
SAP C_IBP_2305認定試験問題集には86練習テスト問題があります
最新C_IBP_2305試験問題集には高得点で一発合格
SAP C_IBP_2305 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
質問 # 47
SAP IBP ensures interoperability with which applications?Note: There are 2 correct answers to this question.
- A. Business Network in SAP Ariba
- B. Financial Planning in SAP Analytics Cloud
- C. User management in SAP Success Factors
- D. Salesforce Sales Cloud
正解:A、B
質問 # 48
What actions can be performed in the Advanced Dashboards application?Note: There are 3 correct answers to this question.
- A. Use drill-down functionality.
- B. Display all assigned analytics on a single UI.
- C. Add process templates.
- D. Link two analytics charts.
- E. Rename the charts.
正解:A、B、C
質問 # 49
Which features apply to quota violations modeled with the optimizer?
- A. Because quota violations shouldn't be possible, the non-delivery cost rate is less than quota violation cost.
- B. Quotas can be modeled for sourcing location, production, and consensus demand.
- C. The optimizer will only violate quotas if quotas are maintained as time-dependent key figures.
- D. Min and Max Quotas have to be the same as sourcing ratios.
正解:A
質問 # 50
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.
- A. Consideration of demand-driven analysis for buffer positioning.
- B. Demand sensing of demand data using predictive analytics tools
- C. Embedded, on-the-fly demand analytics
- D. Detailed statistical analysis of demand data using predictive analytics tools
正解:C、D
質問 # 51
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?
- A. Created as type NVARCHAR and assigned to an external master data type
- B. Created as type INTEGER and assigned to a simple master data type
- C. Created as type DECIMAL and assigned to a compound master data type
- D. Created as type INTEGER and assigned to a compound master data type
正解:C
質問 # 52
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note:
There are 3 correct answers to this question.
- A. It checks whether the required planning level master data exists for a subset of input key figures.
- B. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- C. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- E. It checks whether the sourcing in the Production Source Item Master Data type exists.
正解:A、B、D
質問 # 53
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
- A. Assign the compound master data type and its component master data types.
- B. Configure at least one calculated key figure for the planning area.
- C. Configure at most two input key figures on the same planning level in a key figure calculation.
- D. Specify a planning horizon in the planning area for each level of the assigned time profile.
正解:A、D
質問 # 54
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.
- A. Removing outliers from the sales history of a reference product before transferring its sales to a new product
- B. Merging two locations into a new location
- C. Using the realignment run to identify obsolete data
- D. Changing customer sources and reassigning customers to new DCs
正解:B、D
質問 # 55
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the required planning level master data exists for a subset of input key figures.
- B. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- C. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- E. It checks whether the sourcing in the Production Source Item Master Data type exists.
正解:A、B、D
質問 # 56
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are
2 correct answers to this question.
- A. The key figure is calculated and system editable.
- B. The key figure is stored and system editable.
- C. The key figure is calculated and all editable.
- D. The key figure is stored and all editable.
正解:D
質問 # 57
Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.
- A. Scenario ID
- B. Attributes
- C. Reason code
- D. Key figure type
- E. Modified date
正解:B、C、E
質問 # 58
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.
- A. Demand Sensing with Gradient Boosting (Full)
- B. Supply Heuristics in SAP IBP for sales and operations
- C. Decoupling Points determination in SAP IBP for demand-driven replenishment
- D. Charts creation in SAP Supply Chain Control Tower
正解:A、B
質問 # 59
Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question.
- A. The values of the attribute-based total at the highest attribute level in the planning level can be changed.
- B. The total number of attributes that can use subtotals in the planning view can be restricted.
- C. The total value can be added before or after the selected attribute.
- D. Only attribute-based totals can be added to the planning view.
正解:B、C
質問 # 60
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.
- A. Fixing is possible for system editable key figures.
- B. Fixing is possible for a certain quantity of a key figure value.
- C. Fixing is possible for a certain period, including all child values in the hierarchy.
- D. Fixing is possible for manually editable key figures.
正解:A、C
質問 # 61
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.
- A. Periods are identified by an alphanumeric prefix and profiles by an integer.
- B. Both periods and profiles are identified by a unique integer.
- C. Periods are identified by an integer and profiles by an alphanumeric prefix.
- D. Both periods and profiles have start and end dates.
正解:A、C
質問 # 62
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.
- A. Purge Non-Conforming Data
- B. Purge Master Data
- C. Purge Key Figure Data
- D. Create Time Periods for Time Profiles
正解:B、C
質問 # 63
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.
- A. These filters can be used together with attribute totals in the same planning view.
- B. You can add (or delete) planning objects to a planning view after these filters are applied.
- C. The alerts dashboard is not available if a value-based filter is set for the open planning view.
- D. You can only apply one value-based filter per planning view.
- E. These filters are always applied based on the values stored in the database.
正解:C、D、E
質問 # 64
......
無料提供中C_IBP_2305ブレーン問題集とC_IBP_2305リアル試験問題を試そう:https://jp.fast2test.com/C_IBP_2305-premium-file.html