[Q29-Q51] あなたを余裕でC-TS411-2022試験合格させます!100%試験高合格率保証 [2024]

Share

あなたを余裕でC-TS411-2022試験合格させます!100%試験高合格率保証 [2024]

C-TS411-2022問題集本日限定!無料アクセスが可能に!fromFast2test

質問 # 29
You activate the check for same classification inside basic data screen of your class. Which restrictions are available?
Note: There are 2 correct Answers to this question.

  • A. The classification is only checked when you have assigned values to some characteristics.
  • B. The classification is only checked for objects connected to several classes.
  • C. The classification is only checked for objects connected to one class.
  • D. The classification is only checked when you have assigned values to all characteristics.

正解:C、D


質問 # 30
A procedure sets the value V2 for characteristic C2 when the value V1 is set for characteristic C1.How do you assign and define this procedure?Note: There are 3 correct Answers to this question.

  • A. Procedure to the value V1 with the following syntax: $self.C2 = 'V2' (not recommended)
  • B. Procedure to characteristic C2 using the following syntax: $self.C1 = 'V1' if $self.C2 = 'V2' (not recommended)
  • C. Procedure to characteristic C1 using the following syntax: $self.C2 = 'V2' if $self.C1 = 'V1' (not recommended)
  • D. Procedure to the value V2 with the following syntax: $self.C1 = 'V1' (not recommended)
  • E. Procedure with the following syntax to the configuration profile: $self.C2 = 'V2' if $self.C1 = 'V1' (recommended)

正解:A、C、E


質問 # 31
You connected characteristics inside one class to organizational areas. What are the benefits?Note:
There are 2 correct Answers to this question.

  • A. Users can always see all characteristics for all areas.
  • B. A check for the same classification is possible for all organizational areas.
  • C. A check for the same classification is only possible inside one organizational area.
  • D. Users can only work with characteristics depending on the authorization for a particular organizational area.

正解:B、C


質問 # 32
Which features are available when working with the Manage Documents app?Note: There are 2 correct Answers to this question.

  • A. All information is displayed on only one page.
  • B. A secure storage area can be selected manually.
  • C. A secure storage area is selected automatically.
  • D. An object link to every SAP Object can be defined.

正解:A、C


質問 # 33
There are item categories that are only allowed in configurable BOMs.What do you have to keep in mind when working with configurable routings?Note: There are 3 correct Answers to this question.

  • A. All sequence categories can be used in non-configurable and configurable routings.
  • B. All types of operation can be used in non-configurable and configurable routings.
  • C. All production resources/tools catgories can be used in non-configurable and configurable routings.
  • D. Alternative sequences may only be used in configurable routings.
  • E. Equipment as production resources/tools may only be used in configurable routings.

正解:B、D、E


質問 # 34
Which type of object dependencies must contain $self, $parent, or $root at least once?

  • A. Pre- and Selection Conditions
  • B. All types of object dependencies
  • C. Constraints
  • D. Procedures

正解:C


質問 # 35
How can you restrict the search result?Note: There are 2 correct Answers to this question.

  • A. Filters
  • B. Reselect
  • C. Validity
  • D. Change number

正解:A、B


質問 # 36
Where can you specify a processing sequence during an assignment?

  • A. Pre- and Selection Conditions
  • B. Constraint Nets
  • C. Constraints
  • D. Procedures

正解:D


質問 # 37
What do you have to keep in mind when creating a Product Master from scratch?Note: There are 2 correct Answers to this question.

  • A. An industry sector can be selected.
  • B. No view selection screen becomes visible.
  • C. No organizational levels are asked.
  • D. Only files can be connected and uploaded, no document info records.

正解:B、C


質問 # 38
You are working with VC Modeling Environment PMEVC. Complete object dependencies are created by drag & drop of one or more characteristic values into a BOM item.What can be created with this drag & drop functionality?Note: There are 2 correct Answers to this question.

  • A. Local and global object dependencies
  • B. Selection conditions and procedures
  • C. Selection conditions only
  • D. Local object dependencies only

正解:A、B


質問 # 39
You work with a Plan./Production Order without BOM explosion scenario.Which information is available?Note: There are 2 correct Answers to this question.

  • A. In the simulation, information about the BOM and routing is displayed.
  • B. In the simulation, no information about the BOM is displayed except the routing.
  • C. In the sales order, no information about the BOM and routing is displayed.
  • D. In the sales order, no information about the BOM is displayed except the routing.

正解:A、D


質問 # 40
What controls the material BOM item category?Note: There are 2 correct Answers to this question.

  • A. A negative quantity is allowed.
  • B. A work center is required.
  • C. A change number is required.
  • D. A material number is required.

正解:A、D


質問 # 41
You create a new characteristic with numeric values and you only set a single value assignment. You add one interval inside value tab. What does it mean for classification?

  • A. The user can select one value of the interval inside classification.
  • B. The user can set values which don't belong to the interval.
  • C. The user can select an interval inside classification.
  • D. The user can select several values out of the interval inside classification.

正解:A


質問 # 42
Which configuration process/scenario do you use for an Engineer To Order process?

  • A. Planned/Production Order
  • B. Sales Order (SET)
  • C. Engineering Order
  • D. Order BOM

正解:D


質問 # 43
What is a class node?

  • A. Special classes that enable a cross-class search.
  • B. Special classes that are used as an operation in the routing.
  • C. Special classes that are used as nodes in class hierarchies.
  • D. Special classes that are used as items in the BOM.

正解:D


質問 # 44
In a single-level configuration, you want to use a constraint so that if characteristic C1 has the value V1, then characteristic C2 is assigned the value V2.C1 and C2 are assigned to class (300)T_FCL00.What would be a correct complete constraint?

  • A. RESTRICTION: (300)T_FCL00.C2 = 'V2' if (300)T_FCL00.C1 = 'V1'
  • B. RESTRICTION: ?T_FCL00.C2 = 'V2' if ?T_FCL00.C1 = 'V1'
  • C. RESTRICTION: ?C2 = 'V2' if ?C1 = 'V1'
  • D. RESTRICTION: $self.C2 = 'V2' if $self.C1 = 'V1'

正解:A


質問 # 45
Which special feature must be taken into account for the material master of material variants for use in logistics?

  • A. The material master requires a link to the configurable material at plant level.
  • B. The material master requires a connection to the configurable material at client level.
  • C. The material master at client level requires the indicator that it can be configured.
  • D. The material master requires a link to the configurable material at sales area level.

正解:A


質問 # 46
Why do you need a material BOM header status?

  • A. It controls the usage of the material BOM items inside logistic chain.
  • B. It controls the usage of the material BOM by a certain user.
  • C. It controls the usage of the material BOM inside logistic chain.
  • D. It controls the usage of an assembly indicator inside material BOM.

正解:C


質問 # 47
Which scenarios are available with the Maintain Bill of Material app?Note: There are 2 correct Answers to this question.

  • A. Attach a change order.
  • B. Create a Version BOM.
  • C. Display Valid From and Valid To information.
  • D. Define Software Constraints.

正解:B、D


質問 # 48
What objects can be changed with a change number? Note: There are 2 correct Answers to this question.

  • A. Work Centers
  • B. Cost Centers
  • C. Task Lists
  • D. Bills of Material

正解:C、D


質問 # 49
The customer wants to see the cross-plant material status inside the object search in classification. How do you satisfy the customer's requirement?

  • A. Add the cross-plant material status field to the database classification table.
  • B. Create a reference characteristic.
  • C. Change the screen sequence of the classification view.
  • D. Create a custom data type in customizing.

正解:B


質問 # 50
What do you have to keep in mind when overwriting characteristic for a specific class?

  • A. The status of this characteristic is automatically set to incomplete.
  • B. This change applies only to the characteristic, when it is used in this class.
  • C. The status of this characteristic is automatically set to locked.
  • D. This change applies only to the characteristic, when it is used in every class.

正解:B


質問 # 51
......

学習材料は有効なC-TS411-2022効率的問題集:https://jp.fast2test.com/C-TS411-2022-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어