target of 99.8% Which two assumptions could the architect make based on the information from the customer to help size the solution? (Choose two.)
- A. The average resource utilization of a virtual machine
- B. The size (CPU/RAM/storage) of the vSphere hosts
- C. The number of vSphere hosts in a cluster
- D. The guest operating system for each virtual machine
- E. The size (CPU/RAM/storage) of the average virtual machine
正解:B、C
質問 # 60
Which two of the listed requirements would be classified as manageability non-functional requirements? (Choose two.)
- A. The vSphere environment must support administrator password rotation
- B. ESXi host updates must be installed within one week of release
- C. vSphere Fault Tolerance must be supported to improve application uptime
- D. ESXi clusters must scale to 500 concurrent virtual machines
- E. ESXi clusters must scale when compute resources are sustained above 70% for five business days
正解:B、E
解説:
https://enkonix.com/blog/functional-requirements-vs-non-functional/
"Functional requirements explain how the system must work, while non functional requirements explain how the system should perform"