
2023年最新のお手軽に合格させるC_IBP_2211試験にはこちらが提供する問題集PDFテストエンジン
C_IBP_2211のPDFで合格させるスゴ問題集でC_IBP_2211最新のリアル試験問題
質問 # 35
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.
- A. Demand Sensing with Gradient Boosting (Full)
- B. Supply Heuristics in SAP IBP for sales and operations
- C. Decoupling Points determination in SAP IBP for demand-driven replenishment
- D. Charts creation in SAP Supply Chain Control Tower
正解:A、B
質問 # 36
Which SAP IBP planning operator can be run to delete planning objects in a certain version?
- A. Purge Master Data
- B. Purge Non-Confirming Data
- C. Purge Key Figure Data
- D. Purge Key Figure Data Outside Planning Area Planning Horizon
正解:C
質問 # 37
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.
- A. Real-time Integration
- B. Cloud Integration for Data Services
- C. Cloud Identity Authentication Service
- D. Smart Data Integration
正解:B、D
質問 # 38
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Maximum lot size
- B. Minimum lot size
- C. Transportation lead times
- D. Aggregated constraints
- E. Adjusted transport receipts
正解:B、C、E
質問 # 39
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF("PERIODID5" ="$$PERIODID5CU$$...)
- B. IF("PERIODID3" ="$$PERIODID3CU$$...)
- C. IF("PERIODID2" ="$$PERIODID2CU$$...)
- D. IF("PERIODID4" ="$$PERIODID4CU$$...)
正解:B
質問 # 40
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. Key figures can be calculated across different planning levels.
- B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- C. The calculation chain for a key figure must always result in a calculated key figure.
- D. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
正解:A、D
質問 # 41
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Pareto Principle (Sorted and Cumulated %)
- B. By Number of Items (Sorted Values)
- C. By Number of Items (Sorted Average)
- D. By Pareto Principle (Sorted and Calculated Values)
正解:B、D
質問 # 42
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.
- A. Copying multiple key figures can be processed sequentially.
- B. If necessary target key figures values are disaggregated.
- C. If necessary source key figures values are disaggregated.
- D. Copying multiple key figures on different planning levels is not possible.
正解:A、C
質問 # 43
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the sourcing in the Production Source Item Master Data type exists.
- B. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- C. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- E. It checks whether the required planning level master data exists for a subset of input key figures.
正解:B、D、E
質問 # 44
You have to be logged on to two separate SAP IBP tenants.What can help you differentiate the appearance of their user interfaces?Note: There are 2 correct answers to this question.
- A. Having a different set of tiles in the Home group of apps.
- B. Setting a separate theme for the Home page in the Web UI.
- C. Defining a different default planning area via the User Preferences.
- D. Add the system name and tenant information from the About section to the Home page.
正解:B、D
質問 # 45
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
- A. Inventory Optimization
- B. Response Planning
- C. Demand Sensing
- D. Sales and Operations Planning
- E. Demand Driven Replenishment
正解:A、C、D
質問 # 46
You are reviewing the master data types that are often used for supply and inventory planning
.Which master data types are compound master data types?Note: There are 2 correct answers to this question.
- A. SOURCECUSTGROUP
- B. SOURCECUSTOMER
- C. SOURCEPRODUCTION
- D. SOURCELOCATION
正解:B、D
質問 # 47
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Transportation Lead Time Error CV
- B. Minimum Lot Size
- C. Target Service Level
- D. Holding Cost Percentage
正解:B、C
質問 # 48
How many different time levels can be selected within one planning view?
- A. All time levels available in the time profile, restricted by global configuration parameter
- B. Only time levels from the base planning level of selected key figures
- C. All time levels available in the time profile
- D. Only base time levels of the planning area
正解:C
質問 # 49
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
- A. Transportation lead times
- B. Aggregated constraints
- C. Adjusted transport receipts
- D. Minimum lot size
- E. Maximum lot size
正解:A、C、E
質問 # 50
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note:
There are 3 correct answers to this question.
- A. You can only apply one value-based filter per planning view.
- B. The alerts dashboard is not available if a value-based filter is set for the open planning view.
- C. These filters can be used together with attribute totals in the same planning view.
- D. You can add (or delete) planning objects to a planning view after these filters are applied.
- E. These filters are always applied based on the values stored in the database.
正解:A、B、E
質問 # 51
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.
- A. Create additional planning areas in the test system to support training needs.
- B. Set up a three-tier landscape using transport, starting from the development system to test and production.
- C. Create additional test planning areas in the production system to support cutover needs.
- D. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
正解:B、D
質問 # 52
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm- specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.
- A. Discretization
- B. Processing mode
- C. Global cost factors
- D. Time profile level
正解:B、C
質問 # 53
......
SAP C_IBP_2211 認定試験は、SAP Integrated Business Planning (IBP) for Supply Chain アプリケーションに特化したプロフェッショナルのスキルと知識を検証するために設計されています。SAP IBP はクラウドベースのソリューションであり、企業がサプライチェーンプロセスをリアルタイムでより良く計画、実行、監視することができます。認定試験では、候補者が SAP IBP for Supply Chain を構成し、実装し、維持する能力、およびソリューションの主要な機能と特徴を理解する能力をテストします。
C_IBP_2211問題集はあなたの合格を必ず保証します:https://jp.fast2test.com/C_IBP_2211-premium-file.html
有効なC_IBP_2211テスト解答C_IBP_2211試験PDF:https://drive.google.com/open?id=1M5K2a-TAFMvRX7I11LnW-zm94N1BZXyV