最新のC-TS411-2022学習ガイド2024年最新の- 提供するのはテストエンジンとPDF [Q45-Q67]

Share

最新のC-TS411-2022学習ガイド2024年最新の- 提供するのはテストエンジンとPDF

最新版を今すぐ試そうC-TS411-2022練習テスト問題解答が待ってます

質問 # 45
You can assign object dependencies to different master data.Which assignments have no effect in variant configuration and only affect classification?

  • A. Assignment to Classes
  • B. Assignment to Characteristics
  • C. Assignment to Configuration Profiles
  • D. Assignment to Characteristic Values

正解:D


質問 # 46
Which configuration process/scenario do you use for an Engineer To Order process?

  • A. Order BOM
  • B. Engineering Order
  • C. Sales Order (SET)
  • D. Planned/Production Order

正解:A


質問 # 47
Which prerequisites must be fulfilled before a configuration profile can be created and released for a configurable material?

  • A. Exactly one variant class must be assigned to the configurable material.
  • B. At least one variant class must be assigned to the configurable material. Values must be assigned to the characteristics here.
  • C. At least one variant class must be assigned to the configurable material.
  • D. At least one variant class must be assigned to the configurable material. Values must not be assigned to the characteristics here.

正解:D


質問 # 48
A procedure sets the value V2 for characteristic C2 when the value V1 is set for characteristic C1.How do you assign and define this procedure?Note: There are 3 correct Answers to this question.

  • A. Procedure with the following syntax to the configuration profile: $self.C2 = 'V2' if $self.C1 = 'V1' (recommended)
  • B. Procedure to characteristic C2 using the following syntax: $self.C1 = 'V1' if $self.C2 = 'V2' (not recommended)
  • C. Procedure to the value V1 with the following syntax: $self.C2 = 'V2' (not recommended)
  • D. Procedure to characteristic C1 using the following syntax: $self.C2 = 'V2' if $self.C1 = 'V1' (not recommended)
  • E. Procedure to the value V2 with the following syntax: $self.C1 = 'V1' (not recommended)

正解:A、C、D


質問 # 49
Which item category is only available in configurable BOMs?

  • A. Variable-size item (R)
  • B. Document item (D)
  • C. Non-stock item (N)
  • D. Class item (K)

正解:D


質問 # 50
For which applications can you define formulas inside a Work Center?Note: There are 3 correct Answers to this question.

  • A. Hierarchy
  • B. Capacities
  • C. HR assignment
  • D. Scheduling
  • E. Costing

正解:B、D、E


質問 # 51
Which scenarios are available with the Maintain Bill of Material app?Note: There are 2 correct Answers to this question.

  • A. Define Software Constraints.
  • B. Attach a change order.
  • C. Display Valid From and Valid To information.
  • D. Create a Version BOM.

正解:A、D


質問 # 52
What do you have to keep in mind when copying a group BOM to a plant specific BOM?Note: There are
2 correct Answers to this question.

  • A. The internal BOM number stays unchanged.
  • B. The material component must have a plant assignment.
  • C. The header status has to be active.
  • D. The BOM usage can be changed.

正解:A、B


質問 # 53
You use the app Find Objects in Classes. How do you find a class?Note: There are 2 correct Answers to this question.

  • A. Via change number
  • B. Via Class BOM
  • C. Via assigned characteristics
  • D. Via hierarchy

正解:C、D


質問 # 54
The value assignment interface for variant configuration can be structured using interface design and characteristic groups.What can be used depending on the processing mode?

  • A. You can use interface design and characteristic groups for both processing modes.
  • B. You can only use Interface Design for Processing Mode Classic and Characteristic Groups only for Processing Mode AVC.
  • C. You can use interface design for both processing modes, but characteristic groups only for Processing Mode AVC.
  • D. You can only use Interface Design for Processing Mode AVC and Characteristic Groups for Processing Mode Classic.

正解:B


質問 # 55
Which scenario is possible when you create plant specific data with the Product Master app?

  • A. You can define multiple plant information outside Product Master.
  • B. You can only define one plant information inside Product Master.
  • C. You can define multiple plant information inside Product Master.
  • D. You can only define one plant information outside Product Master.

正解:C


質問 # 56
What is the easiest way to check whether a model is consistent with regard to the processing mode of the configuration profile and object dependencies?

  • A. You use the Check Model function in the (VC modeling Environment PMEVC).
  • B. You use the function Inconsistent VC Models in the app Variant Configuration Overview.
  • C. You use the Check Model function in the Simulate Configuration Models app.
  • D. You use the Extras function in the material configuration (Simul./ModelingCheck Model CU50).

正解:A


質問 # 57
For which objects can you define a status network?Note: There are 2 correct Answers to this question.

  • A. Material master record
  • B. Change record
  • C. Change number record
  • D. Document info record

正解:B、D


質問 # 58
What is the meaning of the operation number in the routing?

  • A. It determines the sequence in which the operations are processed. The increment contains time buffers (float before and after production).
  • B. It determines the sequence in which the operations are processed. The increment has no significance.
  • C. Similar to the BOM, it is only a sort sequence. The increment has no significance.
  • D. It determines the sequence in which the operations are processed. The increment contains wait time and move time.

正解:A


質問 # 59
Which configuration processes/scenarios are supported for both processing modes?

  • A. Plan./Production Order, Order BOM, Sales Order (SET)
  • B. Plan./Production Order, Order BOM only
  • C. Sales Order (SET), Order BOM only
  • D. Plan./Production Order, Sales Order (SET) only

正解:A


質問 # 60
What would be the purpose of classifying Work Centers?

  • A. Work Centers cannot be classified in the standard system.
  • B. Classification inside a Work Center makes it possible to find it for a routing.
  • C. Work Centers must always be classified in the standard system.
  • D. Classification inside a Work Center sets the default value for a routing.

正解:B


質問 # 61
You work with cross-plant and plant-specific Product Master statuses. Which status has the highest priority?

  • A. The cross-plant status.
  • B. The most restrictive status.
  • C. The plant-plant specific status.
  • D. The least restrictive status.

正解:A


質問 # 62
Which organizational level is a Work Center assigned to?

  • A. Client
  • B. Plant
  • C. Storage location
  • D. Production supervisor

正解:B


質問 # 63
Where can you specify a processing sequence during an assignment?

  • A. Pre- and Selection Conditions
  • B. Constraint Nets
  • C. Procedures
  • D. Constraints

正解:C


質問 # 64
What do you have to keep in mind when working with a class hierarchy?Note: There are 2 correct Answers to this question.

  • A. Characteristics are inherited to all subordinate classes.
  • B. You can restrict the value list inherited to your subordinate class.
  • C. Characteristics values stay on their class and are not inherited.
  • D. You can extend the value list inherited to your subordinate class.

正解:A、B


質問 # 65
Working with the document status, what should you keep in mind?Note: There are 2 correct Answers to this question.

  • A. It can be defined as a status network.
  • B. It can be set at object link level.
  • C. It can only be defined plant specific.
  • D. It can be defined depending on document type.

正解:A、D


質問 # 66
What is the significance of the Additional Data tab in class maintenance?

  • A. It only exists for class nodes. It controls the usage in BOMs.
  • B. It only exists for variant classes. It controls the use in configuration profiles.
  • C. It only exists for class nodes. It controls the usage in routings.
  • D. It exists for all class types. It controls the permitted object types.

正解:A


質問 # 67
......

C-TS411-2022問題集と試験テストエンジン:https://jp.fast2test.com/C-TS411-2022-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어