リアルC_TS413_2021試験PDFテストエンジン 練習テスト問題 [Q11-Q29]

Share

リアルC_TS413_2021試験PDFテストエンジン 練習テスト問題

SAP C_TS413_2021リアル2023年最新のブレーン問題集で模擬試験問題集


SAP C_TS413_2021(認定アプリケーションアソシエイト - SAP S/4HANAアセットマネジメント)認定試験は、SAP S/4HANAアセット管理モジュールで知識とスキルを実証したい個人向けに設計されています。この認定試験は、SAP S/4HANAの資産管理のすべての重要な側面をカバーするため、資産管理のキャリアを追求することに興味がある人に最適です。

 

質問 # 11
Which of the following is a prerequisite for external refurbishment?

  • A. Select the material group for externally refurbished materials.
  • B. Create the purchasing info record for the external provider.
  • C. Activate the subcontracting indicator in an external activity.
  • D. Define the order type for external refurbishment.

正解:C


質問 # 12
You create two maintenance packages and only one package should be executed at a time. Which parameter determines this?

  • A. Package sequence
  • B. Hierarchy
  • C. Offset
  • D. Subsequent buffer

正解:B


質問 # 13
In which maintenance object can you use an activity type? Note:There are 2 correct answers to this question.

  • A. Maintenance order operation
  • B. Notification activity
  • C. Work center
  • D. Maintenance order header

正解:A、C


質問 # 14
What is the goal of embedded analytics in SAP S/4HANA?

  • A. Combine transactional and analytical processing.
  • B. Integrate SAP BW into SAP S/4HANA.
  • C. Combine the HANA database with SAP BW InfoProviders.
  • D. Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA.

正解:A


質問 # 15
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question.

  • A. Serial data
  • B. Configuration
  • C. Warranty
  • D. Manufacturer data

正解:A、B


質問 # 16
Which steps support the maintenance technician in the Report andRepair Malfunction Fiori app (3 tiles)? Note: There are 3 correct answers to this question.

  • A. Find malfunction records already created in a list.
  • B. Complete the malfunction report.
  • C. Verify planned and actual costs
  • D. Assign production resource tool (PRT) to operation.
  • E. Plan repair work for responsible work center.

正解:A、B、E


質問 # 17
Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order?

  • A. Initial/subsequent buffer
  • B. Package hierarchy
  • C. Package offset
  • D. Call horizon

正解:A


質問 # 18
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.

  • A. SAP QuickViewer
  • B. Plant Maintenance Information Systems (PMIS)
  • C. SAP Lumira
  • D. SAP Crystal Reports

正解:C、D


質問 # 19
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?

  • A. Historical Orders list
  • B. Structure Display
  • C. Location Analysis list
  • D. Usage list

正解:D


質問 # 20
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planneddate if you set the shift factor for early completion to 100%?

  • A. It is postponed by a full cycle (100%).
  • B. It is not shifted.
  • C. It is postponed by 5 days.
  • D. It will be 5 days earlier.

正解:C


質問 # 21
Which statements regarding a maintenance order with status RELare correct? Note: There are 3 correct answers to this question.

  • A. The controller can determine actual cost surcharges.
  • B. Goods receipts for external services can be entered.
  • C. Shop papers can only be printed after the order release.
  • D. The planner can change planned costs at operation level.
  • E. The planner can change estimated costs only at header level.

正解:B、C、D


質問 # 22
How does a performance-based maintenance plan calculate the interval between start date and planned date?

  • A. Cycle length divided by annual performance
  • B. Cycle length divided by (annual performance / 365)
  • C. Cycle length divided by monthly performance
  • D. Cycle length divided by ((scheduling period) x (cycle modification factor))

正解:B


質問 # 23
Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question.

  • A. It defines hierarchy levels of the functional location structure.
  • B. It defines the allowed characters for a functional location.
  • C. It defines which data is transferred to the lower levels of the hierarchy.
  • D. It can have a maximum length of 50 characters.

正解:A、B


質問 # 24
Which valuation category do you use to refurbish a material?

  • A. In-house/external procurement
  • B. Retail
  • C. Condition-based
  • D. Origin

正解:C


質問 # 25
You create a revision for a maintenance event builder (MEB) scenario. Which of the following statements are correct? Note: Thereare 2 correct answers to this question.

  • A. You can assign a network to a revision.
  • B. You must use hierarchical task lists for the MEB scenario.
  • C. You can assign a hierarchical task list to the revision.
  • D. You must assign maintenance notifications to the revision.

正解:C、D


質問 # 26
Which edition allows more extensive customer modifications?

  • A. On-premise edition
  • B. Cloud edition

正解:A


質問 # 27
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question.

  • A. Type of offset
  • B. Unit of measure
  • C. Start marker
  • D. Segment
  • E. Object network

正解:A、B、C


質問 # 28
What is a valid partner type within the partner determinationprocedure?

  • A. Purchasing group
  • B. Business partner (gen.
  • C. Purchasing organization
  • D. Vendor (external)

正解:B


質問 # 29
......


SAP C_TS413_2021試験は、SAP S/4HANAアセットマネジメントの知識とスキルをテストするために設計されています。この認定は、ビル、設備、車両などの物理的な資産を管理および維持することに特化したプロフェッショナルを対象としています。試験は、アセットマスターデータ、アセットトランザクション、償却、報告などの様々なトピックをカバーしています。

 

最速準備で試験合格!C_TS413_2021問題の事前予備:https://jp.fast2test.com/C_TS413_2021-premium-file.html

リリースSAP C_TS413_2021更新された問題PDF:https://drive.google.com/open?id=1FRUvMfb6sYMLENQW4Vfx0TTExnUvkgMA