質問 45
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Transportation Lead Time Error CV
- B. Minimum Lot Size
- C. Holding Cost Percentage
- D. Target Service Level
正解: B,D
質問 46
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.
- A. Target Cycle Stock
- B. Component Usage
- C. Reorder Point
- D. Target Pipeline Stock
- E. Recommended Safety Stock
正解: A,D,E
質問 47
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.
- A. Model inventory turns based on Target Safety stocks
- B. Simulate statistical forecast at the Demand Review stage
- C. Simulate heuristics run in Supply Review stage
- D. Simulate demand sensing inputs for Supply Review
正解: B,C
質問 48
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.
- A. Detailed statistical analysis of demand data using predictive analytics tools
- B. Demand sensing of demand data using predictive analytics tools
- C. Consideration of demand-driven analysis for buffer positioning.
- D. Embedded, on-the-fly demand analytics
正解: C,D
質問 49
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.
- A. Cloud Identity Authentication Service
- B. Real-time Integration
- C. Cloud Integration for Data Services
- D. Smart Data Integration
正解: C,D
質問 50
How many different time levels can be selected within one planning view?
- A. Only time levels from the base planning level of selected key figures
- B. All time levels available in the time profile, restricted by global configuration parameter
- C. All time levels available in the time profile
- D. Only base time levels of the planning area
正解: C
質問 51
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Avoid using telescopic time buckets.
- B. Increase the use of incremental lot size beyond the frozen horizon.
- C. Split into multiple planning areas to support weekly vs. daily planning needs.
- D. Keep the number of fairshare segments small.
- E. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
正解: A,C,E
質問 52
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.
- A. Violation of minimum resource utilization
- B. Not respecting production capacity
- C. Not adhering to maximum transport values
- D. Violation of minimum aggregated inventory values
- E. Not-fully satisfied demands
正解: A,D,E
質問 53
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.
- A. Charts creation in SAP Supply Chain Control Tower
- B. Decoupling Points determination in SAP IBP for demand-driven replenishment
- C. Supply Heuristics in SAP IBP for sales and operations
- D. Demand Sensing with Gradient Boosting (Full)
正解: C,D
質問 54
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.
- A. Consideration of demand-driven analysis for buffer positioning.
- B. Demand sensing of demand data using predictive analytics tools
- C. Detailed statistical analysis of demand data using predictive analytics tools
- D. Embedded, on-the-fly demand analytics
正解: C,D
質問 55
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?
- A. A planning area with its time profile must be bundled in one collection.
- B. A planning area with the copy operators assigned must be bundled in one collection.
- C. You should delete collections after they have been transported.
- D. Configuration items should be bundled in the collections based on the SAP IBP project stream.
正解: A,B
質問 56
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- B. Key figures can be calculated across different planning levels.
- C. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- D. The calculation chain for a key figure must always result in a calculated key figure.
正解: B,C
質問 57
You are working with inventory key figures.What are some of the business scenarios where you can use the Last Period Aggregation function?Note: There are 2 correct answers to this question.
- A. Search for and return the last not null value of the inventory key figure
- B. Calculating the value of inventory on any time profile level ensuring flexibility of calculation
- C. Calculating the value of inventory on a weekly basis, using static aggregation from the daily level
- D. Calculating how many periods inventory is going to last based on the planned demand
正解: A,D
質問 58
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?Note: There are 2 correct answers to this question.
- A. The attribute belongs to a simple or compound master data type.
- B. The Business Meaning of the attribute has been specified.
- C. The attribute should be a non-key attribute of the master data type.
- D. The attribute should be assigned to all planning levels.
正解: A,C
質問 59
You have to be logged on to two separate SAP IBP tenants.What can help you differentiate the appearance of their user interfaces?Note: There are 2 correct answers to this question.
- A. Setting a separate theme for the Home page in the Web UI.
- B. Add the system name and tenant information from the About section to the Home page.
- C. Defining a different default planning area via the User Preferences.
- D. Having a different set of tiles in the Home group of apps.
正解: A,B
質問 60
Model configuration allows the attributes of a master data type to be assigned as key figures.Which features are relevant for this type of object?
- A. This type of key figure is not usually stored and it cannot be set to editable.
- B. This object contains user-defined criteria that monitor the running of business plans.
- C. This object is not exposed to the user in planning views or modeling.
- D. This object provides a single value for a unique planning combination.
正解: D
質問 61
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Adjusted production interactive values
- B. Production source validity at the start of seasonal peak
- C. Capacity expansion with additional costs
- D. Incremental production values
正解: C
質問 62
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note:
There are 2 correct answers to this question.
- A. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
- B. Splitting the values from aggregated to detailed level using multiplication by the proportions
- C. Splitting the values from aggregated to detailed level, based on the time profile attribute
- D. Splitting the values from detailed to aggregated level by using a copy operator
正解: A,B
質問 63
You want to maintain key figure values for a new attribute and value combination, using SAP IBP, Add-in for Microsoft Excel, and are receiving an error related to missing combinations.How can you resolve this problem?Note: There are 2 correct answers to this question.
- A. Use the Check Mode operator to create the combinations
- B. Use the option New Planning Object in the SAP IBP, add-in for Microsoft Excel
- C. Use the Data Integration app to load suitable data that creates the combinations
- D. Use the Manage Master Data app to create the combinations
正解: C,D
質問 64
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?
- A. Created as type NVARCHAR and assigned to an external master data type
- B. Created as type DECIMAL and assigned to a compound master data type
- C. Created as type INTEGER and assigned to a compound master data type
- D. Created as type INTEGER and assigned to a simple master data type
正解: B
質問 65
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.
- A. Seasonal Chart Types
- B. Trend Chart Types
- C. Comparison Chart Types
- D. Geographic Chart Types
- E. Simulation Chart Types
正解: A,B,C
質問 66
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.
- A. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
- B. Splitting the values from aggregated to detailed level using multiplication by the proportions
- C. Splitting the values from aggregated to detailed level, based on the time profile attribute
- D. Splitting the values from detailed to aggregated level by using a copy operator
正解: A,B
質問 67
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.
- A. The name of the realignment step should be no longer than 20 characters.
- B. You must mark the realignment step as "shared" and assign the steps to users.
- C. A realignment step can change master data, planning objects and key figures.
- D. The number of steps in the realignment run is limited to 255.
正解: B,C
質問 68
......