
C-IBP-2305試験問題を今すぐ試そう!最新の[2024年最新] 正解回答付き
練習できるC-IBP-2305には認定ガイド問題と解答とトレーニングを提供しています
質問 # 39
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
- A. Configure at least one calculated key figure for the planning area.
- B. Assign the compound master data type and its component master data types.
- C. Specify a planning horizon in the planning area for each level of the assigned time profile.
- D. Configure at most two input key figures on the same planning level in a key figure calculation.
正解:B、C
質問 # 40
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.
- A. Create additional test planning areas in the production system to support cutover needs.
- B. Set up a three-tier landscape using transport, starting from the development system to test and production.
- C. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
- D. Create additional planning areas in the test system to support training needs.
正解:B、C
質問 # 41
You created a key figure and want to add calculations.Which of the following rules do you consider?Note:
There are 2 correct answers to this question.
- A. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- C. Key figures can be calculated across different planning levels.
- D. The calculation chain for a key figure must always result in a calculated key figure.
正解:A、C
質問 # 42
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.
- A. Disaggregation in batch triggered by an application job
- B. Disaggregation according to a helper key figure
- C. Proportional disaggregation by using KF2 in the expression
- D. Disaggregation according to a user-defined expression
- E. Disaggregation according to an equal split
正解:C、D、E
質問 # 43
Which processes are running in sample planning area SAPIBP1? Note: There are 3 correct answers to this question.
- A. Sales and Operations Planning
- B. Demand Sensing
- C. Response Planning
- D. Inventory Optimization
- E. Supply and Allocation Planning
正解:A、B、D
質問 # 44
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?
- A. A planning area with its time profile must be bundled in one collection.
- B. Configuration items should be bundled in the collections based on the SAP IBP project stream.
- C. You should delete collections after they have been transported.
- D. A planning area with the copy operators assigned must be bundled in one collection.
正解:A、D
質問 # 45
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.
- A. Purge Master Data
- B. Create Time Periods for Time Profiles
- C. Purge Key Figure Data
- D. Purge Non-Conforming Data
正解:A、C
質問 # 46
For your project, you create a new planning area and consider how to create analytics and alerts for it.How can you create these objects?
- A. Use the option for copying analytics and alerts into the new planning area from the existing custom planning area.
- B. Create analytics and alerts in the new planning area from scratch using the Intelligent Visibility application.
- C. Use the option for copying analytics and alerts when creating a new planning area from the sample SAPIBP1.
- D. Merge analytics and alerts into a new planning area from any sample planning area.
正解:C
質問 # 47
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note:
There are 2 correct answers to this question.
- A. Supply Heuristics in SAP IBP for sales and operations
- B. Decoupling Points determination in SAP IBP for demand-driven replenishment
- C. Demand Sensing with Gradient Boosting (Full)
- D. Charts creation in SAP Supply Chain Control Tower
正解:A、C
質問 # 48
You are implementing SAP IBP to plan for a supply chain that experiences high seasonality.What supply planning operators can be used in your model to plan stock pre-builds?
- A. Supply optimizer and supply heuristics
- B. Supply optimizer only
- C. Finite and infinite heuristics
- D. Finite heuristics only
正解:A
質問 # 49
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.
- A. Supply chain graph in Supply Chain Network app
- B. Snapshot operator in the SAP IBP add-in for Microsoft Excel
- C. Planning view templates in the SAP IBP add-in for Microsoft Excel
- D. Jobs in the Applications Jobs app
正解:C、D
質問 # 50
How many different time levels can be selected within one planning view?
- A. Only base time levels of the planning area
- B. All time levels available in the time profile, restricted by global configuration parameter
- C. Only time levels from the base planning level of selected key figures
- D. All time levels available in the time profile
正解:D
質問 # 51
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- C. Key figures can be calculated across different planning levels.
- D. The calculation chain for a key figure must always result in a calculated key figure.
正解:A、C
質問 # 52
You want to display and edit data in different Units of Measure (UOM).Which of the following must you consider before you use the UOM?Note: There are 3 correct answers to this question.
- A. Units of measure are usually not time-dependent.
- B. Unit of measure is an attribute of a master data type, such as Product.
- C. Analytics provide the user with the option to select the target unit of measure.
- D. Units of measure are usually not time-independent.
- E. Conversion to the target unit of measure is handled by SAP IBP Excel UI
正解:A、B、C
質問 # 53
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note:
There are 3 correct answers to this question.
- A. It checks whether the sourcing in the Production Source Item Master Data type exists.
- B. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- C. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- D. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- E. It checks whether the required planning level master data exists for a subset of input key figures.
正解:B、C、E
質問 # 54
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF("PERIODID4" ="$$PERIODID4CU$$...)
- B. IF("PERIODID5" ="$$PERIODID5CU$$...)
- C. IF("PERIODID3" ="$$PERIODID3CU$$...)
- D. IF("PERIODID2" ="$$PERIODID2CU$$...)
正解:A
質問 # 55
Why would you set up a cascading filter in the planning view?Note: There are 2 correct answers to this question.
- A. To filter attributes based on specific values
- B. To filter using attributes that have a large number of values
- C. To filter attributes based on other attribute filters
- D. To filter data in an Application Job template
正解:A、B
質問 # 56
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note: There are 2 correct answers to this question.
- A. Forecast Error CV Calculated by Manage Forecast Error Calculations app
- B. Future Consensus Forecasts and Lagged Forecast Snapshots
- C. Sales Order Quantities (both historical and future open orders)
- D. Recommended Safety Stocks from Multistage Inventory Optimization
正解:B、D
質問 # 57
You have to be logged on to two separate SAP IBP tenants.What can help you differentiate the appearance of their user interfaces?Note: There are 2 correct answers to this question.
- A. Setting a separate theme for the Home page in the Web UI.
- B. Defining a different default planning area via the User Preferences.
- C. Add the system name and tenant information from the About section to the Home page.
- D. Having a different set of tiles in the Home group of apps.
正解:A、C
質問 # 58
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.
- A. Users should have authorization for template administration.
- B. Activate Local Member Recognition setting is selected.
- C. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
- D. Use Excel Cell References in the Report Editor option is selected.
正解:A、B
質問 # 59
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.
- A. Fixing is possible for a certain quantity of a key figure value.
- B. Fixing is possible for system editable key figures.
- C. Fixing is possible for manually editable key figures.
- D. Fixing is possible for a certain period, including all child values in the hierarchy.
正解:B、D
質問 # 60
......
試験準備には欠かさない!トップクラスのSAP C-IBP-2305試験アプリ学習ガイド練習問題最新版:https://jp.fast2test.com/C-IBP-2305-premium-file.html