質問 24
You are running an indirect activity allocation. What do you post to the sender and receiver?
- A. You post both quantity and cost to the receiver, and cost only to the sender.
- B. You post both quantity and cost to the sender, and cost only to the receiver.
- C. You post quantity and cost to both the sender and receiver.
- D. You post only cost to both the sender and receiver.
正解: C
質問 25
In SAP S/4HANA, you have decided to activate only account-based profitability analysis for your organization. You want to settle costs and revenue of a sales order item to a profitability segment. What do you need to configure?
- A. Cost component structure
- B. Source structure
- C. PA transfer structure
- D. Allocation structure
正解: C
質問 26
Which statements are relevant to the cost of sales accounting method in profitability management? Note:
There are 2 correct answers to this question.
- A. It aims to match revenues for goods and services against sales-related expenses.
- B. It presents the costs and revenues information in a format that is ideal for conducting margin analyses.
- C. It aims to summarize activity and situational change for a given organizational unit over a period of time.
- D. It presents revenues, primary expenses, changes in stock, WIP, and capitalized activities.
正解: A,B
質問 27
You have implemented Product Cost by Sales Oder in conjunction with cost-based POC results analysis in your organization.
For a particular sales order item, you have the following:
Plan revenue = 3000; Plan costs = 2000
Actual revenue = 1200; Actual cost=1000
What data does the system calculate during results analysis?
- A. "Revenue = 1500; Cost of sales = 1000; Revenue surplus =300"
- B. "Revenue = 1200; Cost of sales = 1000; Revenue surplus =200"
- C. "Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300"
- D. "Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 200"
正解: C
質問 28
Which of the following values can be calculated using result analysis? Note: There are 3 correct answers to this question.
- A. Gross margin
- B. Reserves for unrealized costs
- C. Work in progress
- D. Cost of goods manufactured
- E. Cost of sales
正解: B,C,E
質問 29
What master data objects can you set up using time-based fields? Note: There are 2 correct answers to this question.
- A. Activity type
- B. Cost centers
- C. Cost element
- D. Statistical key figures
正解: A,B
質問 30
What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.
- A. You can plan multiple versions.
- B. Availability control can check against plan values.
- C. You can define tolerance limits for plan overspend.
- D. You can enter costs and revenues.
正解: A,D
質問 31
How does the system derive the requirement type from the material master data? Note: There are 2 correct answers to this question.
- A. MRP group -> Strategy group -> planning strategy -> requirements type
- B. Strategy group -> planning strategy -> requirements class -> requirements type
- C. MRP group -> requirements class -> planning strategy -> requirements type
- D. Strategy group -> planning strategy -> requirements type
正解: A,D
質問 32
What can you manage via the account assignment category? Note: There are 2 correct answers to this question.
- A. Valuation of separate sales order stock
- B. Product cost by sales order
- C. Costing variant
- D. Separate sales order stock
正解: A,D
質問 33
You want to create a new standard cost estimate based on the quantity structure of the existing standard cost estimate. Which object do you use?
- A. Costing version
- B. Reference variant
- C. Costing type
- D. Transfer control
正解: D
質問 34
Which statement best describes the Query Browser for reporting?
- A. It is a design studio app that comes as standard SAP Fiori content.
- B. It is the frontend used to define reports in Analysis for Office.
- C. It is a desktop browser that integrates with SAP S/4HANA.
- D. It is available as an additional license product in SAP S/4HANA.
正解: C
質問 35
Which field can you select for both reporting in costing based and account-based Profitability Analysis?
- A. Version
- B. Record type
- C. Value in Controlling Area Currency
- D. Cost element
正解: A
質問 36
How can you configure the transfer price solution in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Use separate ledgers for each valuation.
- B. Use separate segments for each valuation.
- C. Use separate CO versions for each valuation.
- D. Use separate currency types within the same ledger for each valuation.
正解: A,C
質問 37
Which statements best describes a single cost center standard hierarchy?
- A. It is a structure to which all cost center groups created within an operating concern are assigned.
- B. It is a structure to which all cost center groups create for a controlling area are assigned.
- C. It is a structure to which all the cost centers within an operating concern are assigned.
- D. It is a structure to which all the cost centers within a controlling area are assigned.
正解: D
質問 38
For which of the following situations would you need to implement the transfer price solution in SAP S4/NANA?
- A. Parallel accounting is needed in order to be compliant with different accounting principles.
- B. Parallel costing is needed in order to calculate separate costs of goods manufactured for different accounting principles.
- C. Parallel price calculation and invoicing are needed to facilitate intercompany reconciliation.
- D. Parallel variation views of the same logistical flows are needed to differentiate between legal and profit center valuation.
正解: D
質問 39
Which of the following statements apply to SAP S/4HANA embedded analytics? Note: There are 2 correct answers to this question.
- A. It uses core data services (CDS ) views to create virtual data models (VDMs ) for reporting.
- B. It is used by dedicated BI users who need to go beyond the capabilities of Strategic Analysis Tools for reporting.
- C. It is the core SAP S4/HANA license and users the same technical stack and user interface.
- D. It is hosted on the SAP Cloud Platform and integrate seamlessly on the SAP S4/HANA on the Fiori Launchpad.
正解: A,C
質問 40
You create a new profit center. Which company code(s) is it assigned to by default?
- A. All company codes maintained in your authorization profile.
- B. All company codes where profit center accounting is activated.
- C. All company codes within the controlling area.
- D. All company codes to which the profit center standard hierarchy is assigned to.
正解: C
質問 41
Which processes split costs into their primary cost components? Note: There are 2 correct answers to this question.
- A. Business process price calculation
- B. Execution of the assessment cycles
- C. Settlement of internal orders
- D. Cost center/activity type price calculation
正解: A,D
質問 42
You post a billing document for a sales order with sales order controlling. What data flows to Profit Center Accounting? Note: There are 2 correct answers to this question.
- A. Payment Discount
- B. Revenues
- C. Order quantity
- D. Sales deductions
正解: B,D
質問 43
What are the prerequisites for automatic generation of the settlement rule to a market segment for a sales order item? Note: There are 2 correct answers to this question.
- A. Profitability Analysis (CO-PA) is activated.
- B. The sales order item is a cost object.
- C. The material in the sales order item is a service.
- D. The sales order item is assigned to a project.
正解: A,D
質問 44
You create alternative CO versions for your controlling area, in addition to version 0. What would you use additional CO versions for? Note: There are 2 correct answers to this question.
- A. To store data of parallel valuation
- B. To store data of alternative plan costing runs
- C. To store different plan data
- D. To store different budget data
正解: A,C
質問 45
You are configuring internal order settlement. What do you define which cost element should be settled, using either the original settlement cost elements?
- A. Allocation structure
- B. Credit component (of the costing sheet)
- C. Settlement rule
- D. Settlement profile
正解: A
質問 46
You want to setup integrated planning for your internal order. What do you need to do? Note: There are 2 correct answers to this question.
- A. Set the relevant indicator in the planning profile of the order type.
- B. Set the relevant indicator in the internal order master record.
- C. Set the relevant indicators in the CO version.
- D. Set the relevant indicator in the controlling area.
正解: B,C
質問 47
......
C_TS4CO_2021問題集を使って一日でSAP Certified Application Associate試験最速合格:https://jp.fast2test.com/C_TS4CO_2021-premium-file.html