質問 44
You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling indicator. The orders should be called 3 months before the planned date. How can you setup the maintenance plan? Note: There are 2 correct answers to this question.
- A. Set the call horizon to 90 days.
- B. Set the call horizon to 25%.
- C. Set the offset to 3 months.
- D. Set the call horizon to 75%.
正解: B,C
質問 45
What can be determined using the offset within a maintenancestrategy?
- A. The start date of the maintenance order
- B. The call date for the maintenance order
- C. The first due date of a maintenance package
- D. The cycle duration
正解: C
質問 46
You want to assign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?
- A. Free assignment of material is always possible without any prerequisites.
- B. Assign the BOM usage for free assignment of material in Customizing.
- C. Assign the header material of a material BOM as assembly to atask list operation.
- D. Assign the header material of a material BOM to the equipmenttask list header.
正解: B
質問 47
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.
- A. All open reservations are closed when the maintenance order isset to TECO.
- B. For the combination of order type and planner group you can decide when reservations are created.
- C. Open reservations can be cleared when a maintenance order operation is finally confirmed.
- D. Reservations are created only after a material availability checkhas been performed.
正解: A,C
質問 48
What does a virtual data model provides
- A. consumption ready views of data
- B. A copy of the database optimized for analytical purpose
- C. Reporting tools for users
- D. Ready to use business reports
正解: A
質問 49
You require stock material to carry out maintenance tasks. Whichof the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct answers to this question.
- A. Material can be assigned at order header level.
- B. A control key for internal workforce is required when assigning stock material to an order operation.
- C. Material can be assigned at order operation level.
- D. The pick list for materials can be printed before order release.
- E. A goods receipt can be entered for a technically completed maintenance order.
正解: B,C,E
質問 50
You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use?
- A. Maintenance work center
- B. Maintenance planner groups
- C. Controlling area
- D. Location
正解: B
質問 51
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question.
- A. Type of offset
- B. Unit of measure
- C. Start marker
- D. Object network
- E. Segment
正解: A,B,C
質問 52
Which objects can you use in the safety measure list? Note: Thereare 2 correct answers to this question.
- A. Permits
- B. Documents
- C. Work clearance documents
- D. Work approval
正解: A,B
質問 53
You want to display vehicle-specific data for a piece of equipment. How do you proceed?
- A. Assign a view profile to the combination of fleet object type and usage type.
- B. Assign a view profile to the combination of fleet object type and equipment category.
- C. Define the field selection for the vehicle equipment master data.
- D. Assign a view profile to an equipment category for fleet equipment.
正解: B
質問 54
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.
- A. False
- B. True
正解: A
質問 55
What do you need to configure to enable entries in the action log ofan equipment?
- A. Define an additional business view for the equipment category.
- B. Define the corresponding history-related field for the equipment reference category.
- C. Select the time segment check box for the equipment category.
- D. Activate the change documents for the equipment category.
正解: D
質問 56
Which of the following statements are correct for SAP S/4HANACIoud - Asset Management? Note: There are 2 correct answers to this question.
- A. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
- B. You do NOT have access to the SAP S/4HANA back end system.
- C. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
- D. You have access to the SAP S/4HANA back end system.
正解: B,C
質問 57
You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized?
- A. Service entry sheet
- B. Purchase order
- C. Invoice
- D. Goods movement
正解: D
質問 58
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.
- A. Create a measuring point.
- B. Assign a subordinate piece of equipment.
- C. Edit classification data and characteristics.
- D. Assign documents.
- E. Change a reference location.
正解: A,C,D
質問 59
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question.
- A. Maintenance planner group
- B. Maintenance work center
- C. Storage location
- D. Business partner
正解: B,C
質問 60
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question.
- A. Via the Manage Maintenance Order List SAP Fiori app
- B. Via the Change Maintenance Order SAP Fiori app
- C. Within the SAP Fiori-based background job
- D. Via the multi-level order list (SAP GUI)
正解: C,D
質問 61
Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question.
- A. It can have a maximum length of 50 characters.
- B. It defines which data is transferred to the lower levels of the hierarchy.
- C. It defines the allowed characters for a functional location.
- D. It defines hierarchy levels of the functional location structure.
正解: C,D
質問 62
Which of the following is a prerequisite for external refurbishment?
- A. Select the material group for externally refurbished materials.
- B. Define the order type for external refurbishment.
- C. Create the purchasing info record for the external provider.
- D. Activate the subcontracting indicator in an external activity.
正解: D
質問 63
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use?
- A. Scheduling indicator
- B. Scheduling period
- C. Lead float
- D. Call horizon
正解: B
質問 64
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.
- A. Assign an inspection lot to the task list header.
- B. Assign an inspection document as PRT to the task list operation.
- C. Assign a piece of equipment with an allocated measuring point to a task list operation.
- D. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
正解: C,D