[Q49-Q64] 100%の合格率を試そう!更新されたのはC_TS4CO_2021試験問題 [2023]

Share

100%の合格率を試そう!更新されたのはC_TS4CO_2021試験問題 [2023]

合格させるC_TS4CO_2021試験にはリアル問題解答

質問 # 49
How does SAP S/4HANA determine if a characteristic value is valid in Profitability Analysis?

  • A. By defining the characteristic value as a key figure
  • B. By defining the characteristic value in the field catalog
  • C. By defining the characteristic value as a value field
  • D. By defining the characteristic value in the check table

正解:D


質問 # 50
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use?

  • A. Costing type
  • B. Costing version
  • C. Reference variant
  • D. Transfer control

正解:D


質問 # 51
How do you maintain number range intervals in Controlling?

  • A. By document type
  • B. By business transactions
  • C. By account type
  • D. By cost element category

正解:B


質問 # 52
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control? Note: There are 2 correct answers to this question.

  • A. The availability of funds in object currency
  • B. The availability of funds on period level
  • C. The availability of funds using overall plan value
  • D. The availability of funds according to tolerance limits

正解:A、D


質問 # 53
At which level do you define the valuation method for results analysis?

  • A. Operating concern
  • B. Company code
  • C. Controlling area
  • D. Plant

正解:C


質問 # 54
How can you define the overhead rate in a costing sheet? Note: There are 2 correct answers to this question.

  • A. As percentage rate
  • B. As equivalence number
  • C. As lot-based surcharge
  • D. As quantity-based surcharge

正解:A、D


質問 # 55
What are the some of the characteristics of Profit Center Accounting in SAP S4/HANA? Note: There are 2 correct answers to this question.

  • A. It can be used in the settlement rule for internal order.
  • B. It can be used with period and/or cost of sale accounting.
  • C. It is integrated in the universal journal.
  • D. It is possible to derive the profit center from the segment in configuration.

正解:B、C


質問 # 56
For which objects can you enter statistical key figures? Note: There are 3 correct answers to this question.

  • A. Cost centers
  • B. Functional areas
  • C. Internal orders
  • D. Cost elements
  • E. Profit centers

正解:A、C、E


質問 # 57
What parameters can you set up when defining order types?

  • A. Define default parameters for master record fields.
  • B. Define document type.
  • C. Define source structure.
  • D. Allow revenue postings.

正解:A、D


質問 # 58
Which scenarios can be covered by one single costing run? Note: There are 2 correct answers to this question.

  • A. Inventory cost estimate of all the materials in one plant
  • B. Standard cost estimate of all the materials in all plants of a controlling area
  • C. Product cost collector cost estimate in one plant
  • D. Current cost estimate of all the materials in all controlling area

正解:A、C


質問 # 59
Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question.

  • A. Price for materials
  • B. Save with date key
  • C. Costing sheet
  • D. Price updates

正解:B、D


質問 # 60
How can you configure the transfer price solution in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Use separate currency types within the same ledger for each valuation.
  • B. Use separate segments for each valuation.
  • C. Use separate CO versions for each valuation.
  • D. Use separate ledgers for each valuation.

正解:C、D


質問 # 61
Which field can you select for both reporting in costing based and account-based Profitability Analysis?

  • A. Cost element
  • B. Value in Controlling Area Currency
  • C. Version
  • D. Record type

正解:C


質問 # 62
You are considering using commitment management with internal orders. What do you need to do in the configuration?

  • A. Activate commitment management only in the controlling area.
  • B. Activate commitment management in both the controlling area and the order type.
  • C. Activate commitment management in the controlling area, the order type, and in individual internal order master data.
  • D. Activate commitment management in both the version and the order type.

正解:B


質問 # 63
What do you need to setup in order to bring the values incoming sales orders into account-based Profitability Analysis?

  • A. An extension ledger of type "Prediction and Commitment"
  • B. A multi-valuation ledger
  • C. A new standard G/L ledger with exclusive usage of "Prediction"
  • D. An extension ledger of type "Simulation"

正解:A


質問 # 64
......

C_TS4CO_2021試験問題を最新版を今すぐ試そうの[2023年最新] 正解回答付き:https://jp.fast2test.com/C_TS4CO_2021-premium-file.html

無料SAP C_TS4CO_2021テスト練習問題試験問題集:https://drive.google.com/open?id=15iW_KbRe4DucOWrGTIzcJqCwiQbH9xuX


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어