試験問題集で2V0-21.23練習で無料最新のVMware練習テスト [Q24-Q40]

Share

試験問題集で2V0-21.23練習で無料最新のVMware練習テスト

2V0-21.23試験問題、リアル2V0-21.23練習問題集


VMware 2V0-21.23認定を獲得することは、VMware vsphere 8.X環境を管理および管理するITプロフェッショナルにとって貴重な資産です。この認定は、スキルと知識を検証し、雇用主と同僚に、VSPhere 8.X環境を管理および構成する専門知識があることを示しています。これは、あなたがあなたのキャリアを進め、あなたの収益の可能性を高めるのに役立つ世界的に認められた認定です。さらに、この認定は、仮想化管理の最新のテクノロジーとベストプラクティスを最新の状態に保つのに役立ちます。

 

質問 # 24
Refer to the exhibit.

Given the configuration shown in the exhibit, what should the administrator do if the latest VM template contains changes that are no longer needed?

  • A. Delete App-LibTemplate (2)
  • B. Revert to App-LibTernplate (2)
  • C. Check out App-LibTemplate (3)
  • D. Delete App-LibTemplate (3)

正解:D

解説:
Explanation
Deleting App-LibTemplate (3) will remove the changes that are no longer needed and revert to the previous version of the template.
References:
https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vsphere.vm_admin.doc/GUID-9A5093A5-C54F
https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vsphere.vm_admin.doc/GUID-D69B0279-CC9B


質問 # 25
An administrator has Windows virtual machines (VMs) and VMware Tools is installed in each VM. The administrator performs a status check of VMware Tools using vSphere Lifecycle Manager.
What is the VMware Tools status for the Windows VMs if the version of VMware Tools has a known problem and must be immediately upgraded?

  • A. Upgrade Available
  • B. Unknown
  • C. Guest Managed
  • D. Version Unsupported

正解:A

解説:
Explanation
The VMware Tools status for the Windows VMs if the version of VMware Tools has a known problem and must be immediately upgraded is Upgrade Available, which indicates that a newer version of VMware Tools is available for installation.
References:
https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vsphere.lifecycle_manager.doc/GUID-6F5F2F3


質問 # 26
When configuring vCenter High Availability (HA), which two statements are true regarding the active, passive, and witness nodes? (Choose two.)

  • A. Network latency must be more than 10 milliseconds.
  • B. They must have a minimum of a 1 Gbps network adapter.
  • C. They must have a minimum of a 10 Gbps network adapter
  • D. Network latency must be less than 10 milliseconds.
  • E. They must have a supported Wide Area Network (WAN).

正解:B、D

解説:
When configuring vCenter High Availability (HA), two of the requirements for the active, passive, and witness nodes are that network latency must be less than 10 milliseconds, which ensures reliable communication between them; and they must have a minimum of a 1 Gbps network adapter, which provides sufficient bandwidth for data replication.


質問 # 27
An administrator has a host profile named Standard-Config. The administrator wants to change the other host profiles to use only the storage configuration settings that are defined in the Standard-Config host profile.
What should the administrator do to make this change?

  • A. Export host customizations and import them to the other host profiles.
  • B. Duplicate the Standard-Config host profile and only modify the storage configuration settings.
  • C. Copy the storage settings from Standard-Config to all other host profiles.
  • D. Export the Standard-Config host profile and attach it to the other hosts.

正解:C

解説:
Explanation
Option B is correct because it allows the administrator to copy the storage settings from Standard-Config host profile to all other host profiles without affecting other settings. Option A is incorrect because it only exports host customizations and not host profile settings. Option C is incorrect because it creates a new host profile instead of modifying the existing ones. Option D is incorrect because it attaches the Standard-Config host profile to the other hosts instead of changing their host profiles. References:
https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vsphere.hostprofiles.doc/GUID-F1A1D1D0-D6


質問 # 28
During the staging of a patch on a vCenter Server Appliance, an error was encountered and the process stopped. An administrator resolved the root cause and is ready to continue with the staging of the patch.
From the vCenter Management Interface, which action should the administrator take to continue the process from the point at which the error occurred?

  • A. Use the Stage and Install option to resume the staging.
  • B. Use the Stage Only option to restart the staging.
  • C. Use the Unstage option to restart the staging.
  • D. Use the Resume option to resume the staging.

正解:D

解説:
Explanation
docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vcenter.upgrade.doc/GUID-FF533442-66F0-4797-976


質問 # 29
An administrator wants to create virtual machine (VM) templates and store them in a content library. The administrator would like to use the content library to manage different versions of these templates so that reverting to an earlier version is an option.
How should the administrator create these templates?

  • A. Convert a VM to a template in the vCenter inventory.Clone the template to the content library.
  • B. Export a VM in the vCenter inventory to an OVF template. Import the OVF template into the content library.
  • C. Select a VM in the vCenter inventory.
    Clone the VM to the content library as a VM template type.
  • D. Select a VM template in the vCenter inventory. Clone the template to the content library.

正解:C

解説:
Explanation
Option A is correct because it allows the administrator to clone a VM to the content library as a VM template type, which can be used to create and manage different versions of these templates in the content library.
Option B is incorrect because it requires the administrator to convert a VM to a template in the vCenter inventory first, which is an extra step. Option C is incorrect because it requires the administrator to export a VM to an OVF template and import it into the content library, which are extra steps. Option D is incorrect because it requires the administrator to convert a VM to a template in the vCenter inventory and clone it to the content library, which are extra steps. References:
https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vsphere.vm_admin.doc/GUID-9F9E3F8C-0E2B


質問 # 30
Refer to Exhibit:

An environment has the following configuration:
*Resource Pool "RP-MOM? has a reservation of 6GHz and one running virtual machine (VM) "VM-M1? with
1 GHz reserved
*Resource Pool ^RP-KID? has a reservation of 2GHz, and expandable reservations is activated The administrator creates two VMs, "VM-K1? and 'VM-K2?, in the ''RP-KID? resource pool with 2GHz reserved for each, and turns on "VM-M1 ?
Given this scenario, which statement is true?

  • A. VM-K2 cannot be powered on because there are not enough resources in RP-KID.
  • B. The administrator can create a third VM ( VM-K3?) at RP-KID and reserve 6GHz
  • C. The administrator must deactivate expandable reservations to turn on VM-K2
  • D. VM-K2 can be powered on because it can get the resources needed from RP-MOM.

正解:D

解説:
Explanation
https://docs.vmware.com/en/VMware-vSphere/8.0/vsphere-resource-management/GUID-60077B40-66FF-4625-


質問 # 31
An administrator is planning to upgrade a VMware vCenter instance to version 8. It is currently integrated with the following solutions:
* VMware Aria Automation
* VMware Cloud Director
Which tool can the administrator use to run Interoperability reports before the upgrade process?

  • A. sphere Update Manager
  • B. vSphere Lifecycle Manager
  • C. VMware Aria Suite Lifecycle
  • D. vCenter Server Update Planner

正解:D

解説:
The tool that can be used to run interoperability reports before upgrading a vCenter Server instance is vCenter Server Update Planner, which allows checking compatibility with other VMware products.


質問 # 32
An administrator creates a new corporate virtual machine (VM) template every month to include all of the latest patches. The administrator needs to ensure that the new VM template is synchronized from the primary data center site (London) to two secondary data center sites (Tokyo and New York). The administrator is aware that datastore space is limited within the secondary data center sites. The administrator needs to ensure that the VM template is available in the secondary sites the first time a new virtual machine is requested.
Which four steps should the administrator take to meet these requirements? (Choose four.)

  • A. Create a new subscribed content library in each secondary site.
  • B. Create a new published content library at the primary site.
  • C. Configure the subscribed content library to download content when needed.
  • D. Add the virtual machine template to the published content library.
  • E. Add the virtual machine template to the subscribed content library.
  • F. Configure each subscribed content library to download content immediately.
  • G. Create a new published content library in each secondary site.

正解:A、B、C、D

解説:
To meet the requirements of synchronizing and protecting images and templates with limited datastore space, the administrator needs to create a new published content library at the primary site, which makes it available for subscription by other vCenter Server instances; create a new subscribed content library in each secondary site, which allows accessing content from a published content library; configure the subscribed content library to download content when needed, which saves datastore space by only downloading content on demand; and add the virtual machine template to the published content library, which makes it available for other hosts to use.


質問 # 33
An administrator notices a Fibre Channel adapter in an ESXi host has been experiencing inconsistent connectivity states.
Which trigger can be used to quickly identify the issue and alert the administrator so that the issue can be resolved?

  • A. Host Connection Lost
  • B. Lost Storage Connectivity
  • C. Lost Network Connectivity
  • D. Lost Network Path Redundancy

正解:B

解説:
https://kb.vmware.com/s/article/2014553
Book course: 6-23 Fibre Channel SAN Components Using SAN switches, you can set up path redundancy to address any path failures from host server to switch, or from storage array to switch. 6-25 Multipathing with Fibre Channel By default, ESXi hosts use only one path from a host to a given LUN at any one time. If the path actively being used by the ESXi host fails, the server selects another available path.
The trigger that can be used to quickly identify the issue and alert the administrator so that the issue can be resolved is:
Lost Storage Connectivity
This alert is triggered when an ESXi host loses connectivity to storage devices. In this case, it would alert the administrator to the inconsistent connectivity states of the Fibre Channel adapter12.


質問 # 34
A vSphere environment is experiencing intermittent short bursts of CPU contention, causing brief production outages for some of the virtual machines (VMs). To understand the cause of the issue, the administrator wants to observe near real-time statistics for all VMs.
Which two vSphere reporting tools could the administrator use? (Choose two.)

  • A. esxtop
  • B. esxcli
  • C. Overview Performance Charts
  • D. Advanced Performance Charts
  • E. resxtop

正解:A、E

解説:
Explanation
resxtop and esxtop are command-line tools that can display near real-time statistics for all VMs and other objects on a host or a cluster.
References:
https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vsphere.monitoring.doc/GUID-8FDE7886-4288


質問 # 35
An administrator notices a performance issue in VMvvare vCenter To try and understand more about the performance issue, the administrator needs to gather more information about the vCenter database to eliminate a potential disk space issue.
Which two tools can the administrator use? (Choose two.)

  • A. esxtop
  • B. vSphere Client
  • C. Perfmon
  • D. vCenter Management Interface (VAMI)
  • E. df

正解:D、E

解説:
https://kb.vmware.com/s/article/76563


質問 # 36
Refer to Exhibit:

An environment has the following configuration:
* Resource Pool "RP-MOM? has a reservation of 6GHz and one running virtual machine (VM) "VM-M1? with 1 GHz reserved
* Resource Pool ^RP-KID? has a reservation of 2GHz, and expandable reservations is activated The administrator creates two VMs, "VM-K1? and 'VM-K2?, in the ''RP-KID? resource pool with 2GHz reserved for each, and turns on "VM-M1 ?
Given this scenario, which statement is true?

  • A. VM-K2 cannot be powered on because there are not enough resources in RP-KID.
  • B. The administrator can create a third VM ( VM-K3?) at RP-KID and reserve 6GHz
  • C. The administrator must deactivate expandable reservations to turn on VM-K2
  • D. VM-K2 can be powered on because it can get the resources needed from RP-MOM.

正解:D

解説:
https://docs.vmware.com/en/VMware-vSphere/8.0/vsphere-resource-management/GUID-60077B40-66FF-4625-934A-641703ED7601.html


質問 # 37
An administrator plans to bri ng VMware vCenter offline in order to perform hardware mainte-nance on the host where the vCenter Server Appliance is running.
Which vSphere feature must be configured to ensure that vCenter users experience minimal downtime?

  • A. Enhanced Linked Mode
  • B. vCenter Server High Availability
  • C. vSphere Distributed Resource Scheduler
  • D. Hybrid Linked Mode

正解:B

解説:
Explanation
https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vsphere.avail.doc/GUID-4A626993-A829-495C


質問 # 38
Which VMware offering will allow an administrator to manage the lifecycle of multiple vCenter Server instances in a single software as a service (SaaS)-based solution to help drive operational efficiency?

  • A. VMware vSphere with Tanzu
  • B. VMware vSphere+
  • C. VMware Aria Suite Lifecycle
  • D. VMware Cloud Foundation

正解:C

解説:
Explanation
VMware Aria Suite Lifecycle is a SaaS-based solution that allows an administrator to manage the lifecycle of multiple vCenter Server instances, as well as other VMware products and solutions, from a single console.
References: https://www.vmware.com/products/vrealize-suite-lifecycle-manager.html


質問 # 39
An administrator decides to restore VMware vCenter from a file-based backup following a failed upgrade.
Which interface should the administrator use to complete the restore?

  • A. Direct Console User Interface (DCUI)
  • B. vSphere Client
  • C. vCenter Management Interface (VAMI)
  • D. vCenter GUI Installer

正解:C

解説:
Explanation
The interface that should be used to complete the restore of vCenter Server from a file-based backup is vCenter Management Interface (VAMI), which allows accessing the backup and restore functionality of vCenter Server Appliance.
References:
https://docs.vmware.com/en/VMware-vSphere/7.0/com.vmware.vcenter.install.doc/GUID-8E7C1D6D-8E1E-4D


質問 # 40
......


この試験は、70問から成り、制限時間は130分です。問題は複数選択形式で提示され、vSphereアーキテクチャや技術、仮想マシン管理、ストレージ管理、ネットワーキング、セキュリティ、トラブルシューティングなど、幅広いトピックをカバーしています。試験に合格するには、500点中300点以上のスコアを獲得する必要があります。VMware 2V0-21.23試験は、VMware vSphere 8.x技術とその実際の応用に深い理解が必要な厳しいテストです。

 

確認済み2V0-21.23試験問題集と解答で時間限定無料提供!2V0-21.23には正解付き:https://jp.fast2test.com/2V0-21.23-premium-file.html

あなたを合格させる2V0-21.23無料問題集最新のVMware練習テスト:https://drive.google.com/open?id=18-TZCrLQW3uuZ9YX-3jYqA8mVaW7Wv6e


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어