
C-S43-2023リアルな試験問題C-S43-2023練習問題集
厳密検証されたC-S43-2023試験問題集と解答で無料提供のC-S43-2023問題と正解付き
質問 # 43
What do you have to consider regarding a cross-plant planning scenario?
- A. Multiple maintenance plants are assigned to a planning plant (n: 1).
- B. It is only possible within the same company code.
- C. Only a maximum number of five maintenance plants can be assigned to a planning plant.
- D. Multiple planning plants are assigned to a maintenance plant (m: 1).
正解:A
解説:
A cross-plant planning scenario is a special planning process that allows you to carry out material requirements planning for various plants centrally. This facilitates the production of a product in another plant and it also guarantees a smooth flow of materials between different plants. In a cross-plant planning scenario, you can assign multiple maintenance plants to a planning plant (n: 1) or multiple planning plants to a maintenance plant (m: 1). This means that you can plan and execute maintenance orders in different plants using a common planning plant or a common maintenance plant. There is no limit on the number of maintenance plants that can be assigned to a planning plant, so answer B is incorrect. A cross-plant planning scenario is also possible across different company codes, as long as the plants belong to the same controlling area. Therefore, answer D is also incorrect. References: Cross-Plant Planning | SAP Help Portal and SAP S
/4HANA Asset Management: Plants from a Maintenance ... - SAP PRESS
質問 # 44
Which steps are available for the maintenance technician when using the Report Malfunction bile? Note:
There are 3 correct answers to this question.
- A. Add a URL to provide further information
- B. Select and print the maintenance order shop papers
- C. View details of the technical object by navigating to the Asset Viewer
- D. Input estimated costs for repair malfunction
- E. Display the current location of the technical object
正解:A、C、E
解説:
The Report Malfunction app allows the maintenance technician to perform the following steps when reporting a malfunction of a technical object:
* Display the current location of the technical object. The app shows the geographical location of the technical object on a map, if the Geographical Enablement Framework is activated. This helps the technician to locate the technical object and plan the travel route1
* Add a URL to provide further information. The app allows the technician to attach a URL to the malfunction report, such as a link to a video or a website that shows the problem or the solution. This helps the technician to provide additional information and documentation for the malfunction1
* View details of the technical object by navigating to the Asset Viewer. The app allows the technician to access the Asset Viewer app from the malfunction report, where they can view the technical object details, such as the structure, documents, history, and measurements. This helps the technician to gather information about the technical object and its condition1 The Report Malfunction app does not allow the maintenance technician to perform the following steps when reporting a malfunction of a technical object:
* Select and print the maintenance order shop papers. The app does not provide the option to select and print the maintenance order shop papers. The technician can use a different app, such as "Manage Maintenance Orders", to print the shop papers2
* Input estimated costs for repair malfunction. The app does not provide the option to input estimated costs for repair malfunction. The technician can use a different app,such as "Manage Maintenance Orders", to enter the planned costs for the maintenance order2 References: 1: Report and Repair Malfunction | SAP Help Portal 2: Manage Maintenance Orders | SAP Help Portal
質問 # 45
How does a performance-based maintenance plan calculate the interval between start date and planned date?
- A. Cycle length divided by (monthly performance x 12)
- B. Cycle length divided by (annual performance/365)
- C. Cycle length divided by annual performance
- D. Cycle length divided by ((scheduling period) x (cycle modification factor))
正解:B
質問 # 46
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question
- A. Via cost center and activity type
- B. Via activity type and hourly rate
- C. Via organizational unit and personal hourly rate
- D. Via cost center assigned to a personnel number
正解:A、B
解説:
The work center influences cost calculation in the maintenance order via the cost center and activity type, and via the activity type and hourly rate. The cost center and activity type are assigned to the work center in the master data, and they determine the planned costs of the work center. The activity type and hourly rate are used to calculate the actual costs of the work center based on the actual hours reported for the maintenance order operations.
Option A (Via cost center assigned to a personnel number) is incorrect, because the cost center assigned to a personnel number is not relevant for the cost calculation of the work center. Option C (Via organizational unit and personal hourly rate) is also incorrect, because the organizational unit and personal hourly rate are not used to calculate the costs of the work center.
References:
* Cost Centers and Activity Types
* Work Center Utilization
質問 # 47
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)?
Note: There are 3 correct answers to this question.
- A. Complete the malfunction report
- B. Plan repair work for the responsible work center
- C. Find malfunction records already created in a list
- D. Assign a production resource tool (PRT) to the operation
- E. Verify planned and actual costs
正解:A、B、C
解説:
Maintenance Processing - Basic Functions
質問 # 48
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100%.
Which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A. Technical completion date of the maintenance order
- B. Actual finish date of the maintenance order
- C. Planned date of the next call, independent of maintenance order dates
- D. The date of the final confirmation
正解:A
解説:
Preventive Maintenance
質問 # 49
Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question
- A. You have access to the SAP S/4HANA back-end system
- B. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
- C. You do NOT have access to the SAP S/4HANA back-end system.
- D. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network
正解:B、C
解説:
SAP S/4HANA Asset Management, Public Cloud Edition is a cloud-based solution that offers a simplified and standardized configuration of the system via the self-service configuration UI. You can use this UI to adjust the system settings according to your business needs. You do not have access to the SAP S/4HANA back-end system, as it is managed by SAP. SAP Asset Intelligence Network is a separate cloud-based solution that connects manufacturers, operators, and service providers of physical assets. You can use SAP Asset Intelligence Network to share and exchange asset information, but you cannot use it to configure SAP S
/4HANA Cloud. References:
* SAP S/4HANA Cloud, Public Edition - SAP Learning
* SAP S/4HANA Cloud for Asset Management, Public Edition
質問 # 50
Which objects can you assign to a Maintenance Service Order Item? Note: There are 2 correct answers to this question.
- A. Service Work Center
- B. Service Master Record
- C. DIP Profile
- D. Service Product
正解:C、D
質問 # 51
How does the work center influence cost calculation in the maintenance order?
Note: There are 2 correct answers to this question.
- A. Via cost center and activity type
- B. Via activity type and hourly rate
- C. Via organizational unit and personal hourly rate
- D. Via cost center assigned to a personnel number
正解:A、B
解説:
Organizational Units and Master Data
質問 # 52
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?
- A. Within the SAP Fion-based background job
- B. Via the SAP Fiori app "Maintenance Scheduling Board"
- C. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
- D. Via the SAP Fiori app "Manage Maintenance Order List"
正解:A、D
質問 # 53
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question
- A. SAP Service and Asset Manager (formerly SAP Asset Manager)
- B. SAP Work Manager
- C. Worker Safety applications
- D. SAP Asset Performance Management
正解:A、D
解説:
SAP Intelligent Asset Management is a cloud-based solution that comprises of five components1:
* SAP Asset Intelligence Network: A central repository for asset information that facilitates collaborative asset management and leverages the Internet of Things (IoT).
* SAP Predictive Maintenance and Service: A tool that combines sensor and business data, machine learning, and engineering simulations to optimize asset performance and reduce downtimes.
* SAP Asset Strategy and Performance Management: A tool that measures and improves asset performance and enhances maintenance strategies.
* SAP Predictive Engineering Insights: A tool that uses digital twin technologies and finiteelement analysis to monitor asset health and predict failures.
* SAP Service and Asset Manager (formerly SAP Asset Manager): A mobile app that provides online and offline access to asset management processes and data.
Among the given options, only B and D are components of SAP Intelligent Asset Management. A and C are not part of the cloud-based solution, but rather standalone applications that can be integrated with SAP S
/4HANA Asset Management or other SAP solutions. References: 1: This Article Introduces SAP Intelligent Asset Management
質問 # 54
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time - key date.
The orders should be called 3 months before the planned date.
How can you set up the maintenance plan?
Note: There are 2 correct answers to this question.
- A. Set the call horizon to 25%.
- B. Set the call horizon to 90 days.
- C. Set the offset to 3 months.
- D. Set the call horizon to 75%.
正解:A
解説:
Preventive Maintenance
質問 # 55
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question
- A. Within a maintenance order
- B. In the material reservation list in inventory management
- C. In the list editing (single-level) for maintenance orders
- D. In the report Material: Where-Used List
正解:A、C
解説:
You can see the results of the material availability check for maintenance orders in two places: within a maintenance order and in the list editing (single-level) for maintenance orders.
* Within a maintenance order, you can see the material availability status for each component in the Components tab. The status can be one of the following: Available, Not Available, Partially Available, or Not Checked. You can also see the availability date, which is the date on which the component can be fully available. You can access the maintenance order from the Manage Maintenance Orders app or the Change Maintenance Order app1.
* In the list editing (single-level) for maintenance orders, you can see the material availability status for each order in the Material Availability column. The status can be one of the following: Available, Not Available, Partially Available, or Not Checked. You can also see the availability date, which is the date on which all the components for the order can be fully available. You can access the list editing from the List Editing (Single-Level) for Maintenance Orders app2.
References: 1: Checking the Material Availability Status 2: [List Editing (Single-Level) for Maintenance Orders]
質問 # 56
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents.
What do you need to do?
Note: There are 2 correct answers to this question.
- A. Assign a piece of equipment with an allocated measuring point to a task list operation.
- B. Assign an inspection document as a PRT to the task list operation.
- C. Assign a measuring point as a production resources/tools (PRT) to a task list operation.
- D. Assign an inspection lot to the task list header.
正解:A、C
解説:
Preventive Maintenance
質問 # 57
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct answers to this question
- A. The cost center of the superior equipment
- B. The cost center of the related maintenance work center
- C. The reference functional location of the superior functional location
- D. The individual maintenance of the cost center in the equipment master record
正解:A、D
質問 # 58
You want to display vehicle-specific data for a piece of equipment. How do you proceed?
- A. Assign a view profile to the combination of vehicle type and equipment category.
- B. Assign a view profile to an equipment category for fleet equipment.
- C. Assign a view profile to the combination of equipment category and vehicle class.
- D. Set the relevant flags in Customizing activity "Define Additional Business Views for Equipment Categories".
正解:A
質問 # 59
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question
- A. Assign a serial number profile to an additional business view for equipment category
- B. Assign a serial number profile to the equipment category
- C. Maintain a serial number for an existing equipment master.
- D. Add a serialized material to the equipment serial data view.
- E. Assign a serial number profile to the related material master.
正解:B、C、E
解説:
Serializing a piece of equipment means assigning a unique serial number to identify and track the equipment throughout its lifecycle. The prerequisites for serializing a piece of equipment are:
* Assign a serial number profile to the equipment category. This defines the rules for creating and managing serial numbers for the equipment, such as the number range, the check digit, and the serial number usage. The serial number profile is assigned in the Customizing activity Define Equipment Categories under Plant Maintenance and Customer Service -> Master Data in Plant Maintenance and Customer Service -> Technical Objects -> Equipment -> Equipment Categories.
* Assign a serial number profile to the related material master. This ensures that the material and the equipment have the same serial number profile and that the serial number is automatically copied from the material to the equipment. The serial number profile is assigned in the material master data in the Plant Data/Stor. 1 view under Serial Number Profile.
* Maintain a serial number for an existing equipment master. This can be done either manually or automatically. Manually, you can enter the serial number in the equipment master data in the Serial Data view under Serial Number. Automatically, you can link the equipment with a serialized material and the serial number will be copied from the material to the equipment. This linking can be done either with a goods movement or manually.
The options that are not prerequisites for serializing a piece of equipment are:
* Add a serialized material to the equipment serial data view. This is not a prerequisite, but rather a possible way to link the equipment with a serialized material and copy the serial number from the material to the equipment. However, this can only be done if the serial number profile is already assigned to both the equipment category and the material master.
* Assign a serial number profile to an additional business view for equipment category. This is not a valid option, as the serial number profile is assigned to the equipment category itself, not to any additional business view.
References:
* Serial Number Management
* Explaining Refurbishment of Spare Parts
質問 # 60
What do you have to consider when implementing UI technologies in SAP S/4HANA Asset Management?
Note: There are 2 correct answers to this question.
- A. The cloud version can also use SAP GUI for Windows.
- B. SAP GUI for HTML can be used in the SAP Fiori launchpad.
- C. Web Dynpro apps can be used in the SAP Fiori launchpad.
- D. SAP Fiori launchpad supports only SAPUI5 apps.
正解:B、C
解説:
User Interface and Mobile Maintenance
質問 # 61
Which SAP UI technology is used for the Report and Repair Malfunction app?
- A. Business Server Pages
- B. SAPUI5
- C. Web Dynpro
- D. SAP GUI for HTML
正解:B
解説:
The Report and Repair Malfunction app is a Fiori app that uses SAPUI5 as the UI technology. SAPUI5 is a modern, HTML5-based, JavaScript UI library that enables developers to create rich and responsive web applications. Web Dynpro, SAP GUI for HTML, and Business Server Pages are older UI technologies that are not used for Fiori apps. References:
* Report and Repair Malfunction | SAP Help Portal
* First Fiori App for Maintenance Technician: "Report and Repair Malfunction" for SAP S/4HANA Cloud 1708 and 1709 | SAP Blogs
質問 # 62
Which of the following parameters are available when you define a new maintenance plan category? Note:
There are 3 correct answers to this question.
- A. Call object
- B. Change documents
- C. Completion data
- D. Maintenance activity type
- E. Order type
正解:A、B、C
質問 # 63
A Task List contains two operations:
. Every 3 MON: pump inspection
. Every 24 MON: pump replacement
When replacing the pump, the operation pump inspection will be ignored.
How can you achieve this?
- A. Set the lead float
- B. Assign different hierarchy levels
- C. Create a task list hierarchy
- D. Create a cycle set sequence
正解:B
解説:
Preventive Maintenance
質問 # 64
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question
- A. Assign documents
- B. Assign a subordinate piece of equipment.
- C. Edit classification data and characteristics.
- D. Change a reference location.
- E. Create a task list for functional location
正解:A、C、D
解説:
The SAP Fiori app "Create Technical Object" allows you to create a new functional location and perform the following actions:
* Edit classification data and characteristics. You can assign a class to the functional location and enter values for the characteristics of the class. This helps you to categorize and search for functional locations based on their attributes1
* Assign documents. You can attach documents to the functional location, such as drawings, manuals, or certificates. This helps you to provide additional information and documentation for the functional location1
* Assign a subordinate piece of equipment. You can assign an existing piece of equipment as a subordinate object to the functional location. This helps you to establish a hierarchical structure of technical objects and show the relationship between them1 The SAP Fiori app "Create Technical Object" does not allow you to perform the following actions:
* Create a task list for functional location. You cannot create a task list for the functional location using this app. You need to use a different app, such as "Manage Task Lists", to create and maintain task lists for technical objects2
* Change a reference location. You cannot change the reference location of the functional location using this app. You need to use a different app, such as "Change Functional Location", to modify the reference location of an existing functional location3 References: 1: Create Technical Object | SAP Help Portal 2: [Manage Task Lists | SAP Help Portal] 3:
[Change Functional Location | SAP Help Portal]
質問 # 65
Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question.
- A. You have access to the SAP S/4HANA back-end system.
- B. You do NOT have access to the SAP S/4HANA back-end system.
- C. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
- D. You can configure SAP S/4HANA Cloud via the SAP Central Business Configuration (CBC).
正解:B、D
解説:
Organizational Units and Master Data
質問 # 66
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question.
- A. Maintain settings at plant level for usage decisions.
- B. Create a control key which expects inspection characteristic assignments.
- C. Assign an Inspection Type to a Maintenance Order Type.
- D. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant.
正解:A、C
解説:
Maintenance Processing - Advanced Functions
質問 # 67
Which of the following is a prerequisite for external refurbishment?
- A. Activate the subcontracting indicator in an external activity.
- B. Define the order type for external refurbishment.
- C. Select the material group for externally refurbished materials.
- D. Assign an external work center to a maintenance order operation.
正解:A
解説:
Maintenance Processing - Advanced Functions
質問 # 68
......
SAP C-S43-2023 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
無料でゲット!高評価SAP C-S43-2023試験問題集を今すぐダウンロード!:https://jp.fast2test.com/C-S43-2023-premium-file.html