2023年最新の実際の1z0-1066-22問題集PDFで100%合格率を保証します [Q58-Q79]

Share

2023年最新の実際のFast2test 1z0-1066-22問題集PDFで100%合格率を保証します

無料Oracle 1z0-1066-22試験問題と解答


Oracle 1z0-1066-22 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Managing Sourcing and Approved Suppliers
  • Configure Safety Stock Plan options
トピック 2
  • Apply Item Attributes for Supply Planning
  • Configure, Run and Manage a Demand Plan
トピック 3
  • Integrate S&OP with SCM Cloud and External systems
  • Describe Override Demand Forecast and Plan Approval
トピック 4
  • Create and Manage a Constrained Supply Plan, including Material and Resource Constraints
  • Managing Planners, Security and Profile Options
トピック 5
  • Manage Release Recommendations
  • Costing and Inventory Foundations
トピック 6
  • Deploying Multi-Dimensional Demand Segments
  • Modelling and Analyzing the Supply Plan
トピック 7
  • Applying Forecasting Methods, Causal Factors, and then Evaluating Results
  • Manage Creating, Copying and Viewing a Supply Plan
トピック 8
  • Configure Attribute-Based Planning
  • Planning for Counter Sales Orders
  • Contract Management Collaboration
トピック 9
  • Dealing with Advanced Fulfillment via Contract Manufacturing, Back-to-Back, and Configure to Orde
  • Oracle Planning Central Cloud Overview

 

質問 # 58
You want to check how many items have excess inventory. Where must you go in Planning Central to find this information?

  • A. Manage Plans > Edit Supply Plan > Select Supply tab > Navigate to Item area > Filter by Items with Excess Inventory
  • B. Configure Exceptions > Expand Supply Planning Exceptions > Select Item With Excess Inventory
  • C. Open Table, Graph, or Tile Set > Search Exceptions > Open > Expand Supply Planning Exceptions > Select Item with Excess Inventory
  • D. Manage Plans > Edit Demand and Supply Plan > Select Supply tab > Navigate to Item area > Filter by Items with Excess Inventory
  • E. Configure Exceptions > Expand Demand Planning Exceptions > Select Item With Excess Inventory

正解:C

解説:


質問 # 59
You are defining material planners for your organization. However, when you go to Manage Material Planners, your organization does not appear in the list of values. Why?

  • A. You do not have data access to the organization.
  • B. The organization must be enabled in Manage Planning Parameters.
  • C. The organization must be enabled in Manage Planning Profile Options.
  • D. The organization is an Item Organization.
  • E. The organization was not enabled for collection under Manage Planning Source Systems.

正解:E


質問 # 60
Your Procurement Department is getting ready to set up Approved Supplier Lists that will be needed for Supply Planning. They ask you for what you need on the ASLs for planning usage. Which three options are key for planning? (Choose three.)

  • A. Make sure they are at a Global level.
  • B. Make sure to include Fixed Order Quantities.
  • C. Make sure to include Fixed Lot Multipliers.
  • D. Make sure all Local level ASLs include an Organization.
  • E. Make sure to include Maximum Order Quantities.
  • F. Make sure to include Minimum Order Quantities.

正解:A、C、F


質問 # 61
Your client has operations in the west coast of the US. If the customer is in the western half of the US, then they would like to ship the product from their warehouses. If it's in the eastern half of the US, then they want to drop ship it from a supplier.
How would you recommend they set the assignment up?

  • A. Set up two region level assignments, one for the west coast and the other for the east coast.
  • B. Set up a region for the west coast warehouse and an item-region level assignment for the drop ship.
  • C. Set up an item-region assignment for the west coast warehouse and a region level assignment for the drop ship.
  • D. Set up an item-organization assignment for the west coast warehouse and an item-organization level assignment for the drop ship.
  • E. Set up by each customer for the customers who should get product from each warehouse.

正解:B


質問 # 62
Your clients want to simulate how canceling demand may impact a plan. Which two steps must be done to simulate this change? (Choose two.)

  • A. Run plan with 'Do not refresh with current data'
  • B. Open plan > View Supplies and Demands > Remove the sales order from the plan and firm demand > Save changes
  • C. Open plan > View Supplies and Demands > Firm the demand and set firm quantity to 0 > Save changes
  • D. Manage Plans > Edit Plan Options > Add simulation set
  • E. Run plan with 'Refresh with current data'

正解:A、C


質問 # 63
When planning for customer demand to be fulfilled from internal organizations or from a contract manufacturer, what are the four types of planned orders that can be generated? (Choose four.)

  • A. Transfer orders for internally owned components being transferred from internal organizations to contract manufacturer organizations.
  • B. Make orders for items being manufactured in the contract manufacturer organization.
  • C. Buy orders for components purchased at internal organizations and contract manufacturer organizations.
  • D. Transfer orders for internally owned components being transferred from contract manufacturer to internal organizations.
  • E. Return orders for items being manufactured in the contract manufacturer organization.
  • F. Transfer orders for finished goods being transferred from contract manufacturer organizations to internal organizations.

正解:A、B、C、F

解説:


質問 # 64
The structure of the Plan Summary Layout is a predefined __________.

  • A. Supply Demand Workbench
  • B. Group of Reports
  • C. Material Plan view
  • D. Set of Infotiles
  • E. Set of Exceptions

正解:D


質問 # 65
Which three statements are true regarding exceptions? (Choose three.)

  • A. You can create custom exceptions.
  • B. You can export exception tables to Excel.
  • C. The conditions under which exceptions are generated can be modified.
  • D. You can act on an exception by selecting it and clicking 'Resolve exception'. A list of ways to resolve will be generated.
  • E. The calculation logic for exceptions can be modified.
  • F. You can drill down into Supplies and Demand from an exception line.

正解:B、C、E


質問 # 66
During Implementation of Planning Central, your client has discovered that no Material Planners have been defined in Manage Material Planners in Planning Central.
In this situation, which three statements are true? (Choose three.)

  • A. Collect Planning Data has not been run for Material Planners.
  • B. The Planner field will be null for all items.
  • C. You have not been assigned the Materials Planner role.
  • D. Your client has not been assigned the Material Planner role.
  • E. Planned Orders will not release successfully.

正解:B、D、E


質問 # 67
A sales order containing a back-to-back item has been created. However, when you ran the supply plan in Planning Central, the supply for the sales order was not released. Why was the supply not released?

  • A. Only Global Order Promising and Supply Chain Orchestration can be used to release and create new supplies for back-to-back orders.
  • B. Planning Central cannot create back-to-back supply, so the supply cannot be released.
  • C. The supply plan should have been run in Supply Chain Orchestration, not Planning Central.
  • D. The supply must first be created in Global Order Promising and then it can be released from Planning Central.

正解:A


質問 # 68
Identify two ways you can track performance against goals when defining measure goals. (Choose two.)

  • A. Specification
  • B. Aggregation
  • C. Range
  • D. Value
  • E. Attribute
  • F. Quantity

正解:D、E


質問 # 69
Which two statements regarding the Decomposition scheduled process are incorrect? (Choose two.)

  • A. It creates or updates an order forecast, used by Supply Chain Collaboration to publish to suppliers.
  • B. It received supplier commits.
  • C. It reads published planning data from interface tables.
  • D. It does not recognize forecast exceptions.

正解:B、D


質問 # 70
Which KPIs are available to measure forecasting accuracy and specify how these measures aggregated from item-organization level to higher levels.

  • A. MAPE, MAD, and Bias are used to measure forecast accuracy. MAPE and Bias are aggregated using weighted average. MAD is aggregated using sum.
  • B. MAPE, MFE, and Bias are used to measure forecast accuracy. MAPE and MFE are aggregated using weighted average. Bias is aggregated using sum.
  • C. MAPE, MFE, and Bias are used to measure forecast accuracy. MAPE and Bias are aggregated using weighted average. MFE is aggregated using sum.
  • D. MAPE, MAD, and Bias are used to measure forecast accuracy. MAD and Bias are aggregated using sum. MAPE is aggregated using weighted average.

正解:D


質問 # 71
Which three options represent predefined hierarchies in Planning Central? (Choose three.)

  • A. Demand Class
  • B. Pricing
  • C. Business unit
  • D. Resource
  • E. Exception Type
  • F. Sales Channel

正解:A、C、D


質問 # 72
Cost accounting captures costed transactions that are picked up by the cost processor. Which is not picked up by the cost processor?

  • A. supplier invoices interfaced from Cloud Payables
  • B. shipping, receiving, and inventory transactions from manufacturing
  • C. period close adjusting journal entries for Payroll
  • D. invoices and revenue interfaced from Cloud Receivables

正解:D


質問 # 73
You are setting up the plan page layout for your customer.
In which of these requirements would you use an Infotile?

  • A. Showing a breakdown of exception in a pie chart
  • B. Showing inventory values by product category
  • C. Showing on-hand value compared to targets
  • D. Showing customer demand trend over a specific time period
  • E. Showing inventory value across time

正解:E


質問 # 74
Your customer has loaded shipment history of 1/1/14 through 12/31/16 and wants to generate a monthly forecast of 1/1/17 through 12/31/17 based on two-year shipment history.
When creating a demand plan, which two plan scopes and demand plan options should your customer use? (Choose two.)

  • A. For demand plan option, add forecast shipments as forecasting profile, and enter historical buckets as 24.
  • B. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/15, enter history end date as 12/31/15, and enter forecast start date as 1/1/17.
  • C. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/15, forecast start date as 1/1/17, and enter forecast end date as 12/31/17.
  • D. For plan scope, select plan horizon days as 365, forecasting calendar as Gregorian, and forecasting time level as month.
  • E. For plan scope, select plan horizon as 12 months, forecasting calendar as Gregorian, and forecasting time level as month.
  • F. For demand plan option, add forecast shipments as forecasting profile, enter historical buckets as 24, and enter forecast buckets as 12.

正解:D、F

解説:


質問 # 75
Your customer wants to be able to manually change the input values in purchase orders and transfer orders for the suggested plan recommendations. Which two recommendations are released by supply chain planning to Oracle Supply Chain Orchestration Cloud? (Choose two.)

  • A. Schedule planned orders for make, buy, and transfer of supplies
  • B. Reschedules of existing make, buy, and transfer supplies
  • C. New planned orders for make, buy, and transfer of supplies
  • D. Reschedules of sales orders, make, and buy

正解:B、C


質問 # 76
Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a different supplier globally.
How should they set this up for the easiest maintenance, going forward?

  • A. Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
  • B. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.
  • C. Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
  • D. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.
  • E. Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.

正解:C


質問 # 77
Demand planner opens the pre-seeded plan summary of the demand plan and wants to analyze the forecast results. Describe the steps to review and analyze the forecast results.

  • A. Click "Revenue and Margin" tile. Review the "Revenue by Period" graph and pick a specific period. Right-click on a period, click Drill To -> Default Group -> Revenue Analysis to open the table and review the details.
  • B. Click "Revenue and Forecast" tile. Review "Revenue by Period" graph and pick a specific period. Right-click on a period, click Drill To -> Default Group -> Forecast Analysis to open the table and review the details.
  • C. Click "Forecast Comparison in the thousands" tile. Review "Forecast Comparison by Product Category" graph and pick a product category. Right-click on product category, click Drill To -> Default Group -> Forecast Analysis to open the table and review the details.
  • D. Click "Demand at Risk in thousands" tile. Review "Demand at Risk by Product Category" graph and pick a product category. Right-click on product category, click Drill To -> Default Group -> Demand Analysis to open the table and review the details.

正解:C

解説:


質問 # 78
What are two characteristics of an 'Item' organization? (Choose two.)

  • A. It does not physically of financially track material storage or movement.
  • B. It includes parameter definition, including lot. serial number, and item sourcing rules.
  • C. It is ideal for deployments where inventory management may not be installed.
  • D. It requires financial and accounting setups.

正解:A、C


質問 # 79
......


Oracle 1z0-1066-22試験は、Oracle Planning and Collaboration Cloudソリューションを実装および構成する専門家の専門知識を証明する重要な認定資格です。この試験は、Oracle Planning and Collaboration Cloudに関連するさまざまなトピックをカバーし、候補者にプラットフォームについて良い理解を持っていることが求められます。適切な準備と勉強により、候補者は試験に合格し、Oracle Planning and Collaboration Cloud 2022 Implementation Professional認定を取得することができます。

 

検証済み1z0-1066-22問題集と解答で最新1z0-1066-22をダウンロード:https://jp.fast2test.com/1z0-1066-22-premium-file.html

更新された100%カバー率でリアル1z0-1066-22試験問題で100%合格保証が付きます:https://drive.google.com/open?id=1X4TqWzWyXr43_NzZau5iJSCg2Ickwg5z


弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

我々の働いている時間: ( GMT 0:00-15:00 )
月曜日から土曜日まで

サポート: 現在連絡 

English Deutsch 繁体中文 한국어