検証済み!C-IBP-2305問題集と解答でC-IBP-2305テストエンジン正確解答付き [Q24-Q39]

Share

検証済み!C-IBP-2305問題集と解答でC-IBP-2305テストエンジン正確解答付き

あなたを必ず合格させるC-IBP-2305問題集PDF2023年最新のに更新された86問あります


SAP C-IBP-2305 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Define and view information with user-defined charts and dashboards
  • Configure and use Planning Operators to automate processes in your planning model
トピック 2
  • Key Figures & Attributes
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
トピック 3
  • Create and transform forecasts in your planning model
  • Display, create, copy, edit, check, and activate a planning area
トピック 4
  • Optimize the integration scenarios and architecture of your planning solution
  • Solution Architecture & Data Integration
トピック 5
  • Configure supply planning, run various solvers to generate planning results
  • Use the Fiori Launchpad to customize the UI, work with Excel UI

 

質問 # 24
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note: There are 2 correct answers to this question.

  • A. Recommended Safety Stocks from Multistage Inventory Optimization
  • B. Forecast Error CV Calculated by Manage Forecast Error Calculations app
  • C. Future Consensus Forecasts and Lagged Forecast Snapshots
  • D. Sales Order Quantities (both historical and future open orders)

正解:A、C


質問 # 25
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.

  • A. Create additional test planning areas in the production system to support cutover needs.
  • B. Set up a three-tier landscape using transport, starting from the development system to test and production.
  • C. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
  • D. Create additional planning areas in the test system to support training needs.

正解:B、C


質問 # 26
Forecast Error CV is an input to which of the following?

  • A. Forecast Error Calculation in Inventory Planning Profile Operator
  • B. Multistage Inventory Optimization in Inventory Planning Profile Operator
  • C. Calculate Target Inventory Components in Inventory Planning Profile Operator
  • D. Time-Series-Based Supply Planning Optimizer

正解:B


質問 # 27
What are some of the capabilities of the Planner Workspaces app? Note: There are 2 correct answers to this question.

  • A. It supports embedding analytic stories as a workspace component
  • B. It supports sharing with other users or user groups.
  • C. It supports simulating the effect of the changes
  • D. It supports favorites created in SAP IBP, add-in for Microsoft Excel

正解:A、D


質問 # 28
Time profiles are made out of levels, and levels are made out of periods.Which ways can SAP IBP identify profiles and periods?Note: There are 2 correct answers to this question.

  • A. Both periods and profiles are identified by a unique integer.
  • B. Periods are identified by an integer and profiles by an alphanumeric prefix.
  • C. Periods are identified by an alphanumeric prefix and profiles by an integer.
  • D. Both periods and profiles have start and end dates.

正解:B、C


質問 # 29
Which parts of the S&OP high-level process would the Inventory planning and optimization process fit into?Note: There are 2 correct answers to this question.

  • A. Management business Review, by providing the inventory targets for endorsement
  • B. Demand Review, by using the output of demand planning as input into calculations
  • C. Supply Review, by providing an input to supply network planning
  • D. Reconciliation Review, by providing inventory parameters for one consolidated plan

正解:A、D


質問 # 30
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.

  • A. Analyze Supply Usage
  • B. Gating Factors
  • C. Detailed Production Scheduling
  • D. Planning with Product Allocations

正解:A、B


質問 # 31
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are
2 correct answers to this question.

  • A. The key figure is stored and all editable.
  • B. The key figure is stored and system editable.
  • C. The key figure is calculated and all editable.
  • D. The key figure is calculated and system editable.

正解:A


質問 # 32
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?

  • A. A time profile has to be activated so that the application job can proceed.
  • B. The assigned Planning Area must be active.
  • C. This application job can be run for multiple time profiles at once.
  • D. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.

正解:D


質問 # 33
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Trend Chart Types
  • B. Seasonal Chart Types
  • C. Comparison Chart Types
  • D. Geographic Chart Types
  • E. Simulation Chart Types

正解:A、B、C


質問 # 34
What are the ways to achieve rolling aggregation with SAP IBP?

  • A. Using a key figure calculation
  • B. Using a appropriate period weight factor
  • C. Using a local member
  • D. Using a attribute as a key figure

正解:B


質問 # 35
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Assign the compound master data type and its component master data types.
  • B. Configure at least one calculated key figure for the planning area.
  • C. Specify a planning horizon in the planning area for each level of the assigned time profile.
  • D. Configure at most two input key figures on the same planning level in a key figure calculation.

正解:A、C


質問 # 36
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.

  • A. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
  • B. Minimum capacity utilization will result in pull production occurring.
  • C. Excess stock can be generated and will need to be staged in an overflow warehouse.
  • D. Capacity leveling will be possible for production and storage resources.

正解:A、C


質問 # 37
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.

  • A. Fixing is possible for a certain quantity of a key figure value.
  • B. Fixing is possible for system editable key figures.
  • C. Fixing is possible for a certain period, including all child values in the hierarchy.
  • D. Fixing is possible for manually editable key figures.

正解:B、C


質問 # 38
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?Note: There are 2 correct answers to this question.

  • A. The attribute should be a non-key attribute of the master data type.
  • B. The attribute belongs to a simple or compound master data type.
  • C. The Business Meaning of the attribute has been specified.
  • D. The attribute should be assigned to all planning levels.

正解:A、B


質問 # 39
......

合格できるSAP C-IBP-2305試験情報フリー練習テスト:https://jp.fast2test.com/C-IBP-2305-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어