最新のScrum PSK-IのPDFと問題集で(2023)無料試験問題解答 [Q44-Q65]

Share

最新のScrum PSK-IのPDFと問題集で(2023)無料試験問題解答

あなたを合格させるProfessional Scrum with Kanban PSK-I試験問題集で2023年06月02日には140問あります

質問 # 44
A Cycle Time Scatterplot can help you visualize: (choose the best answer)

  • A. General Cycle Time trends.
  • B. All of the answers.
  • C. Individual Cycle Time outliers.
  • D. Groups of Cycle Time outliers.

正解:B


質問 # 45
True or False: A team's future performance can be determined by using Little's Law. (Choose the best answer)

  • A. FALSE
  • B. TRUE

正解:A


質問 # 46
What does the Work Item Aging chart show? (Choose the best answer)

  • A. For each item on the Kanban board how long ago has it been pulled into WIP.
  • B. The approximate average age of work in process in the team.
  • C. How many days has the team worked without breaching the WIP limits.
  • D. How many sprints ago has the team revised their WIP limits.

正解:A


質問 # 47
Which of the following is NOT true about cycle time when applied to Scrum? (choose the best answer)

  • A. Cycle time should be the same length as the Sprint time-box.
  • B. Average cycle time should be shorter than a Sprint time-box.
  • C. Cycle time for some Product Backlog items might be longer than the Sprint time-box.

正解:A


質問 # 48
When using Kanban in Scrum, a team needs to use which of the following four metrics of flow? (choose the best four answers)

  • A. Throughput
  • B. Work in Progress (WIP)
  • C. Cycle Time
  • D. Cumulative Flow Diagram (CFD)
  • E. Lead Time
  • F. Work Item Age

正解:A、B、C、F


質問 # 49
True or False: Cycle Time is a lagging indicator.

  • A. False
  • B. True

正解:B


質問 # 50
Who is best to decide if a Scrum Team should apply a Kanban strategy in their Scrum framework? (choose the best answer)

  • A. The Product Owner.
  • B. The Director of Engineering.
  • C. The Scrum Team.
  • D. The Developers.
  • E. The Scrum Master.

正解:C


質問 # 51
Which of the following are considered Kanban practices for Scrum Teams? (choose the best answer)

  • A. Class of service, measuring cost of delay, visualizing the workflow, limiting Work in Progress (WIP), managing flow.
  • B. Visualizing flow, limiting Work in Progress (WIP), actively manage the Work in Progress (WIP), inspecting & adapting the workflow.
  • C. Kaizen, removing bottlenecks, policies radiators, pull system.
  • D. T-shirt size estimation, service level expectations, limiting Work in Progress (WIP).
  • E. Small batch sizes, limiting Work in Progress (WIP), eliminating waste, Kaizen.

正解:B


質問 # 52
Leading indicators: (choose the two best answers)

  • A. about the history of a system.
  • B. tell us about potential future scenarios in a system.
  • C. help us understand and learn from past activities.
  • D. provide us with early warning signs that allow us to correct course.

正解:B、D


質問 # 53
What can a specific work item's Cycle Time metric be used for? (choose the best three answers)

  • A. To influence the team's Service Level Expectation (SLE).
  • B. To help the team inspect and adapt their Sprint in the Daily Scrum.
  • C. To help the team inspect and adapt their process.
  • D. As a lagging indicator to the length of feedback loop for that Work Item.
  • E. As a leading indicator to the length of feedback loop for that Work Item.

正解:A、C、D


質問 # 54
True or False: In a flow-based system, the number of tasks is not necessarily limited, rather the amount of value-generating work items is limited.

  • A. False
  • B. True

正解:B


質問 # 55
Who is accountable for managing the Kanban board in the Sprint Backlog? (Choose the best answer)

  • A. The Product Owner
  • B. The Developers
  • C. The Scrum Team
  • D. The Scrum Master

正解:B


質問 # 56
Which flow metric is most helpful in indicating when multiple Product Backlog items can be completed? (choose the best answer)

  • A. Cycle Time.
  • B. Work Item Age.
  • C. Throughput.
  • D. Work in Progress (WIP).

正解:C


質問 # 57
True or False: Kanban is a strategy that complements the Scrum framework with a pull system. The Scrum framework by itself also contains elements of a pull system.

  • A. TRUE
  • B. FALSE

正解:A


質問 # 58
True or False: The Sprint length can be thought of as the team's batch size with Scrum Teams using Kanban.

  • A. FALSE
  • B. TRUE
  • C. Choose only ONE best answer.

正解:A


質問 # 59
What can happen if the Scrum Team's Work In Progress (WIP) Limit is not honored? (choose the best answer)

  • A. Concurrent operations will slow down.
  • B. Team throughput increases.
  • C. Feedback loops become shorter.
  • D. Processes will suffer from inefficiency.

正解:D


質問 # 60
True or False: The primary purpose of measuring Work Item Age is to identify bottlenecks in the workflow that will need to be addressed.

  • A. FALSE
  • B. TRUE

正解:A


質問 # 61
Which of these be most influential at Sprint Planning? (Choose the best answer)

  • A. Cycle Time metrics.
  • B. Work Item Age metrics.
  • C. Points Delivered metrics.
  • D. Throughput metrics.

正解:D


質問 # 62
True or False: If Developers use tasks, then their WIP limits should primarily apply to tasks in the Sprint Backlog.

  • A. False
  • B. True

正解:A


質問 # 63
Which of the following practices is NOT included in Kanban for Scrum Teams? (choose the best answer)

  • A. Identifying bottlenecks and impediments.
  • B. Visualizing the workflow.
  • C. Limiting Work in Progress (WIP).
  • D. Actively managing work in progress.
  • E. Inspecting and adapting the workflow.

正解:A


質問 # 64
Which of the following is NOT a metric of flow for Scrum Teams using Kanban? (choose the best answer)

  • A. Cycle Time.
  • B. All of the above are flow metrics.
  • C. Work Item Age.
  • D. Work in Progress (WIP).
  • E. Throughput.

正解:B


質問 # 65
......

PSK-I問題集はProfessional Scrum with Kanban認証済み試験問題と解答:https://jp.fast2test.com/PSK-I-premium-file.html

PSK-I無料試験学習ガイド!(更新された140問あります):https://drive.google.com/open?id=1CTQyqM1zrBDs6WlvghLdrNFZlGplSSm_


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어