質問 # 44
A Cycle Time Scatterplot can help you visualize: (choose the best answer)
- A. General Cycle Time trends.
- B. All of the answers.
- C. Individual Cycle Time outliers.
- D. Groups of Cycle Time outliers.
正解:B
質問 # 45
True or False: A team's future performance can be determined by using Little's Law. (Choose the best answer)
- A. FALSE
- B. TRUE
正解:A
質問 # 46
What does the Work Item Aging chart show? (Choose the best answer)
- A. For each item on the Kanban board how long ago has it been pulled into WIP.
- B. The approximate average age of work in process in the team.
- C. How many days has the team worked without breaching the WIP limits.
- D. How many sprints ago has the team revised their WIP limits.
正解:A
質問 # 47
Which of the following is NOT true about cycle time when applied to Scrum? (choose the best answer)
- A. Cycle time should be the same length as the Sprint time-box.
- B. Average cycle time should be shorter than a Sprint time-box.
- C. Cycle time for some Product Backlog items might be longer than the Sprint time-box.
正解:A
質問 # 48
When using Kanban in Scrum, a team needs to use which of the following four metrics of flow? (choose the best four answers)
- A. Throughput
- B. Work in Progress (WIP)
- C. Cycle Time
- D. Cumulative Flow Diagram (CFD)
- E. Lead Time
- F. Work Item Age
正解:A、B、C、F
質問 # 49
True or False: Cycle Time is a lagging indicator.
- A. False
- B. True
正解:B
質問 # 50
Who is best to decide if a Scrum Team should apply a Kanban strategy in their Scrum framework? (choose the best answer)
- A. The Product Owner.
- B. The Director of Engineering.
- C. The Scrum Team.
- D. The Developers.
- E. The Scrum Master.
正解:C
質問 # 51
Which of the following are considered Kanban practices for Scrum Teams? (choose the best answer)
- A. Class of service, measuring cost of delay, visualizing the workflow, limiting Work in Progress (WIP), managing flow.
- B. Visualizing flow, limiting Work in Progress (WIP), actively manage the Work in Progress (WIP), inspecting & adapting the workflow.
- C. Kaizen, removing bottlenecks, policies radiators, pull system.
- D. T-shirt size estimation, service level expectations, limiting Work in Progress (WIP).
- E. Small batch sizes, limiting Work in Progress (WIP), eliminating waste, Kaizen.
正解:B
質問 # 52
Leading indicators: (choose the two best answers)
- A. about the history of a system.
- B. tell us about potential future scenarios in a system.
- C. help us understand and learn from past activities.
- D. provide us with early warning signs that allow us to correct course.
正解:B、D
質問 # 53
What can a specific work item's Cycle Time metric be used for? (choose the best three answers)
- A. To influence the team's Service Level Expectation (SLE).
- B. To help the team inspect and adapt their Sprint in the Daily Scrum.
- C. To help the team inspect and adapt their process.
- D. As a lagging indicator to the length of feedback loop for that Work Item.
- E. As a leading indicator to the length of feedback loop for that Work Item.
正解:A、C、D
質問 # 54
True or False: In a flow-based system, the number of tasks is not necessarily limited, rather the amount of value-generating work items is limited.
- A. False
- B. True
正解:B
質問 # 55
Who is accountable for managing the Kanban board in the Sprint Backlog? (Choose the best answer)
- A. The Product Owner
- B. The Developers
- C. The Scrum Team
- D. The Scrum Master
正解:B
質問 # 56
Which flow metric is most helpful in indicating when multiple Product Backlog items can be completed? (choose the best answer)
- A. Cycle Time.
- B. Work Item Age.
- C. Throughput.
- D. Work in Progress (WIP).
正解:C
質問 # 57
True or False: Kanban is a strategy that complements the Scrum framework with a pull system. The Scrum framework by itself also contains elements of a pull system.
- A. TRUE
- B. FALSE
正解:A
質問 # 58
True or False: The Sprint length can be thought of as the team's batch size with Scrum Teams using Kanban.
- A. FALSE
- B. TRUE
- C. Choose only ONE best answer.
正解:A
質問 # 59
What can happen if the Scrum Team's Work In Progress (WIP) Limit is not honored? (choose the best answer)
- A. Concurrent operations will slow down.
- B. Team throughput increases.
- C. Feedback loops become shorter.
- D. Processes will suffer from inefficiency.
正解:D
質問 # 60
True or False: The primary purpose of measuring Work Item Age is to identify bottlenecks in the workflow that will need to be addressed.
- A. FALSE
- B. TRUE
正解:A
質問 # 61
Which of these be most influential at Sprint Planning? (Choose the best answer)
- A. Cycle Time metrics.
- B. Work Item Age metrics.
- C. Points Delivered metrics.
- D. Throughput metrics.
正解:D
質問 # 62
True or False: If Developers use tasks, then their WIP limits should primarily apply to tasks in the Sprint Backlog.
- A. False
- B. True
正解:A
質問 # 63
Which of the following practices is NOT included in Kanban for Scrum Teams? (choose the best answer)
- A. Identifying bottlenecks and impediments.
- B. Visualizing the workflow.
- C. Limiting Work in Progress (WIP).
- D. Actively managing work in progress.
- E. Inspecting and adapting the workflow.
正解:A
質問 # 64
Which of the following is NOT a metric of flow for Scrum Teams using Kanban? (choose the best answer)
- A. Cycle Time.
- B. All of the above are flow metrics.
- C. Work Item Age.
- D. Work in Progress (WIP).
- E. Throughput.
正解:B
質問 # 65
......