[2024年10月] ベストな問題集を使おう APICS Certification CPIM 専門試験問題 [Q104-Q122]

Share

[2024年10月] ベストな問題集を使おうAPICS Certification CPIM専門試験問題

100%の合格率を試そう!更新されたのはCPIM試験問題 [2024]


APICS CPIM(生産および在庫管理認定)認定試験は、生産および在庫管理に関与するプロフェッショナル向けに設計された、世界的に認められた認定です。認定試験は、サプライチェーンマネジメント協会(ASCM)によって提供され、専門家の知識とスキルを検証することを目的としています。

 

質問 # 104
Which of the following is NOT the class of activity?

  • A. Storage
  • B. Environment
  • C. Inspection
  • D. Operation

正解:B


質問 # 105
Important way to resolve conflicting objective is:

  • A. To provide close coordination of the supply, production and distribution functions.
  • B. All statements related ones.
  • C. Balance conflicting objectives to minimize the total of all costs involved
  • D. Integrated materials management or logistics organization

正解:B


質問 # 106
Which cost would be the interest lost by not investing the money at the prevailing interest rate, and it may be much higher depending on investment opportunities for the firm?

  • A. Minimum cost
  • B. Investment cost
  • C. Capital cost
  • D. Capacity-associated cost

正解:A


質問 # 107
If a company makes wooden tables, the demand for the tables is called

  • A. Both A & B
  • B. None of the above
  • C. Dependent Demand
  • D. Independent Demand

正解:D


質問 # 108
The costs those directly associated with the amount produced or sold are called:

  • A. Average cost
  • B. Total cost
  • C. Fixed cost
  • D. Variable cost

正解:D


質問 # 109
Inventories are part of planning process and provide buffer against:

  • A. Differences in demand and production rates
  • B. None of these
  • C. Production rates
  • D. Demand rates

正解:A


質問 # 110
and uncouples the sales forecast from manufacturing by establishing a manufacturing plan

  • A. Production plan, MPS
  • B. MRP and production plan
  • C. MRP and MRP II
  • D. MPS and chase strategy

正解:A


質問 # 111
In bills of Material structure; Summarized parts list:

  • A. The lists of all the parts needed to make one complete assembly
  • B. Both A & B
  • C. Does not contain any information about the way the product is made or assembled
  • D. It's the list of comments are linked to their parents by listing them immediately below the parents

正解:B


質問 # 112
A bill is used when companies usually make more than one product and the same components are often used in several products

  • A. Single-level bill
  • B. Multilevel bill
  • C. Indented bill
  • D. Multiple bill

正解:D


質問 # 113
A methodology designed to ensure that all the major requirements of the customer are identified and subsequently met or exceed through the resulting product design process is known as:

  • A. Quality Function Deployment
  • B. Quality iterations
  • C. Target Quality Assurance
  • D. Competitive Quality Evaluation

正解:A


質問 # 114
Goods making up a single order are brought together and checked for omissions or errors, this is known as:

  • A. Marshal the shipment
  • B. Dispatch shipment
  • C. Operate the shipment
  • D. Receive the shipment

正解:A


質問 # 115
The process of determining in detail the amount of labor and machine resources needed to achieve the required production id known as:

  • A. Capacity Requirements Plan
  • B. Material Requirement Plan
  • C. Resource Plan
  • D. Production Plan

正解:A


質問 # 116
When a job might be expanded to include a sequence of activities instead of only one activity, this is called

  • A. Parallel expansion
  • B. Vertical enlargement
  • C. Correspondence expansion
  • D. Horizontal enlargement

正解:D


質問 # 117
The information needed to make a production plan is:

  • A. Any past-due customer orders. These are orders that are late for delivery and are sometimes back orders.
  • B. Forecast by period for the planning horizon
  • C. All of these
  • D. Opening inventory and desired ending inventory

正解:C

解説:
Example:
Amalgamated Fish Sinkers makes a product group of fresh fish sinkers and want to develop a production plan for them. The expected opening inventory is 100 cases, and the company wants to reduce that to 80 cases by the end of the planning period. The number of working days is the same for each period. There are no back orders. The expected demand for the fish sinkers is as follows:


質問 # 118
Goods are not made continuously as in a flow system but are made at intervals in lots or batches in:

  • A. Discrete manufacturing
  • B. Inflexible manufacturing
  • C. Intermittent manufacturing
  • D. Fixed manufacturing

正解:C


質問 # 119
The workstations required to make the product, or family of products, are located close together and in the sequence needed to make the product is called:

  • A. Flow manufacturing
  • B. Process manufacturing
  • C. Productive manufacturing
  • D. Repetitive manufacturing

正解:D


質問 # 120
What can be based on characteristics such as customer grouping, demand characteristics, or degree of customization?

  • A. Functional focus
  • B. Focused factory
  • C. Product and market focus
  • D. Process focus

正解:C


質問 # 121
Backward scheduling is used to determine when an order must be started.

  • A. False
  • B. True

正解:B


質問 # 122
......


APICS CPIM(生産および在庫管理の認定)試験は、生産および在庫管理の原則に関する個人の知識と理解を検証するように設計された世界的に認められた認定プログラムです。この認定は、サプライチェーン管理協会(ASCM)によって授与され、業界で非常に尊敬されています。 APICS CPIM認定プログラムは、CPIMパート1とCPIMパート2の2つの部分に分けられます。各パートは、生産と在庫管理に関する個人の知識をテストするように設計された別々の試験で構成されています。

 

CPIM試験問題を今すぐ試そう!最新の[2024年最新] 正解回答付き:https://jp.fast2test.com/CPIM-premium-file.html

合格させるCPIM試験にはリアル問題解答:https://drive.google.com/open?id=15bQrg515JIjDyurYJZlIQQEHXKsZKFFY


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어