C_TS413_2021問題集合格保証付きの合格できるC_TS413_2021試験2022年更新 [Q44-Q65]

Share

C_TS413_2021問題集合格保証付きの合格できるC_TS413_2021試験2022年更新

C_TS413_2021試験問題集を試そう!ベストC_TS413_2021試験問題トレーニングを提供していますFast2test

質問 44
You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling indicator. The orders should be called 3 months before the planned date. How can you setup the maintenance plan? Note: There are 2 correct answers to this question.

  • A. Set the call horizon to 90 days.
  • B. Set the call horizon to 25%.
  • C. Set the offset to 3 months.
  • D. Set the call horizon to 75%.

正解: B,C

 

質問 45
What can be determined using the offset within a maintenancestrategy?

  • A. The start date of the maintenance order
  • B. The call date for the maintenance order
  • C. The first due date of a maintenance package
  • D. The cycle duration

正解: C

 

質問 46
You want to assign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?

  • A. Free assignment of material is always possible without any prerequisites.
  • B. Assign the BOM usage for free assignment of material in Customizing.
  • C. Assign the header material of a material BOM as assembly to atask list operation.
  • D. Assign the header material of a material BOM to the equipmenttask list header.

正解: B

 

質問 47
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.

  • A. All open reservations are closed when the maintenance order isset to TECO.
  • B. For the combination of order type and planner group you can decide when reservations are created.
  • C. Open reservations can be cleared when a maintenance order operation is finally confirmed.
  • D. Reservations are created only after a material availability checkhas been performed.

正解: A,C

 

質問 48
What does a virtual data model provides

  • A. consumption ready views of data
  • B. A copy of the database optimized for analytical purpose
  • C. Reporting tools for users
  • D. Ready to use business reports

正解: A

 

質問 49
You require stock material to carry out maintenance tasks. Whichof the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct answers to this question.

  • A. Material can be assigned at order header level.
  • B. A control key for internal workforce is required when assigning stock material to an order operation.
  • C. Material can be assigned at order operation level.
  • D. The pick list for materials can be printed before order release.
  • E. A goods receipt can be entered for a technically completed maintenance order.

正解: B,C,E

 

質問 50
You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use?

  • A. Maintenance work center
  • B. Maintenance planner groups
  • C. Controlling area
  • D. Location

正解: B

 

質問 51
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question.

  • A. Type of offset
  • B. Unit of measure
  • C. Start marker
  • D. Object network
  • E. Segment

正解: A,B,C

 

質問 52
Which objects can you use in the safety measure list? Note: Thereare 2 correct answers to this question.

  • A. Permits
  • B. Documents
  • C. Work clearance documents
  • D. Work approval

正解: A,B

 

質問 53
You want to display vehicle-specific data for a piece of equipment. How do you proceed?

  • A. Assign a view profile to the combination of fleet object type and usage type.
  • B. Assign a view profile to the combination of fleet object type and equipment category.
  • C. Define the field selection for the vehicle equipment master data.
  • D. Assign a view profile to an equipment category for fleet equipment.

正解: B

 

質問 54
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.

  • A. False
  • B. True

正解: A

 

質問 55
What do you need to configure to enable entries in the action log ofan equipment?

  • A. Define an additional business view for the equipment category.
  • B. Define the corresponding history-related field for the equipment reference category.
  • C. Select the time segment check box for the equipment category.
  • D. Activate the change documents for the equipment category.

正解: D

 

質問 56
Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question.

  • A. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
  • B. You do NOT have access to the SAP S/4HANA back end system.
  • C. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • D. You have access to the SAP S/4HANA back end system.

正解: B,C

 

質問 57
You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?

  • A. Service entry sheet
  • B. Purchase order
  • C. Invoice
  • D. Goods movement

正解: D

 

質問 58
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.

  • A. Create a measuring point.
  • B. Assign a subordinate piece of equipment.
  • C. Edit classification data and characteristics.
  • D. Assign documents.
  • E. Change a reference location.

正解: A,C,D

 

質問 59
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question.

  • A. Maintenance planner group
  • B. Maintenance work center
  • C. Storage location
  • D. Business partner

正解: B,C

 

質問 60
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question.

  • A. Via the Manage Maintenance Order List SAP Fiori app
  • B. Via the Change Maintenance Order SAP Fiori app
  • C. Within the SAP Fiori-based background job
  • D. Via the multi-level order list (SAP GUI)

正解: C,D

 

質問 61
Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question.

  • A. It can have a maximum length of 50 characters.
  • B. It defines which data is transferred to the lower levels of the hierarchy.
  • C. It defines the allowed characters for a functional location.
  • D. It defines hierarchy levels of the functional location structure.

正解: C,D

 

質問 62
Which of the following is a prerequisite for external refurbishment?

  • A. Select the material group for externally refurbished materials.
  • B. Define the order type for external refurbishment.
  • C. Create the purchasing info record for the external provider.
  • D. Activate the subcontracting indicator in an external activity.

正解: D

 

質問 63
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?

  • A. Scheduling indicator
  • B. Scheduling period
  • C. Lead float
  • D. Call horizon

正解: B

 

質問 64
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.

  • A. Assign an inspection lot to the task list header.
  • B. Assign an inspection document as PRT to the task list operation.
  • C. Assign a piece of equipment with an allocated measuring point to a task list operation.
  • D. Assign a measuring point as a production resources/tools(PRT) to a task list operation.

正解: C,D

 

質問 65
......

最新100%合格率保証付きの素晴らしいC_TS413_2021試験問題PDF:https://jp.fast2test.com/C_TS413_2021-premium-file.html

実践サンプルと問題集指導には2022年最新のC_TS413_2021有効なテスト問題集:https://drive.google.com/open?id=1FRUvMfb6sYMLENQW4Vfx0TTExnUvkgMA


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어