質問 15
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.

  • A. Detailed Production Scheduling
  • B. Gating Factors
  • C. Planning with Product Allocations
  • D. Analyze Supply Usage

正解: B,D

 

質問 16
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?

  • A. A planning area with its time profile must be bundled in one collection.
  • B. A planning area with the copy operators assigned must be bundled in one collection.
  • C. Configuration items should be bundled in the collections based on the SAP IBP project stream.
  • D. You should delete collections after they have been transported.

正解: A,B

 

質問 17
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?

  • A. The assigned Planning Area must be active.
  • B. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
  • C. This application job can be run for multiple time profiles at once.
  • D. A time profile has to be activated so that the application job can proceed.

正解: B

 

質問 18
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note: There are 2 correct answers to this question.

  • A. Forecast Error CV Calculated by Manage Forecast Error Calculations app
  • B. Sales Order Quantities (both historical and future open orders)
  • C. Future Consensus Forecasts and Lagged Forecast Snapshots
  • D. Recommended Safety Stocks from Multistage Inventory Optimization

正解: C,D

 

質問 19
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.

  • A. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
  • B. The calculation chain for a key figure must always result in a calculated key figure.
  • C. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
  • D. Key figures can be calculated across different planning levels.

正解: C,D

 

質問 20
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.

  • A. Copy the launch dimension from the reference product to the new product
  • B. Enter the product family to which the new product belongs
  • C. Create planning objects for new combinations in the app
  • D. Enter the Phase-out Start Date and Phase-out End Date

正解: A,C

 

質問 21
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.

  • A. Model inventory turns based on Target Safety stocks
  • B. Simulate heuristics run in Supply Review stage
  • C. Simulate statistical forecast at the Demand Review stage
  • D. Simulate demand sensing inputs for Supply Review

正解: B,C

 

質問 22
You set up time-series integration using Cloud Integration for Data Services. During the integration process of master data, an error occurred. In the Data Integration app the job failed with status "Fatal Error". How can you find more details about the error?

  • A. Download the Initial Problem Report in the Data Integration app.
  • B. Download the Rejection Report in the Data Integration app.
  • C. Navigate to the Manage Master Data app and open the Log.
  • D. Navigate to the Master Data Workbook in Excel and open the Log.

正解: C

 

質問 23
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Add a new time profile level to the time profile.
  • B. Change the past and future horizon of the levels in the time profile.
  • C. Change the numbering hierarchy of the period IDs in the time profile.
  • D. Change the description of the attributes in the time profile.

正解: B,D

 

質問 24
Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question.

  • A. The total value can be added before or after the selected attribute.
  • B. Only attribute-based totals can be added to the planning view.
  • C. The total number of attributes that can use subtotals in the planning view can be restricted.
  • D. The values of the attribute-based total at the highest attribute level in the planning level can be changed.

正解: A,C

 

質問 25
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.

  • A. Filter blocks are imposed when modeling an attribute as a key figure.
  • B. Filter blocks can be visualized in the Key Figure Calculations app.
  • C. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel
  • D. Filter blocks are imposed when modeling attribute transformations.
  • E. Filter blocks are imposed when modeling cross-period calculations.

正解: A,C,D

 

質問 26
Why would you set up a cascading filter in the planning view?Note: There are 2 correct answers to this question.

  • A. To filter using attributes that have a large number of values
  • B. To filter data in an Application Job template
  • C. To filter attributes based on other attribute filters
  • D. To filter attributes based on specific values

正解: A,D

 

質問 27
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.

  • A. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
  • B. Finite heuristics can achieve demand prioritization and pegging.
  • C. Push and Pull production models are used by the optimizer.
  • D. Planning results can be generated faster by the optimizer.

正解: B,C

 

質問 28
You have to be logged on to two separate SAP IBP tenants.What can help you differentiate the appearance of their user interfaces?Note: There are 2 correct answers to this question.

  • A. Defining a different default planning area via the User Preferences.
  • B. Setting a separate theme for the Home page in the Web UI.
  • C. Add the system name and tenant information from the About section to the Home page.
  • D. Having a different set of tiles in the Home group of apps.

正解: B,C

 

質問 29
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Trend Chart Types
  • B. Comparison Chart Types
  • C. Simulation Chart Types
  • D. Geographic Chart Types
  • E. Seasonal Chart Types

正解: A,B,E

 

質問 30
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Minimum lot size
  • B. Maximum lot size
  • C. Adjusted transport receipts
  • D. Transportation lead times
  • E. Aggregated constraints

正解: B,C,D

 

質問 31
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.

  • A. Cloud Identity Authentication Service
  • B. Cloud Integration for Data Services
  • C. Smart Data Integration
  • D. Real-time Integration

正解: B,C

 

質問 32
Which SAP IBP planning operator can be run to delete planning objects in a certain version?

  • A. Purge Master Data
  • B. Purge Non-Confirming Data
  • C. Purge Key Figure Data
  • D. Purge Key Figure Data Outside Planning Area Planning Horizon

正解: C

 

質問 33
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.

  • A. Disaggregation in batch triggered by an application job
  • B. Disaggregation according to a helper key figure
  • C. Proportional disaggregation by using KF2 in the expression
  • D. Disaggregation according to a user-defined expression
  • E. Disaggregation according to an equal split

正解: C,D,E

 

質問 34
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?

  • A. Created as type INTEGER and assigned to a simple master data type
  • B. Created as type NVARCHAR and assigned to an external master data type
  • C. Created as type DECIMAL and assigned to a compound master data type
  • D. Created as type INTEGER and assigned to a compound master data type

正解: C

 

質問 35
What are the relevant use cases for helper key figures?Note: There are 2 correct answers to this questions.

  • A. Used at any level of calculation level except the Request Level
  • B. Used to break down a large calculation into manageable subcalculations
  • C. Used when you have more than three inputs at different planning levels in one calculation
  • D. Used by end-users in planning views to help visualize cross-period calculations

正解: B,C

 

質問 36
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.

  • A. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".
  • B. Choose time-independent key figures as segmentation measures.
  • C. Identify inventory items that require closer attention.
  • D. Substitute missing values in case of sporadic demands.

正解: B,C

 

質問 37
Model configuration allows the attributes of a master data type to be assigned as key figures.Which features are relevant for this type of object?

  • A. This object is not exposed to the user in planning views or modeling.
  • B. This object provides a single value for a unique planning combination.
  • C. This type of key figure is not usually stored and it cannot be set to editable.
  • D. This object contains user-defined criteria that monitor the running of business plans.

正解: B

 

質問 38
......

100% 無料C-IBP-2208デモ-試し読み [PDF]、今すぐゲットせよ:https://drive.google.com/open?id=1EFlf3kAXmrp8weeWzY22RZUGb4q5L22f

正確でかつ完璧 アンサーはまるでリアル試験問題:https://jp.fast2test.com/C-IBP-2208-premium-file.html


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어