[2023年12月16日]C_TS411_2022試験問題集でリアル試験と100%同じ問題と解答 [Q44-Q64]

Share

[2023年12月16日]C_TS411_2022試験問題集でリアル試験と100%同じ問題と解答

C_TS411_2022テストエンジン問題集トレーニングには80問あります

質問 # 44
Which configuration process/scenario do you use for an Engineer To Order process?

  • A. Planned/Production Order
  • B. Order BOM
  • C. Engineering Order
  • D. Sales Order (SET)

正解:B


質問 # 45
What do you have to keep in mind when copying a group BOM to a plant specific BOM?Note: There are
2 correct Answers to this question.

  • A. The internal BOM number stays unchanged.
  • B. The BOM usage can be changed.
  • C. The material component must have a plant assignment.
  • D. The header status has to be active.

正解:A、C


質問 # 46
The value assignment interface for variant configuration can be structured using interface design and characteristic groups.What can be used depending on the processing mode?

  • A. You can use interface design for both processing modes, but characteristic groups only for Processing Mode AVC.
  • B. You can use interface design and characteristic groups for both processing modes.
  • C. You can only use Interface Design for Processing Mode Classic and Characteristic Groups only for Processing Mode AVC.
  • D. You can only use Interface Design for Processing Mode AVC and Characteristic Groups for Processing Mode Classic.

正解:C


質問 # 47
You work with cross-plant and plant-specific Product Master statuses. Which status has the highest priority?

  • A. The most restrictive status.
  • B. The least restrictive status.
  • C. The plant-plant specific status.
  • D. The cross-plant status.

正解:D


質問 # 48
What controls the material BOM item category?Note: There are 2 correct Answers to this question.

  • A. A negative quantity is allowed.
  • B. A work center is required.
  • C. A change number is required.
  • D. A material number is required.

正解:A、D


質問 # 49
Working with the document status, what should you keep in mind?Note: There are 2 correct Answers to this question.

  • A. It can be set at object link level.
  • B. It can be defined as a status network.
  • C. It can only be defined plant specific.
  • D. It can be defined depending on document type.

正解:B、D


質問 # 50
What do you have to keep in mind when working with a class hierarchy?Note: There are 2 correct Answers to this question.

  • A. Characteristics are inherited to all subordinate classes.
  • B. You can extend the value list inherited to your subordinate class.
  • C. You can restrict the value list inherited to your subordinate class.
  • D. Characteristics values stay on their class and are not inherited.

正解:A、C


質問 # 51
Which features are available when working with the Manage Documents app?Note: There are 2 correct Answers to this question.

  • A. A secure storage area is selected automatically.
  • B. All information is displayed on only one page.
  • C. A secure storage area can be selected manually.
  • D. An object link to every SAP Object can be defined.

正解:A、B


質問 # 52
Some of your classifications are locked or incomplete. How do you find them?Note: There are 2 correct Answers to this question.

  • A. Use the Classification status.
  • B. Use the Class list.
  • C. Use Find in Classes and filter the search result.
  • D. Use the Characteristics list.

正解:A、C


質問 # 53
For which objects can you define a status network?Note: There are 2 correct Answers to this question.

  • A. Change record
  • B. Material master record
  • C. Document info record
  • D. Change number record

正解:A、C


質問 # 54
What happens if the characteristic status is not set to Released?

  • A. A value of this characteristic cannot be assigned in classification of a configurable material.
  • B. The characteristic can only be changed.
  • C. The characteristic cannot be assigned to a class.
  • D. A value of this characteristic cannot be assigned in configuration.

正解:D


質問 # 55
What do you have to keep in mind when overwriting characteristic for a specific class?

  • A. This change applies only to the characteristic, when it is used in every class.
  • B. This change applies only to the characteristic, when it is used in this class.
  • C. The status of this characteristic is automatically set to incomplete.
  • D. The status of this characteristic is automatically set to locked.

正解:B


質問 # 56
Which data base tables use the Product Master?

  • A. Tables only for Material Master.
  • B. Tables for Master Data Management.
  • C. Tables only for Product Master.
  • D. Tables for Product Master and Material Master.

正解:A


質問 # 57
What can you do when the class status is set to locked?Note: There are 2 correct Answers to this question.

  • A. Find objects in this class.
  • B. Maintain a classification.
  • C. Maintain the class.
  • D. Assign this class to a superior class.

正解:A、C


質問 # 58
For which configuration processes/scenarios can you also do a multi-level configuration in sales orders, if there are no sales-relevant items in the BOM available?Note: There are 2 correct Answers to this question.

  • A. Planned/Production Order without BOM explosion
  • B. Order BOM
  • C. Sales Order (SET processing)
  • D. Planned/Production Order with BOM explosion

正解:B、D


質問 # 59
Which material types are used for configurable material masters?Note: There are 2 correct Answers to this question.

  • A. Material type KMAT - configurable materials can only be created with this material type.
  • B. Each material type can be used in standard customizing for configurable material masters.
  • C. Material type KMAT - each material master of this material type can be configured in a fixed way.
  • D. Material types KMAT, HALB, and FERT - configurable materials can only be created with these material types.

正解:A、B


質問 # 60
Which configuration process/scenario requires subitems in sales orders?

  • A. Planned/Production Order without BOM explosion
  • B. Sales Order (SET processing)
  • C. Planned/Production Order with BOM explosion
  • D. Order BOM

正解:B


質問 # 61
What happens to the group BOM when you do a plant assignment?

  • A. The internal number and the BOM usage stays unchanged.
  • B. The internal number becomes new and the BOM usage stays unchanged.
  • C. The internal number and the BOM usage becomes new.
  • D. The internal number stays unchanged and the BOM usage becomes new.

正解:B


質問 # 62
What do you have to keep in mind when creating a Product Master from scratch?Note: There are 2 correct Answers to this question.

  • A. An industry sector can be selected.
  • B. Only files can be connected and uploaded, no document info records.
  • C. No organizational levels are asked.
  • D. No view selection screen becomes visible.

正解:C、D


質問 # 63
You are working with VC Modeling Environment PMEVC. Complete object dependencies are created by drag & drop of one or more characteristic values into a BOM item.What can be created with this drag & drop functionality?Note: There are 2 correct Answers to this question.

  • A. Local and global object dependencies
  • B. Selection conditions only
  • C. Local object dependencies only
  • D. Selection conditions and procedures

正解:A、D


質問 # 64
......

C_TS411_2022練習テストPDF試験材料:https://jp.fast2test.com/C_TS411_2022-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어