[2023年更新]C_TS411_2022まとめセット試験ガイド練習からあなたのC_TS411_2022試験を合格させます! [Q37-Q58]

Share

[2023年更新]C_TS411_2022まとめセット試験ガイド練習からあなたのC_TS411_2022試験を合格させます!

準備C_TS411_2022試験2023年最新のSAP Certified Application Associate無制限80問題

質問 # 37
What do you have to keep in mind when working with value hierarchies?Note: There are 2 correct Answers to this question.

  • A. Value nodes are values.
  • B. Only available for characteristics with CHAR or NUM format.
  • C. Value nodes are not values.
  • D. Only available for characteristics with CHAR format.

正解:C、D


質問 # 38
You are working with VC Modeling Environment PMEVC. Complete object dependencies are created by drag & drop of one or more characteristic values into a BOM item.What can be created with this drag & drop functionality?Note: There are 2 correct Answers to this question.

  • A. Selection conditions only
  • B. Selection conditions and procedures
  • C. Local object dependencies only
  • D. Local and global object dependencies

正解:B、D


質問 # 39
The value assignment interface for variant configuration can be structured using interface design and characteristic groups.What can be used depending on the processing mode?

  • A. You can only use Interface Design for Processing Mode Classic and Characteristic Groups only for Processing Mode AVC.
  • B. You can use interface design for both processing modes, but characteristic groups only for Processing Mode AVC.
  • C. You can only use Interface Design for Processing Mode AVC and Characteristic Groups for Processing Mode Classic.
  • D. You can use interface design and characteristic groups for both processing modes.

正解:A


質問 # 40
Which application areas can be set inside a release key of an engineering change number?Note: There are 2 correct Answers to this question.

  • A. Plant maintenance
  • B. Sales and distribution
  • C. Costing
  • D. Planning and production

正解:B、D


質問 # 41
Which organizational level is a Work Center assigned to?

  • A. Client
  • B. Production supervisor
  • C. Plant
  • D. Storage location

正解:C


質問 # 42
Which routing objects can object dependencies be assigned to?Note: There are 3 correct Answers to this question.

  • A. Sequences
  • B. Component Allocation
  • C. Inspection Characteristics
  • D. Production Resource Tools
  • E. Operations

正解:A、D、E


質問 # 43
Which configuration process/scenario prevents the display of a BOM explosion in the sales order?
Note: There are 2 correct Answers to this question.

  • A. Planned/Production Order without BOM explosion for both processing modes
  • B. Order BOM with processing mode AVC
  • C. Order BOM with processing mode classic and standard settings
  • D. Sales Order (SET) for both processing modes

正解:A、C


質問 # 44
How can you set up a class hierarchy?Note: There are 2 correct Answers to this question.

  • A. Using class hierarchy maintenance.
  • B. Using a class BOM.
  • C. Assigning a class to a superior class.
  • D. Using object links.

正解:A、C


質問 # 45
You write object dependencies for a BOM item. In the single-level configuration, you query the configuration for the header material.Which syntax elements have the same meaning?

  • A. $parent = $root
  • B. None of these. $self, $parent and $root address different levels.
  • C. $self = $root
  • D. $self = $parent

正解:A


質問 # 46
Which scenarios are possible when you upload files to a Product Master?Note: There are 2 correct Answers to this question.

  • A. You can easily upload a file without selecting a Workstation Application and a Content Server.
  • B. You can easily upload a file, select a Workstation Application and a Content Server.
  • C. You can easily attach a Document Info Record.
  • D. You cannot attach a Document Info Record.

正解:A、C


質問 # 47
Where can you specify a processing sequence during an assignment?

  • A. Procedures
  • B. Constraints
  • C. Constraint Nets
  • D. Pre- and Selection Conditions

正解:A


質問 # 48
A procedure sets the value V2 for characteristic C2 when the value V1 is set for characteristic C1.How do you assign and define this procedure?Note: There are 3 correct Answers to this question.

  • A. Procedure with the following syntax to the configuration profile: $self.C2 = 'V2' if $self.C1 = 'V1' (recommended)
  • B. Procedure to the value V2 with the following syntax: $self.C1 = 'V1' (not recommended)
  • C. Procedure to characteristic C1 using the following syntax: $self.C2 = 'V2' if $self.C1 = 'V1' (not recommended)
  • D. Procedure to the value V1 with the following syntax: $self.C2 = 'V2' (not recommended)
  • E. Procedure to characteristic C2 using the following syntax: $self.C1 = 'V1' if $self.C2 = 'V2' (not recommended)

正解:A、C、D


質問 # 49
Why do you use the Restrictions tab in a characteristic?

  • A. To control the authorizations for the characteristic
  • B. To control the authorization groups for the characteristic
  • C. To restrict the assignment of characteristics to classes of the class types you enter
  • D. To restrict the assignment of characteristics to the classes you enter

正解:C


質問 # 50
What do you have to keep in mind when working with a class hierarchy?Note: There are 2 correct Answers to this question.

  • A. You can extend the value list inherited to your subordinate class.
  • B. Characteristics values stay on their class and are not inherited.
  • C. You can restrict the value list inherited to your subordinate class.
  • D. Characteristics are inherited to all subordinate classes.

正解:C、D


質問 # 51
What objects can be changed with a change number? Note: There are 2 correct Answers to this question.

  • A. Work Centers
  • B. Bills of Material
  • C. Task Lists
  • D. Cost Centers

正解:B、C


質問 # 52
You can assign object dependencies to different master data.Which assignments have no effect in variant configuration and only affect classification?

  • A. Assignment to Characteristics
  • B. Assignment to Configuration Profiles
  • C. Assignment to Characteristic Values
  • D. Assignment to Classes

正解:C


質問 # 53
You activate the check for same classification inside basic data screen of your class. Which restrictions are available?
Note: There are 2 correct Answers to this question.

  • A. The classification is only checked when you have assigned values to some characteristics.
  • B. The classification is only checked for objects connected to several classes.
  • C. The classification is only checked when you have assigned values to all characteristics.
  • D. The classification is only checked for objects connected to one class.

正解:C、D


質問 # 54
What is the significance of the Additional Data tab in class maintenance?

  • A. It only exists for class nodes. It controls the usage in routings.
  • B. It exists for all class types. It controls the permitted object types.
  • C. It only exists for variant classes. It controls the use in configuration profiles.
  • D. It only exists for class nodes. It controls the usage in BOMs.

正解:D


質問 # 55
Some of your classifications are locked or incomplete. How do you find them?Note: There are 2 correct Answers to this question.

  • A. Use the Class list.
  • B. Use the Characteristics list.
  • C. Use Find in Classes and filter the search result.
  • D. Use the Classification status.

正解:C、D


質問 # 56
What is a class node?

  • A. Special classes that are used as items in the BOM.
  • B. Special classes that enable a cross-class search.
  • C. Special classes that are used as nodes in class hierarchies.
  • D. Special classes that are used as an operation in the routing.

正解:A


質問 # 57
Which configuration processes/scenarios are supported for both processing modes?

  • A. Plan./Production Order, Sales Order (SET) only
  • B. Plan./Production Order, Order BOM only
  • C. Sales Order (SET), Order BOM only
  • D. Plan./Production Order, Order BOM, Sales Order (SET)

正解:D


質問 # 58
......

注目のC_TS411_2022まとめセット試験ガイドは最速合格できます:https://jp.fast2test.com/C_TS411_2022-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어