[2025年02月24日] 合格させるC_S43_2023レビューガイド、信頼され続けるC_S43_2023テストエンジン [Q35-Q50]

Share

[2025年02月24日] 合格させるC_S43_2023レビューガイド、信頼され続けるC_S43_2023テストエンジン

C_S43_2023テストエンジン練習テスト問題、試験問題集


SAP C_S43_2023 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Managing Clean Core: This section measures the ability to evaluate and apply clean core principles to ERP systems. It involves maximizing business process agility, minimizing adaptation efforts, and accelerating innovation by adhering to clear core principles.
トピック 2
  • Maintenance Processing - Advanced Functions: This section assesses candidates' ability to describe and implement corrective maintenance processes using both traditional and FIORI-based applications. It involves understanding how to address and resolve issues that emerge during maintenance activities.
トピック 3
  • Technical Objects: This section assesses the capability of professionals to describe and implement technical asset structures. It emphasizes fundamental concepts and the integration of technical objects with key neighboring applications. Candidates should show their ability to develop and manage technical asset structures and integrate them into broader systems.
トピック 4
  • User Interface and User Experience: This section evaluates knowledge of UI technologies and client types used with SAP S
  • 4HANA Asset Management. Candidates are expected to describe various user interface technologies and their application to mobile maintenance scenarios.
トピック 5
  • Preventive Maintenance: This section tests the skills of professionals in preventive maintenance, covering strategies such as task lists, single-cycle maintenance, time-based plans, and performance-based maintenance strategies. for designing and managing preventive maintenance schedules and plans.

 

質問 # 35
What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question.

  • A. I (PM Structure element)
  • B. F (Functional location)
  • C. L (Stock item)
  • D. E (Equipment)
  • E. D (Document item)

正解:A、C、E

解説:
Technical Objects


質問 # 36
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance?
Note: There are 2 correct answers to this question.

  • A. If you use the Resource Scheduling apps, you always dispatch orders and operations.
  • B. The configuration of the order type decides whether you use Resource Scheduling or not.
  • C. Maintenance Planning Buckets give you a list of non-approved notifications.
  • D. The order moves to the Preparation phase once it is approved and released.

正解:A、D

解説:
Maintenance Processing - Advanced Functions


質問 # 37
The maintenance engineer creates a maintenance plan for service procurement.
Which of the following objects does the engineer assign to the maintenance plan item? Note: There are
2 correct answers to this question.

  • A. Framework order
  • B. Purchasing contract
  • C. Settlement order
  • D. Internal order

正解:A、C

解説:
Preventive Maintenance


質問 # 38
Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question

  • A. SAP Business Objects Business Intelligence for Visualization
  • B. Preconfigured Core Data Service (CDS) containing SQL views
  • C. A collection of tools that are not included with core SAP S/4HANA
  • D. SAP Business Objects as a part of SAP Business Warehouse (BW)

正解:A、C

解説:
Strategic analysis is a type of analysis that provides a high-level overview of the business performance and trends, as well as the ability to drill down into the details and perform root cause analysis. Strategic analysis is typically performed by business analysts or managers who need to make strategic decisions based on the data.
Strategic analysis requires a collection of tools that are not included with core SAP S/4HANA, such as SAP Analytics Cloud, SAP Business Planning and Consolidation, SAP Business Warehouse, and SAP Business Objects Business Intelligence. These tools enable the integration, transformation, modeling, and visualization of data from various sources, including SAP S/4HANA and other systems. Embedded analysis, on the other hand, is a type of analysis that provides real-time insights into the operational data within the SAP S/4HANA core system. Embedded analysis is typically performed by end users or operational managers who need to monitor and optimize the business processes and transactions. Embedded analysis relies on preconfigured Core Data Services (CDS) views that contain SQL views of the data in SAP S/4HANA. These views can be accessed by SAP Fiori apps, SAP Smart Business KPIs, or SAP Analysis for Microsoft Office. SAP Business Objects is not a part of SAP Business Warehouse, but a separate product that can connect to SAP Business Warehouse or other data sources. Therefore, option C is incorrect. References:
* SAP S/4HANA Asset Management - Analytics, section "Strategic Analysis"
* SAP S/4HANA Asset Management - Analytics, section "Embedded Analysis"
* SAP S/4HANA Asset Management - Analytics, section "SAP BusinessObjects Business Intelligence"


質問 # 39
You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.

  • A. The effective costs are posted to the respective batch (valuation type).
  • B. The goods receipt for the batch refurbished is posted with the value of the standard price.
  • C. The goods receipt for the batch refurbished is posted with the value of the moving average price
  • D. The effective costs are posted as a credit memo to a price difference account

正解:B、D

解説:
When you settle a refurbishment order with the batches (valuation types) having price control standard price, the following effects occur:
* The effective costs are posted as a credit memo to a price difference account. This means that the difference between the actual costs of the refurbishment and the standard price of the batch is recorded as a variance in the accounting document. This ensures that the inventory value of the batch is not affected by the refurbishment costs1
* The goods receipt for the batch refurbished is posted with the value of the standard price. This means that the inventory value of the batch is updated with the predefined price that is maintained in the material master. This ensures that the inventory value of the batch is consistent and stable1 The other options are incorrect because:
* The effective costs are not posted to the respective batch (valuation type). The batch valuation is based on the standard price, not the actual costs of the refurbishment1
* The goods receipt for the batch refurbished is not posted with the value of the moving average price. The moving average price is only used for batches with price control moving average price, not standard price1 References: 1: Settlement Receiver | SAP Help Portal


質問 # 40
Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question.

  • A. Technical Objects
  • B. Cost analytics
  • C. ESRI maps
  • D. Breakdown analytics
  • E. Work orders and operations

正解:A、C、E

解説:
User Interface and Mobile Maintenance


質問 # 41
Which objects have been enhanced with linear data in maintenance processes?
Note: There are 3 correct answers to this question.

  • A. Work order confirmation
  • B. Maintenance plan header
  • C. Equipment task list
  • D. Notification item
  • E. Maintenance plan item

正解:A、D、E

解説:
Technical Objects


質問 # 42
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.

  • A. An object list must have been generated manually or automatically.
  • B. An Inspection Plan and a technical object must be assigned to the same class.
  • C. A PM task list with inspection point type must be assigned to the maintenance order.
  • D. A checklist type must be assigned to the maintenance order header.

正解:B、C

解説:
Maintenance Processing - Advanced Functions


質問 # 43
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

  • A. Scheduling type
  • B. Initial/subsequent buffer
  • C. Package offset
  • D. Call horizon

正解:B


質問 # 44
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

  • A. Cancel status Released.
  • B. Change the pronty
  • C. Book a goods receipt.
  • D. Change the estimated costs.

正解:B、C


質問 # 45
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app?
Note: There are 2 correct answers to this question.

  • A. Release
    * Start Work
  • B. Release
    * Print
  • C. Complete
    * Close Report
  • D. Schedule
    * Dispatch

正解:A、C

解説:
Maintenance Processing - Basic Functions


質問 # 46
Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question.

  • A. Technical Objects
  • B. Cost analytics
  • C. ESRI maps
  • D. Breakdown analytics
  • E. Work orders and operations

正解:A、C、E

解説:
User Interface and Mobile Maintenance


質問 # 47
Which are the prerequisites for Inspection Checklist Processing?
Note: There are 2 correct answers to this question.

  • A. QM inspection plan with assigned inspection characteristics
  • B. Inspection point type assigned to the task list header
  • C. Classification data assigned to a technical object
  • D. Master inspection characteristics assigned to PM task list operations

正解:B、D

解説:
Maintenance Processing - Advanced Functions


質問 # 48
You want to create a maintenance order with an external order operation that includes service items.
How can you achieve this? Note: There are 2 correct answers to this question

  • A. The assignment of a control key with the service indicator set is mandatory
  • B. The actual value entry can be recorded only via the service entry sheet
  • C. The assignment of a control key with key externally processed operation is sufficient.
  • D. The usage of a model service specification is mandatory.

正解:B、C


質問 # 49
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question.

  • A. Confirm time sheets
    * Attach documents
  • B. Change BOM
    * Create a work order on the ESRI map
  • C. Display maps
    * Display and maintain Technical Objects
  • D. Schedule resources
    * Change task list

正解:A、C

解説:
Topic: 3
Preventive Maintenance


質問 # 50
......

100%無料C_S43_2023日常練習試験には82問があります:https://jp.fast2test.com/C_S43_2023-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어