
[2024年11月] 問題集簡単概要C-S43-2023試験問題Fast2test
C-S43-2023トレーニング認証最新版をゲットSAP Certified Associate
質問 # 15
You want to create a new functional location.
Which setting is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question.
- A. Usage period
- B. Status profile
- C. Warranty category
- D. Object information
- E. Measuring point category
正解:B、D、E
解説:
Technical Objects
質問 # 16
To which objects can a personnel number be directly assigned?
Note: There are 2 correct answers to this question.
- A. Work center
- B. Business partner
- C. Planner group
- D. Maintenance plan
正解:A、B
解説:
Organizational Units and Master Data
質問 # 17
You want to create a maintenance order with an external order operation that includes service items.
How can you achieve this? Note: There are 2 correct answers to this question
- A. The assignment of a control key with the service indicator set is mandatory
- B. The assignment of a control key with key externally processed operation is sufficient.
- C. The actual value entry can be recorded only via the service entry sheet
- D. The usage of a model service specification is mandatory.
正解:B、C
質問 # 18
To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?
- A. Work center
- B. Business partner
- C. Planner group
- D. Maintenance plan
正解:A、B
解説:
* A personnel number is a unique identifier for an employee in the SAP system. A personnel number can be directly assigned to the following objects:
* C. Work center. A work center is a location where maintenance activities are performed. A work center can have one or more personnel numbers assigned to it, which represent the employees who work at that location. The personnel numbers can be used for capacity planning, scheduling, and confirmation of maintenance orders1.
* D. Business partner. A business partner is a person or an organization that has a business relationship with the company. A business partner can have one or more roles, such as customer, vendor, or contact person. A personnel number can be assigned to a business partner role, which allows the system to identify the employee who is responsible for the business partner or who acts as a contact person for the business partner2.
* A personnel number cannot be directly assigned to the following objects:
* A. Planner group. A planner group is a group of employees who are responsible for planning and processing maintenance orders. A planner group is assigned to a maintenance order header, but not to a personnel number. A planner group can have one or more work centers assigned to it, which in turn can have personnel numbers assigned to them3.
* B. Maintenance plan. A maintenance plan is a document that defines the frequency and scope of preventive maintenance activities for technical objects. A maintenance plan is assigned to a maintenance item, which contains the technical object and the task list for the maintenance activities. A maintenance plan does not have a direct assignment to a personnel number, but it can have a planner group assigned to it, which can have work centers and personnel numbers assigned to it. References: 1: Work Center 2: Business Partner 3: Planner Group : [Maintenance Plan]
質問 # 19
What do you have to consider when planning maintenance work that is to be carried out by an external company?
- A. For the maintenance order type, you have to assign the Enhanced Procurement Mode.
- B. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
- C. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
- D. In the control key assigned to the order operation, the "Service" indicator must always be activated.
正解:D
解説:
Maintenance Processing - Basic Functions
質問 # 20
You settle a refurbishment order with the batches (valuation types) having price control standard price.
What is the effect?
Note: There are 2 correct answers to this question.
- A. The effective costs are posted to the respective batch (valuation type).
- B. The goods receipt for the batch refurbished is posted with the value of the moving average price.
- C. The goods receipt for the batch refurbished is posted with the value of the standard price.
- D. The effective costs are posted as a credit memo to a price difference account.
正解:C、D
解説:
Maintenance Processing - Advanced Functions
質問 # 21
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question
- A. Via activity type and hourly rate
- B. Via cost center assigned to a personnel number
- C. Via organizational unit and personal hourly rate
- D. Via cost center and activity type
正解:A、D
解説:
The work center influences cost calculation in the maintenance order via the cost center and activity type, and via the activity type and hourly rate. The cost center and activity type are assigned to the work center in the master data, and they determine the planned costs of the work center. The activity type and hourly rate are used to calculate the actual costs of the work center based on the actual hours reported for the maintenance order operations.
Option A (Via cost center assigned to a personnel number) is incorrect, because the cost center assigned to a personnel number is not relevant for the cost calculation of the work center. Option C (Via organizational unit and personal hourly rate) is also incorrect, because the organizational unit and personal hourly rate are not used to calculate the costs of the work center.
References:
* Cost Centers and Activity Types
* Work Center Utilization
質問 # 22
Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note:
There are 3 correct answers to this question.
- A. SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP.
- B. SAP Service and Asset Manager is available only for the iOS platform.
- C. SAP Service and Asset Manager can be used offline.
- D. SAP Service and Asset Manager provides single sign-on functionality.
- E. SAP Service and Asset Manager can run on smart watches.
正解:A、C、D
解説:
User Interface and Mobile Maintenance
質問 # 23
You want to have several plan dates calculated in a maintenance plan.
Which scheduling parameter do you use?
- A. Scheduling period
- B. Scheduling indicator
- C. Call horizon
- D. End Date for Scheduling
正解:A
解説:
Preventive Maintenance
質問 # 24
Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?
- A. Warranty
- B. Serial data
- C. Configuration
- D. Manufacturer data
正解:A、D
解説:
An equipment category defines the technical characteristics of an equipment and the views that are available for it. A view profile is a set of views that can be assigned to an equipment category. The views that can be assigned to an equipment category via a view profile are:
* Basic data
* Classification
* Location
* Organization
* Partner
* Status
* Structure
* Warranty
* Manufacturer data
* Measurement document
* History
* Permits
* Documents
* User fields
* Serial data
* Configuration
* Object links
* Time-dependent data
* Linear data
* Geographical data
* Maintenance plan
* Maintenance item
* Maintenance task list
* Maintenance order
* Maintenance notification
* Service order
* Service notification
* Service contract
* Service confirmation
* Service quotation
* Service request
* Service plan
* Service item
* Service task list
* Service product
* Service product allocation
* Service product structure
* Service product location
* Service product partner
* Service product status
* Service product classification
* Service product documents
* Service product permits
* Service product user fields
* Service product serial data
* Service product configuration
* Service product object links
* Service product time-dependent data
* Service product linear data
* Service product geographical data
Among these views, the ones that match the options given in the question are Warranty and Manufacturer data. Therefore, the correct answers are A and D.
References:
* SAP Help Portal - Equipment Category
* SAP Help Portal - View Profile
質問 # 25
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note:
There are 2 correct answers to this question
- A. Complete
*Close Report - B. Schedule
*Dispatch - C. Release
*Start Work - D. Release
*Print
正解:A、C
解説:
* The Report and Repair Malfunction SAPUI5 app is a Fiori app that allows the technician to easily report that a technical object has a malfunction, plan the required repair work, as well as document and confirm the maintenance work when it's done1. With this app, the technician can perform the following activities:
* C. Complete and Close Report. This is true because the technician can provide information about the malfunction and the job, confirm the job, and close the malfunction report. The technician can also attach pictures or descriptions of the damage, as well as a URL to provide further information about the technical object or the damage1.
* D. Release and Start Work. This is true because the technician can release the malfunction report and start working on the job assigned to them. The technician can also view the details of the technical object, the history of recent repair work, the required spare parts, and the work centers involved1.
* The technician cannot perform the following activities with this app:
* A. Schedule and Dispatch. This is false because these activities are performed by the planner or the dispatcher, not the technician. The planner or the dispatcher can use the Resource Scheduling app to schedule and dispatch the maintenance orders and operations2.
* B. Release and Print. This is false because the technician can only release the malfunction report, not print it. The technician can use the Repair Malfunctions - My Job List app to view the list of all work items assigned to them and their current status, but not to print them1. References
: 1: Report and Repair Malfunction 2: Resource Scheduling
質問 # 26
What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question.
- A. The call date for the maintenance order
- B. A one-time shift of a maintenance package
- C. A preliminary buffer shifting the reference date of the maintenance order
- D. The first due date of a maintenance package
正解:D
解説:
Preventive Maintenance
質問 # 27
What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note: There are 3 correct answers to this question
- A. Overall costs are dynamically summed up on the header level.
- B. A technical object must be assigned to an order operation
- C. Purchase requisitions have the operation as account assignment.
- D. The settlement rule is maintained on the header level.
- E. Costs are stored only for the operation object
正解:A、B、E
解説:
Orders with Operation Account Assignment (OAA) are a special type of PM/CS orders that allow the detailed planning, capture and reporting of costs at the order operation level. The operations have their own settlement rules enabling more accurate cost updating of multiple assets maintained using a single PM/CS order. The mandatory characteristics of OAA orders are:
* A technical object must be assigned to an order operation. This ensures that the operation is linked to a specific asset and can be settled accordingly. The technical object can be an equipment, a functional location, or a material.
* Costs are stored only for the operation object. This means that the order header does not have any costs associated with it. The costs are allocated to the operations based on the actual postings of goods movements, confirmations, and invoices.
* Purchase requisitions have the operation as account assignment. This means that the purchase requisitions created from the order components are assigned to the operation instead of the order header. This allows the tracking of costs at the operation level.
The characteristics that are not mandatory for OAA orders are:
* Overall costs are dynamically summed up on the header level. This is an optional feature that can be activated by using the business function LOG_EAM_SIMPLICITY_2. This allows the display of the total costs of the order operations on the order header level.
* The settlement rule is maintained on the header level. This is not a characteristic of OAA orders, but rather a limitation. The settlement rule for OAA orders can only be maintained on the operation level, not on the header level. This means that each operation has its own settlement rule and can be settled to different receivers.
References:
* Operation Account Assignment
* Operation Account Assignment 2
質問 # 28
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.
- A. An Inspection Plan and a technical object must be assigned to the same class.
- B. An object list must have been generated manually or automatically.
- C. A checklist type must be assigned to the maintenance order header.
- D. A PM task list with inspection point type must be assigned to the maintenance order.
正解:A、D
解説:
Maintenance Processing - Advanced Functions
質問 # 29
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.
- A. Scheduling period
- B. Scheduling indicator
- C. Start date
- D. Factory calendar
正解:A、C
質問 # 30
......
認証トレーニングC-S43-2023試験問題集テストエンジン:https://jp.fast2test.com/C-S43-2023-premium-file.html